Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo 100 At Srinagar International Airport Humhama. Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo100 At Srinagar International Airport Humhama., srinagar-Jammu And Kashmir

Public Health Engineering Department-PHED has published Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo 100 At Srinagar International Airport Humhama. Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo100 At Srinagar International Airport Humhama.. Submission Date for this Tender is 30-04-2022. Tube Well Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

31885885
Corrigendum : Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo 100 At Srinagar International Airport Humhama. Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo100 At Srinagar International Airport Humhama.
Open Tender
Indian
Jammu And Kashmir
srinagar
30-04-2022

Tender Details

Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo 100 At Srinagar International Airport Humhama. Construction Of 250 Mm Dia Gravel Packed Production Tube Well Near Cargo100 At Srinagar International Airport Humhama.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-Apr-2022 Technical Bid Corrigendum Technical Bid 30-04-2022

Key Value

Document Fees
INR 1000 /-
EMD
INR 61000.0 /-
Tender Value
INR 30.52 Lakhs /-

BOQ Items

Name of Work: Construction Of 250 mm Gravel Packed Production Tube WellNear Cargo @100 At Srinagar International Airport Humhama
Sl. No. Item Description
1Construction of production tube well by way of ; A.Drilling /boringof Pilot bore hole ;-The job includes drilling /boring of a pilot hole in all types of strata of soil i.e. hard /rock /soft/loose boulders etc, up to a depth of max 150 meters. The job shall have to be taken up strictly in accordance with the hydro-geological survey and report is to be appended before the start of the work and execution thereof. The type of well to be constructed shall be strictly in light of the report and consent bt the hydrologist experts and report. The collection of water samples at the requisite depth, shall have to be collected by available means in the best suitable meansby the form, as per site requirements. The soil samples are to be collected in plastic boxes with proper labeling. These samples need to be deposited in the divisional office for future reference. Specifications: a) Dia of Pilot hole =125 mm b) Depth of pilot hole =150 mtrs Max. B. Construction of Production Tube Well :- After successful completion of the pilot bore and positive (within limits) water sample test report , the jobis to be continued for construction of a full-fledged production tube well at the same spot by way of the reaming /ODEX method ( in case of hard rock strata if encountered; to be decided by the hydro-geologist in consultation with the departmental experts) to the desiredwidth /size . Broad band technical specification of the pilot hole & production well by and as required by the drilling procedure: Production Well a) Dia of production tube well= 550 mm b) Depth of Production well =150 mtrs (May increase or decrease with condition of requirement report -Method type of Drilling /technique i)By D.C.M/ R.C.M Method ii) By ODEX Method. The construction of production tube well , casing design and the No. of Screen/ length of each screenand positioning thereof shall be the full responsibility of firm/ agency strictly as per the hydro-geologist’s report framed in consultation with the departmental expert/engineer. IS:Code-2800 Part A
2Providing, Lowering and fitting of Heavy duty M.S Casing pipe ERW as per relevant IS Codes. The jigs and fixtures for lowering the casing pipe are to be provided by the firm. Providing and fitting of Bail Plug/ Bottom Plug of required dia at the bottom of the Pipe assembly of the the well . Technical Features of Pipe; Min dia of Casing Pipe =250 mm(as per site design) Length of Each Pipe= 3 Mts Thickness of Pipe =8.4 mm Max. depth of Pipe=150 Mtrs Slotted Pipe …….. At appropriate Aquifer Zones Pipe Coating ……. IS Code for Pipe ……. IS-4270:2001 (Grade Fe 410)Third Revision
3For 250 mm dia MS Blind Pipe (for 110 Mtrs)
4For 250 mm dia MS Slotted pipe (for 40 Mtrs)
5Providing and Shrouding of Pea Gravel as per IS : 4097 – 1967, of assorted size aroundannular space between the casing pipe and the well surface has to be filled with a gravel pack to act as a filter medium. (Quantity shall be subject to the actual measurements at site)
6Development of Tube Well :-Development of the Tube well shall be done in accordance to IS :11189 -1985. The Job includes charges on accounts of complete development of the well after completion of drilling/boring and lowering of M.S. Casing pipe and filling of pea Gravel if required (in Case of Artificial gravel pack) .The compressor used should have pressure ratings of 1100 PSI with a delivery of 300 cfm. The job shall include cleaning and stabilization of the well by inserting high compressed Air pressure to remove the suspended /stick/loose material from the casing and in the well bore surface. Development of well by compressor = 04 hrs/mtr of screen. The development has to be carried in presence of in charge site Engineer and as per the expert advice of consultant hydro-geologist if needed. Yield Test:- The job shall also include for carrying out yield test of the well bysubmersible pumping unit of desired capacity to be decided by the in-charge engineer . All other job’s which have not been specifically specified in the works shall have to be included as required and in accordance with relevant ISBIS codes. The grouting & sealing of the tube well needs to be done to ensure safe sanitary conditions. An apron around the well (mix shall be M10 grade) & slopping away from it to protect the well from pollution has to be constructed to prevent contaminated water flowing back into it. The casing pipe has to be anchored withthe apron by welding ISMC-150 steel bracing with crates & sufficient welding area 2 mtrs length each bracing embedded within the apron (4 bracing). The complete well thus is to be handed over to the territorial Mechanical Division for harnessing. Technical Specifications Minimum Run for compressor ….. 04 Hrs/mtr of screen Yield Test for Water (till desired results) … Min 30 Hrs i. Apron Size= 2.5 mtr × 2.5 mtr. ii. Apron depth at skirt = 300 mm. iii. Apron depth at well casing= 350mm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail