Construction Of Electrical Infrastruture For Releasing Of 80 Kw ( Lmv-2 ) Sanction Load In Favour Of M / S Bazar Retel Pvt. Ltd. Sri Mithun Ghosh S / O Sri Deepak Kumar Ghosh, Shop No. Ugf-I & Ii 177 / 34, Old Mehra Cinema, Guen Road, Aminabad, Luc
Tender Overview
Project Description
Construction Of Electrical Infrastruture For Releasing Of 80 Kw ( Lmv-2 ) Sanction Load In Favour Of M / S Bazar Retel Pvt. Ltd. Sri Mithun Ghosh S / O Sri Deepak Kumar Ghosh, Shop No. Ugf-I & Ii 177 / 34, Old Mehra Cinema, Guen Road, Aminabad, Lucknow & Other Associated Works In The Area Under Eudd ( Aminabad ) ” Under Deposit Head 2022-23
BOQ
| Sl. No. | Item Description |
| 1 | Safe carriage, loading-unloading with proper stacking of following materialfrom ESC-Daliganjto Work Site/JE -Dump Store– |
| 2 | (a) 11 KV3X70 SQ MM XLPE CABLE |
| 3 | (b)11 KV ST/TH C/J KIT O/D3X70 SQ MM |
| 4 | (c) ST POLE 11 MT LONG |
| 5 | (d) 11/0.4 KV 100 KVA T/F |
| 6 | (e) 11KV PININSULATOR |
| 7 | (f) 11KVPINWITH NUT |
| 8 | (g) 11 KV Pilfer Froof Metering Cubicle |
| 9 | Cost of material of 11 KV Double pole TPMO for Placement 100 KVA T/F of with DO fuse set(Alltherequiredmatrial for abovejob shall be provided by contractor except T/Fs) |
| 10 | Hoisting of 11KVXLPE cable3x70 sq mm on double pole with MS pipe 2 M longincluding its jumpering complete with clamps, nuts and bolts(all material arranged by contractor). |
| 11 | Chemical Earthing system with outer pipe diameter 50mm, inner Strip 40x6, length 3000 mm. galvanization up to 200 micro, earthing pipe with crystalline conductive mixture filled inside the pipe with anti-corrosion & high conductive along with 50 Kg(As per required) of BFC which should be capable to reducing the soil resistively with good moisture retaining capacity.(Specification of chemical earthing and drawing is hereby enclosed). All material shall by supply by the contractor. |
| 12 | Boring type earthing of 11 KV metering cubical by boring and lowering of 20 M deep or upto water level 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm(All the material will be arranged by the contractor). |
| 13 | Earthing of poles as per RESPO norms with earth rod. (All the materials supplied by contractor). |
| 14 | INSTALLATION & COMMISSIONING OF 11 KV Metering CUBICAL |
| 15 | All taxess as applicable shall be paid time to time extra. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents