Tender For Rural Piped Water Supply To 4 Nosof Clubbed Up Pws Schemes Underpottangiblock In The District Koraput-4 Nos Of Clubbed Up Pws Schemes I.E Tumbiguda, Talakanti, Chikalmari And Sankar Under Pottangi Block In The District Koraput
Tender Overview
Project Description
Tender For Rural Piped Water Supply To 4 Nosof Clubbed Up Pws Schemes Underpottangiblock In The District Koraput-4 Nos Of Clubbed Up Pws Schemes I.E Tumbiguda, Talakanti, Chikalmari And Sankar Under Pottangi Block In The District Koraput
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Apr-2022 | Annexure of the Price Bid | Other | 02-May-2022 |
| 2 | 28-Apr-2022 | Delete of cluase no 4.4 C from SBD | Other | 02-May-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | BILL OF QUANTITY FOR PWS TO TUMBIGUDA GP TALAGOLURUUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 2 | Zone-I |
| 3 | Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,Compound wall for pump house ,site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to I of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 4 | Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 5 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 6 | BILL OF QUANTITY FOR PWS TO TUMBIGUDA GP TALAGOLURUUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 7 | Zone-2 |
| 8 | Supplying all materials, labour, T&P etc complete in all respect for construction of collection cum filter chamber including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Gof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 9 | Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 10 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 11 | BILL OF QUANTITY FOR PWS TO TALAKANTI GP KOTIA UNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 12 | Zone-I |
| 13 | Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond,, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 14 | Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 15 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 16 | BILL OF QUANTITY FOR PWS TO PHULAPADARA GP KOTIA UNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 17 | Zone-2 |
| 18 | Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 19 | Designing , construction, testing and commissioning of 10,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 20 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 21 | BILL OF QUANTITY FOR PWS TO KODEAMBA & SALEMPADAR GP KOTIAUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 22 | Zone-3 |
| 23 | Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 24 | Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 25 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 26 | BILL OF QUANTITY FOR PWS TO MATALAMBA GP KOTIAUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 27 | Zone-4 |
| 28 | Supplying all materials, labour, T&P etc complete in all respect for construction of Collection cum filter chamber, construction of Compound wall for OGR , Construction of Cross bond, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such asGI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to G of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 29 | Designing , construction, testing and commissioning of 20,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all completeas per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 30 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 31 | BILL OF QUANTITY FOR PWS TO CHIKALMARI GP GANGARAJPURUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 32 | Zone-1 |
| 33 | Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5and Annexure-A to L of the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 34 | Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 35 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 36 | BILL OF QUANTITY FOR PWS TO CHIKALMARI GP GANGARAJPURUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 37 | Zone-2 |
| 38 | Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 39 | Designing , construction, testing and commissioning of 50,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 40 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 41 | BILL OF QUANTITY FOR PWS TO SANKAR GP PUKALIUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 42 | Zone-1 |
| 43 | Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 44 | Designing , construction, testing and commissioning of 30,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with 80 mm dia GI pipe - 14 mtr and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 45 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
| 46 | BILL OF QUANTITY FOR PWS TO SANKAR GP PUKALIUNDERPOTTANGI BLOCK OF KORAPUT DISTRICT. |
| 47 | Zone-2 |
| 48 | Supplying all materials, labour, T&P etc complete in all respect for construction of RCC roof building pump house,construction of Compound wall for pump house & OGR , Construction of walk way, site development including laying, testing and commissioning of Rising main & Distribution system pipe line such as GI, HDPE pipe lines etc. along with required fittings & specials and construction of valve chamber ,Individual house hold connection ( FHTC) , Installation of pumping unit , Internal electrification etc. as per detail scope of work & technical specification , quantity of work mentioned in section -5 and Annexure-A to Lof the DTCN. All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimensions are as per supplied drawings and as per direction of the Engineer-in-charge. All work shall be completed in such a manner that entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2 mg/ ltr without any lakage in the entire PWS system. |
| 49 | Designing , construction, testing and commissioning of 50,000 ltr capacity circular shape flat bottom with dome shape RCCon the groundreservoir including supplying , fitting, fixing of M.S and aluminuim ladder ,water level indicator, lightening arrester 4 nos. 80mm CI puddle collar 4 nos. CI MH cover, Inlet & Outlet arrangement with and soil testing & drawing design etc. testing of the joints all complete fitting and fixingdoubleflanged CI sluice valves/NR Valves/CI single Air Valve of standard make providing CC M-25 for RCC work with 20mm& down grade size hg chips with 20mm thick cement plater over the cement concrete work, cement punning over plaster surface and painting 2 coats of water proofingweather coat etc. all complete as per approved drawing and design including testing of soils and as per details of scope of work as per direction of Engineer-in-Charge. |
| 50 | The contractor shall maintain the PWS project for Five (5) calender years from the completion date of pws scheme (including defect liability period of one year) in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate) required quantity of supply water taking supply hour as 8 hour/ day without facing any problem. The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complaint either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & technical specification mentioned in section-5. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.