Power Boards / Undertakings / PSU Closing in 0 days TDR #31934267

Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau

Issued by Boards / Undertakings / PSU · mohammadabad, Uttar Pradesh
Tender Value
16.35 Lakhs
Estimated cost
Bid Submission
19 May 2022
0 days left
EMD
34000
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
mohammadabad → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau

BOQ

Name of Work: Civil works related to construction of damaged Security wall at 132 kv S/s Mohammadabad, District - Mau
Sl. No. Item Description
1Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01)
2Clearing jungle including uprooting of rank vegetations, grass, bush,wood, trees and saplings of girth upto 30cm measured at a height of 1.0m above ground level and removal of rubbish upto a distance of 50m outside the periphery of UPPCL area cleared. (CSI No. 4.08)
3Concrete with4cm gauge I class brick ballast, coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.01)
4Concrete work with 40 mm gauge brick ballast obtained from breaking brick bats (brick bats supplied by the department free of cost) in proportion of 12:6:1 with coarse sand (FM 1.8 to 2.5) and cement includingcost of all labour,materials, T&P etc required for proper completion of work. (CSI No. 5.20)
5Cement concrete with 2cm gauge approved hard stone ballast,coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 1:1.5:3.including supply of all materials, labour,side shuttering ifrequired and T&P etc. required for proper completion of work(CSI No. 5.21)
6RCC work with cement approved coarse sand(F.M. 1.8 to 2.5) and2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:1.5:3in lintels of doors and windows, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. . (CSI No. 5.23)
7RCC work with cement approved coarse sand(F.M. 1.8 to 2.5) and2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)
8RCC work with cement, approved coarse sand (F.M. 1.8 to 2.5) and2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3in RCC T beam-slab and column, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P . (CSI No. 5.29)
9First class brick (class-150) work in 1:6 cement and coarse sand(F.M.1.8 to 2.5) mortar in foundation and plinth including supply of allmaterials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)
10First class brick (class -150) work in 1:6 cement and coarse sand (FM 1.50 to 2.0) mortar in super structure including necessary cutting and moulding of bricks as required and also including honeycomb brick workfor wall of one brick thickness, including supply of all materials, labour and T&P etc. required for proper completion of work. (SI No. 6.01+6.07+6.08).
11Brick work in foundation & plinth with old dismantledbricks (supplied by department free of cost) and coarse sand of F.M. 1.8 to 2.5mortar in 1:6 including supply of all other materials, labour, removing mortar & cleaning of old & used bricks,T&P etc complete.(CSI No. 6.18)
12Providing & fixing 1 mm.thick M.S. sheet garrage door with frameof 40x40x6mm angle iron,diagonal bracings with 50x5 mm flat and 5 mm thick M.S. gusset plates at thejunctions and corners including supply and fixing of necessaryfitting, 2 no lock rail of 16 dia,375 mm long and including pintel hooks at the top and bottom, applying a priming coat of red oxide paint on all sides complete . (CSI No. 9.34)
13Supply and fixing of 32 mm. thick Shisham wood fully glazed door and window shutter including supply and fixing ofwooden cleats and stoppers and including fixing and adjustment ofhinges bolts, locks, handles, springs and/or other fittings but excluding their supply and including fixing the glass panes with putty and necessary screws (Glass panes to be 4 mm thick.)(CSI No. 8.27)
14Mild Steel or Iron work in heavy sizes such as trusses built upgates, door frames, record, racks roof work gates etc. wrought torequired form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01)
15TMT/Tor steel in plain work such as reinforced concrete orreinforced brick work (when not included in an over all rates)wrought to required shape as necessary including bending forproper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor)(CSI No. 9.03)
16P/F Concertina coilfencing with required dia. 600 mm upto 3 M height of wall between existing angle iron ‘Y’ shaped placed 2.4 M or 3.0 M apart and with 6 horizontal R.B.T. stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron all complete ( No. of rounds will be 7 to 8 in one Meter length) as per direction of Engineer I/C with reinforced barbed tape (R.B.T.)/ Spring core (2.5mm thick ) wire of high tensile strength of 165 kg/Sqmm with tape ( 0.52 mm thick ) of supreme make or equivalent and weight 43.478 gm/meter ( cost of MS angle, C.C. blocks shall be paid separately).(CSI No. 9.37)
1712 mm thick plaster with cement mortar consisting of one part of cement & six part of coarse sand(1:6),minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.09)
182.5 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specifiedand removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work.without base CC(CSI No. 12.02)
19Painting or varnishing new iron work in small areas or new woodwork with one coat of ready mixed priming paint and one coat ofapproved superior quality ready mix paint \"Luxol\" or equivalentbrand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)
20Painting or varnishing new iron work in small areas or new wood work for every coat after first coat of approved superior quality ready mixed paint “Luxol” or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950 (S.I. No 13.02)
21Finishing walls with water proof cement paint of approved madelike \"Super Snowcem\" or equivalent quality on new work withtwo coats to give an even shade including supply of allmaterials, labour etc. required for proper completion of work. (CSI No. 13.17)
22Finishing walls with water proof cement paint of approved made like “super snowcem” or equivalent qualityfor each coat of water proof cement paint after the first two coats to give an even shade including supply of all materials, labour etc. required for proper completion of work. (S.I. No. 13.18)
23Dismantling brick work or stone work in lime or cement mortar andincluding stacking of materials as directed by theEngineer-in-charge within a distance of 60 metres. (CSI No. 15.01)
24Removal of cement mortar from dismenttled bricks and stacking in countable position at place as directed by the Engineer in charge, including cost of all labour and T&P required for proper completion of work. (CSI No. 6.22)
25Add for extra labour and materials for plaster over rough face ofone brick thick wall. (CSI No. 11.12)
26Providing (12x15) mm section groove in plasterincluding all material, labour andT&P etc. required for proper completion of the work. (CSI No. 11.16)
27Same as in item no.19 (CSI No.13.01) above but for every coat on previously paintedold wood or iron work including its sand papering,rubbing andcleaning as required, for proper completion of work. (CSI No. 13.03)
28Same as in item no.21 (CSI No.13.17) above but for each coat of water proof cement paint. on previously treated surface.(CSI No. 13.19)

AI Tender Summary

OUR REF NO 31934267
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 16.35 Lakhs
LAST DATE 19-05-2022
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau Civil Works Related To Construction Of Damaged Security Wall At 132 Kv Sub Station Mohammadabad Mau
Basic Detail
Tender No Tender Notice 03(07)/ECTC/GKP/2022-23
Bidding Type Tender
Location
City mohammadabad
State Uttar Pradesh
Key Dates
Publish Date 21 Apr 2022
Submission Date 19 May 2022
Open Date 21 May 2022
Finance
Tender Value 16.35 Lakhs
Tender Fee 2360
EMD 34000
Exemption Not Available
Document List
e4e44016-599e-45db-b648-a17f8a33f58a.html
BOQ_1104337.xls
TD307.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 21, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
May 19, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 21, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

e4e44016-599e-45db-b648-a17f8a33f58a.html

xls

BOQ_1104337.xls

pdf

TD307.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail