Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #31927041

Tender For Rural Piped Water Supply To 4 Nosof Clubbed Up Pws Schemes Underpottangiblock In The District Koraput-4 Nos Of Clubbed Up Pws Schemes I.E Tumbiguda, Talakanti, Chikalmari And Sankar Under Pottangi Block In The District Koraput

Issued by Government Departments · pottangi, Odisha
Tender Value
2.78 Crore
Estimated cost
Bid Submission
02 May 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
pottangi → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Rural Piped Water Supply To 4 Nosof Clubbed Up Pws Schemes Underpottangiblock In The District Koraput-4 Nos Of Clubbed Up Pws Schemes I.E Tumbiguda, Talakanti, Chikalmari And Sankar Under Pottangi Block In The District Koraput

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Apr-2022 Annexure of the Price Bid Other 02-May-2022
2 28-Apr-2022 Delete of cluase no 4.4 C from SBD Other 02-May-2022

BOQ

Name of Work: RURAL PIPED WATER SUPPLY TO 4 NOSOF CLUBBED UP PWS SCHEMES UNDERPOTTANGIBLOCK IN THE DISTRICT KORAPUT.
Sl. No. Item Description
1BILL OF QUANTITY FOR PWS TO TUMBIGUDA GP TALAGOLURUUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
2Zone-I
3Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,Compound wall for pump house ,site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to I of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
4Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
5The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
6BILL OF QUANTITY FOR PWS TO TUMBIGUDA GP TALAGOLURUUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
7Zone-2
8Supplying all materials, labour, T&P etc complete in all respect for construction of collection cum filter chamber including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Gof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
9Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
10The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
11BILL OF QUANTITY FOR PWS TO TALAKANTI GP KOTIA UNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
12Zone-I
13Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond,, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
14Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
15The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
16BILL OF QUANTITY FOR PWS TO PHULAPADARA GP KOTIA UNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
17Zone-2
18Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
19Designing , construction, testing and commissioning of 10,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
20The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
21BILL OF QUANTITY FOR PWS TO KODEAMBA & SALEMPADAR GP KOTIAUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
22Zone-3
23Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
24Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
25The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
26BILL OF QUANTITY FOR PWS TO MATALAMBA GP KOTIAUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
27Zone-4
28Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
29Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
30The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
31BILL OF QUANTITY FOR PWS TO CHIKALMARI GP GANGARAJPURUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
32Zone-1
33Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to L of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
34Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
35The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
36BILL OF QUANTITY FOR PWS TO CHIKALMARI GP GANGARAJPURUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
37Zone-2
38Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
39Designing , construction, testing and commissioning of 50,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
40The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
41BILL OF QUANTITY FOR PWS TO SANKAR GP PUKALIUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
42Zone-1
43Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
44Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
45The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.
46BILL OF QUANTITY FOR PWS TO SANKAR GP PUKALIUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT.
47Zone-2
48Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system.
49Designing , construction, testing and commissioning of 50,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge.
50The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5.

AI Tender Summary

OUR REF NO 31927041
AUTHORITY Government Departments
TENDER VALUE 2.78 Crore
LAST DATE 02-05-2022
Authority
Authority Name Rural Water Supply And Sanitation Circle
Work Description Tender For Rural Piped Water Supply To 4 Nosof Clubbed Up Pws Schemes Underpottangiblock In The District Koraput-4 Nos Of Clubbed Up Pws Schemes I.E Tumbiguda, Talakanti, Chikalmari And Sankar Under Pottangi Block In The District Koraput
Basic Detail
Tender No 01/SE/RWSS/KPT/22-23/08.04.22
Bidding Type Tender
Location
City pottangi
State Odisha
Key Dates
Publish Date 28 Apr 2022
Submission Date 02 May 2022
Open Date 04 May 2022
Finance
Tender Value 2.78 Crore
Tender Fee 10000
EMD Ref. Documents
Exemption Not Available
Document List
2pottangi.pdf
BOQ_396700.xls
Tendernotice_1.pdf
7c27f6ba-8dd0-4f79-8919-4e15a762e8a7.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 28, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
May 02, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 02, 2022
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 02, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 04, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

2pottangi.pdf

xls

BOQ_396700.xls

pdf

Tendernotice_1.pdf

html

7c27f6ba-8dd0-4f79-8919-4e15a762e8a7.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders