Laying Fixing L / F Of Pipes, Construction Of Chain Link Fending, Retaing Wall Wss Bachloo G.B. L / F Of Pipes, Const. Of Chain Link Fending, Retaing Wall Wss Bachloo G.B.
Tender Overview
Project Description
Laying Fixing L / F Of Pipes, Construction Of Chain Link Fending, Retaing Wall Wss Bachloo G.B. L / F Of Pipes, Const. Of Chain Link Fending, Retaing Wall Wss Bachloo G.B.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-May-2022 | Extension of date | Date | 18-May-2022 |
| 2 | 18-May-2022 | Date extension | Date | 28-May-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 2 | All kinds of soils |
| 3 | Ordinary rock |
| 4 | Laying and fitting of pipes complete with G.I fittings excluding trenching and refiling etc. (externel work) |
| 5 | 15mm dia GI pipe |
| 6 | Installation of house hold connections to unconnected households including providing and fixing of necessery pipes specials,earth work at connections whatever necessery. |
| 7 | Backfilling availabel excavated earth (excluding rock) in trenches, plinth, sides of foundness etec. In layers not exceeding 20 cm in depth, consolidating each deposited layer by raming and watering, lead upto 50m and lift upto 1.05m. |
| 8 | Providin and laying of dry stone soling tightly hand packed on horizontal levels |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level (1:4:8) 1 cement, 4 coarse sand, 8 graded stone aggregate 40mm nominal size) crushed. |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with( 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 11 | Reinforced cement concrete work in walls ( any thickness) including attached pilasters, plinth & string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding the cost of cnetring, shuttering, finshing and reinforcement (1:1.5:3) 1 cement: 1.5 course3 graded stone aggregate 20mm nominal size) |
| 12 | Providing and laying in position specified grade of cement concret e in 1:3:6 nominal mix. Excluding cost of centering and shuttering. |
| 13 | Providing Reinforcement to RCC works including bending, binding, cutting, straitening and placing in position complete. |
| 14 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 15 | Centering and shuttering including struting proping and removal of form work |
| 16 | Foundations, footings, bases for columns |
| 17 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
| 18 | 12 mm thick Cement Plaster in 1:6 nomnal mix. |
| 19 | Providing and Fixing of chain link fencing. |
| 20 | Painting two or more coats of synthetic enamel of approved brand and manfucture including priming coat of approved brand and manufacture |
| 21 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 22 | Carriage of material from sourse to dumping site at road by mechanical transport.including, loading unloading and stacking complete . |
| 23 | Cement and steel for average lead of 10 km |
| 24 | Sand for average lead of 35 km |
| 25 | 20mm Aggregate for average lead of 20 km |
| 26 | 40mm Aggregate for average lead of 20 Km |
| 27 | Stone soling for average lead of 10 km |
| 28 | Extra carraige of material from dumping site to acctual work site by mannual labour Avg Lead 200 mtr |
| 29 | cement |
| 30 | Steel |
| 31 | sand and 20 mm Aggregate |
| 32 | 40 mm Aggregate |
| 33 | soling stone |
| 34 | Carraiage of pipes form divisional stores Qazigund to dumping site on road by MT for average lead of 10km |
| 35 | 15mm Dia G.I pipes |
| 36 | Extra Carraiage of pipes form nearestdumping site to actual site of work by mannual labour for average lead of 500 mtrs |
| 37 | 15mm Dia G.I pipes. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender