Annual Rate Contract For Erection Of Scaffolding, Liaisoning Of Hrsg ( Boiler ) And Replacement Of Tube Of Hrsg, Rcf ( Trombay Unit )
Name of Work:Annual rate contract for Erection of scaffolding, liaisoning of HRSG (Boiler) and replacement of tube of HRSG, RCF (Trombay unit)
Sl. No.
Item Description
1
I. Erection of scaffolding ( Inside / Outside)
2
Erection of scaffolding inside HRSG
3
Erection of scaffolding ( Outside) at various location as per Plant requirement
4
II. Replacement of Boiler Tubes, Bends & Lug sets (including radiography, Stress Reliving & equipment mobilization charges)
5
CPH 1 &2 Tube ( Size OD 38.1 MM X 2.7 MM Thk MOC SA 213 M Gr/ TP 304)
6
HP Economiser ( Size OD 38.1 MM X 2.7 MM Thk \" MOC SA 210 M Gr A1)
7
HP Evaporator ( Size OD 38.1 MM X 2.7 MM Thk \" MOC SA 210 M Gr A1)
8
HP Primary Super Heater1) Size OD 38.1 MM X 2.7 MM ThkMOC SA 213 M Gr T11 \"2) Size OD 38.1 MM X 4.2 MM ThkMOC SA 213 M Gr T22
9
HP Primary Super Heater (Size OD 38.1 MM X 3.6 MM ThkMOC SA 213 M Gr T91)
10
HP SecondarySuper Heater (Size OD 38.1 MM X 3.25 MM ThkMOC SA 213 M Gr T91)
11
Lugsset ( One male with two female)
12
III. Statutory Charges for annual re-certification of Boilers (To be paid by online mode only)
13
Statutory charges for dry inspection
14
Statutory charges for hydro-test
15
Charges for special visit of IBR authority
16
IV: Other Activities for Boiler Authority Visit
17
Lump sum charges for dry inspection, hydro testing of Boiler, ground inspection of material, along with activities like arranging conveyance for visit of IBR Authority for all stage wise inspections, dry inspection hydro test witnessing and any special visit, completion of ground inspection & statutory certification of IBR material in Boiler Office submission of all document in Boiler office and collecting all the approval / certificate from Boiler Office & submit the same in Plant, Pay statutory charges in Boiler Office for all activities during certification process as per SOW
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.