| 1 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for following CORIOLIS MASS FLOWMETER FOR MSB UNIT as specified in Material Requisition. |
| 2 | GROUP-1Bidder to provide Tag Wise Price Break Up of Group-1in BoQ-2 from BoQ2 Sr.No. 1.01-1.06. |
| 3 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for following CORIOLIS MASS FLOWMETER FOR MSB UNIT as specified in Material Requisition. |
| 4 | GROUP-2Bidder to provide Tag Wise Price Break Up of Group-2 in BoQ-2 from BoQ2 Sr.No. 2.01-2.23. |
| 5 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for following CORIOLIS MASS FLOWMETER FOR MSB UNIT as specified in Material Requisition. |
| 6 | GROUP-3Bidder to provide Tag Wise Price Break Up of Group-3 in BoQ-2 from BoQ2 Sr.No. 3.01 (1P22-FT -810001) |
| 7 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for following CORIOLIS MASS FLOWMETER FOR MSB UNIT as specified in Material Requisition. |
| 8 | GROUP-4Bidder to provide Tag Wise Price Break Up of Group-4 in BoQ-2 from BoQ2 Sr.No. 4.01(1P22-FT -810002) |
| 9 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for following CORIOLIS MASS FLOWMETER FOR MSB UNIT as specified in Material Requisition. |
| 10 | GROUP-5Bidder to provide Tag Wise Price Break Up of Group-5 in BoQ-2 from BoQ2 Sr.No. 5.01(1P23-FT -150002) |
| 11 | Charges for SITE Supervision of Erection / Installation andTesting for scope as defined in MR for CORIOLISMASS FLOW METERS for MSB UnitSame rate is also applicable for 2 mandatory visits during MAINTENANCE SUPPORT/ SUPERVISORY SERVICE DURING WARRANTY/ DEFECT LIABILITY PERIOD |
| 12 | Per diem charges for upto 8 hours work on normal working days. |
| 13 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 14 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |