Paschimanchal Vidyut Vitran Nigam Limited has published Repair And Testing Of 10- 250 Kva Damaged Distribution Transformers At C.T.R. Workshop, Gajraula- 1 Shifting, Dragging And Stacking Of Damaged T / Fs To Be Repaired In The Workshop At Proper Place In Cutting Yard & Pre-Checking / Physical Inspection, . Submission Date for this Tender is 23-04-2022. Cleaning and Disinfecting Solutions Tenders in meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Shifting, dragging and stacking of damaged T/fs to be repaired in the workshop at proper place in cutting yard & pre-checking/ physical inspection, testingof transformer before dismantling i.e. Megger Test (if OK) then HV Test (if OK) then No-Load & Load Losses Tests as per instructions of Junior Engineer in charge. (i) 10/16 KVA |
2 | (ii) 25 KVA |
3 | (iii) 63 KVA |
4 | (iv) 100 KVA |
5 | (v) 160 KVA |
6 | (vi) 250 KVA |
7 | Cutting of sealed T/fs top cover/ opening of nut and bolt of damaged t/f cover plate, de- tanking of core coil assembly dismantling of HV&LV Coils and other accessories, draining of T/f oil in sump well and weighing of scraps and shifting of all scrap to the store of JE in charge. (i) 10/16 KVA |
8 | (ii) 25 KVA |
9 | (iii) 63 KVA |
10 | (iv) 100 KVA |
11 | (v) 160 KVA |
12 | (vi) 250 KVA |
13 | Dismantling of core stampingand its cleaning ofdust and dirt. (i) 10/16 KVA |
14 | (ii) 25 KVA |
15 | (iii) 63 KVA |
16 | (iv) 100 KVA |
17 | (v) 160 KVA |
18 | (vi) 250 KVA |
19 | Assembly of core coils and fitting of other accessories requiring replacement such as press board support spacers and tapping etc.and also cutting of insulation required for coil assembly. (i) 10/16 KVA |
20 | (ii) 25 KVA |
21 | (iii) 63 KVA |
22 | (iv) 100 KVA |
23 | (v) 160 KVA |
24 | (vi) 250 KVA |
25 | Dragging of T/f Tank to washing Zone its cleaning by jet pump and washing by caustic soda shifting to open space for dryingProviding primer of red oxide on the inner and outer side of tank and painting inner side of T/fs including core channel and tie rod / core rods with heat proof zinc chromate paint and out side with two coats of synthetic grey enamel paint. The paint should be of Asian/Nerolec/Burger/ Dulux/British make only. Writing of PUC/ Unique No. of transformer readable paint color with the help of stencils design. (i) 10/16 KVA |
26 | (ii) 25 KVA |
27 | (iii) 63 KVA |
28 | (iv) 100 KVA |
29 | (v) 160 KVA |
30 | (vi) 250 KVA |
31 | Making of new HV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA |
32 | (ii) 25 KVA |
33 | (iii) 63 KVA |
34 | (iv) 100 KVA |
35 | (v) 160 KVA |
36 | (vi) 250 KVA |
37 | Making of new LV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA |
38 | (ii) 25 KVA |
39 | (iii) 63 KVA |
40 | (iv) 100 KVA |
41 | (v) 160 KVA |
42 | (vi) 250 KVA |
43 | Complete the core and coil assembly(CCA) by fitting HV & LV coils required insulating material and shifting it to oven for de-moisture (i) 10/16 KVA |
44 | (ii) 25 KVA |
45 | (iii) 63 KVA |
46 | (iv) 100 KVA |
47 | (v) 160 KVA |
48 | (vi) 250 KVA |
49 | Tanking of the complete core and coil assembly (CCA) in to the painted tank safely, filling of reclaimed / centrifuged/ fresh oil fitting of all accessories. (i) 10/16 KVA |
50 | (ii) 25 KVA |
51 | (iii) 63 KVA |
52 | (iv) 100 KVA |
53 | (v) 160 KVA |
54 | (vi) 250 KVA |
55 | Welding/ Tightening of nut and bolts of top cover of repaired T/f by electric welding filling Gap etc. properly including denting of tank if necessary and welding of MS plate 100x50x3 mm thick on the out side of the T/Fs contain unique no., capacity, name of the workshop etc. at proper place. (i) 10/16 KVA |
56 | (ii) 25 KVA |
57 | (iii) 63 KVA |
58 | (iv) 100 KVA |
59 | (v) 160 KVA |
60 | (vi) 250 KVA |
61 | Dragging the Repaired T/f to the testing zone for final testing with necessary record and after testing it should be re dragged / stacked at despatch area. (i) 10/16 KVA |
62 | (ii) 25 KVA |
63 | (iii) 63 KVA |
64 | (iv) 100 KVA |
65 | (v) 160 KVA |
66 | (vi) 250 KVA |
67 | General Cleaning of T&P / Machinery and stacking of material at suitable place |
68 | General clearness of store testing room, workshop floor, oven area, generator room, in cutting area, tanking area, assembly area, painting area by wiping, booming and wooden dust properly to keep floor clean by engaging proper man power for cleaning works. As required for cleaning works |