| 1 | Yard leveling |
| 2 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 4 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 5 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 6 | 16.91.2:Providing and laying factory made chamfered edge Cement Concrete paver blocksin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. |
| 7 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 8 | OD137436/2021-2022:Laying ofExcisingdepartmental interlocking cement concrete paverblock in the parking yard , drive way etcincluding25 mm thick course bed using6 mmaggregate etc complete as directed by engineer in charge |
| 9 | OD137459/2021-2022:Engaging coolie |
| 10 | OD137460/2021-2022:Engaging fitter |
| 11 | OD137461/2021-2022:Providing GI Manhole cover of size 1m x1 m100 kg as directed by departmental officers at site |
| 12 | 50.18.9.19.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall |
| 13 | 50.18.9.22.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 110 mm dia Bend |
| 14 | 50.18.9.22.1:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia Elbow |
| 15 | 50.18.9.22.9:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -110 mm dia offset |
| 16 | 50.18.9.22.11:Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes,including jointing with PVC solvent cement - 110 mm dia Socket/ coupling |
| 17 | OD138029/2021-2022:Supplying and providing Manhole coversof size 60x60 suggested by engineer in charge |
| 18 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |