Execution Of Rural Piped Water Supply Schemes To Village Ganganarayanpur Under Purisadar Block And Village Sandharasasan Under Satyabadi Block In Puri District Including 5 Years Operation And Maintenance.
Tender Value
3.60 Crore
Estimated cost
Bid Submission
20 Apr 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
satyabadi → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Execution Of Rural Piped Water Supply Schemes To Village Ganganarayanpur Under Purisadar Block And Village Sandharasasan Under Satyabadi Block In Puri District Including 5 Years Operation And Maintenance.
BOQ
| Sl. No. | Item Description |
| 1 | 1). PWS TO GANGANARAYANPUR UNDER PURISADAR BLOCK |
| 2 | A.)DEVELOPMENT OF SITE1).Supplyingallmaterials,labour,T&PforFillingearth insideHeadworkssiteincludingwatering,rammingwith cost,carriage&royality ofmaterialsetc.allcompleteas per direction of Engineer-in-charge. |
| 3 | B.) CONSTRUCTIONOFCCAPPROACHROAD (15.0M)1).Supplyingallmaterials,labour,T&Pforprovidingearth work in excavation in foundation for road work in all kinds ofsoilwithintheinitialleadliftincludingdressingand levellingthebedanddepositingtheexcavatedmaterials away fromtheworksiteetc.allcompleteasdirectedbythe Engineer-in-charge |
| 4 | B-2). Filling foundation and plinth with sand well watered andrammedincludingallcost,conveyance,taxes,royaltyetc,complete. |
| 5 | B-3).Supplyingallmaterials,labour,T&Pandproviding C.C.(1:4:8) with 4cm size HG crusher broken metal including all cost,carrige royalty,taxes,andall labour involved for completion of item of work as directed by the Engineer-in-charge |
| 6 | B-4).Supplyingallmaterials,labour,T&Pandproviding BrickworkwithFly ashBricksincementmortar(1:6)to sideofCCroadworkusingfly ashbricksofsize25cnx 12cmx 8cm having crushing strength 75kg/cm2 for foundation and plinth including cost, conveyance,royalty of all materials as per specifications and direction ofEngineer-in-charge |
| 7 | B-5).Supplying, all labour T&P materials providing cement concrete (1:1.5:3) for with 12mm size HG crusher broken chipsincludingallcostofmaterials.labour,&conveyance charges with watering,curing etc all complete as per direction of Engineer-in-charge of the departmet. |
| 8 | B-6).12mm thick cement plaster (1:6) over brick masonry work including cost carriage and royality of all materials |
| 9 | C.)INTERNAL ELECTRIFICATIONRecessed wiring to light point / Exhaust fan point with 1.5 sqmm F.R. PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metalic PVC flexibleconductwith5Amp,250VpianotypeswitchISI marked and celling rose ISI marked mounted on MS box having front backelite cover of suitable size M.S. Box with1.0sqmmF.R.PVCinsulatedsinglecoremultistrand copper conductor and earth wire including all accessories andconnectedasperdirectionofengineer-in-charge( Make of wire = Finolex / L&T / Anchore / Havels / V Guard)( Deducting the cost of S/F 100mm x 60mm M.S. Box with backlite cover - 1 no )a) - do - Group A ( 1.1.1 - 1.24.2 ) up to 3 M |
| 10 | C-1b)- do - Group A ( 1.1.1 - 1.24.2 ) 4 M - 5 M |
| 11 | C-1c)- do - Group A ( 1.1.1 - 1.24.2 ) 5 M and above |
| 12 | C-2). Recessed wiring to Fan point in - do -b) - do - Group A ( 1.1.1 - 1.24.2 ) 4 M - 5 M |
| 13 | C-3).Supplyandfixingof16/18SWGmetalboxof following sizes ( Normal size ) in recess with suitable size of phenolic laminated sheet cover in front including cutting thewallandmakinggoodthesameincaseofrecesedconduct as required. |
| 14 | C-3b).180mm x 100mm x 60mm deep ( 1.24.5 ) |
| 15 | C-3C). 200mm x 250mm x 75mm deep ( 1.24.9 ) |
| 16 | C-4). Supply and fixing of 5 Amp Switch and 5Amp Socket outlet of ISI marked on existing board ( 1.25.1 + 1.25.4 ) |
| 17 | C-5). Supplying, providing all materials and labour T&P 3 Phasepilotlamp,with3nosholder,switch,bulbonIronBoard front Bakelite sheet cover complete fitting. |
| 18 | C-6).S/Fto180mmx100mmx60mm deep(Normal size)inrecesswithsuitablesizeofphenolic laminated sheetcover infrontincluding providingandfixing3pin 15 /16 Amp. Socket outlet 15/16 Amp. Piano type switch, connection, painting etc.as required (1.27) |
| 19 | C-7). Wiring of circuit/ sub-main along with earth wire with followingsizesofpvcinsulatedsinglecoremultistrand copperconductorwithISImarkedcoformingtoIS-694/ 1990 in 20mm dia non metalic heavy duty flexible conduct1.6mminrecessedPVCconductasrequired (Make of wire = Finolex / L&T / Anchore / Havels / V Guard )a) 2 x 1.5 sqmm + 1 x 1.0 sqmm ( 18.1 ) |
| 20 | C-7 b) 2 x 2.5 sqmm + 1 x 1.5 sqmm ( 18.2 ) |
| 21 | C-7c) 2 x 4 sqmm + 1 x 1.5 sqmm ( 18.3 ) |
| 22 | C-7 d) 2 x 6 sqmm + 1 x 2.5 sqmm |
| 23 | C-8). Supplying, providing, fitting and fixing 100AMPCopper cable socket with ranga soldering. |
| 24 | C-9).Supply,installation,testingandcommissioningof 100AMPPorcelainkitkatfuseonM.S.BoardwithM.S. Clamp by drilling holes with other fixing materials completewithfuselinksinterconnectionseartingetc.as required as per direction of EIC. ( Make Anchor / L&T /Havels ) |
| 25 | C-10).Supply,installation,testingandcommissioningof 32AMPTPNmainswitch(IS13940Part3/1993)on existing surface complete with fuse links interconnections eartingetc.asrequiredasperdirectionofEIC.(Make Simens / HPL / Anchor / L&T / Havels / C&S / RK ) 2.15.2 |
| 26 | C-11).Supply,installation,testingandcommissioningof 63AMPTPNmainswitch(Sl.no.1505,IS13940Part 3/1993)onexistingsurfacecompletewithfuselinks interconnectionseartingetc.asrequiredasperdirection ofEIC.(MakeSimens/HPL/Anchor/L&T/Havels/C&S / RK ) 2.15.2 |
| 27 | C-12). Supplying and fixing of batten holder of ISI marked includingconnectionetc.insteadofceilingrose(1.29-1.28 ) |
| 28 | C-13). Earthing with G.I. earth pipe 3 meter long 40mm dia ISImarkedincludingacessoriesandprovidingmasonry enclosurewithcoverplatehavinglockingarrangement and watering pipe etc. with charcoal and salt as required. (3.2 ) |
| 29 | C-14). Providing & fixing 6 no SWG G.I. wire in recess forloop earthing as required ( 3.17 ) |
| 30 | C-15). Supply and fixing A/C Ceiling Fan with all acessories and connections without regulator ( Make Havels - celocity Sparks / Khaitan-maganet / Orient - New breeze/Anchor-Rayalgold/CromptonGreaves-Highbreeze ) |
| 31 | C-16).Supplyandfixingofstripfittingwithcolourend platefor1X28W T 5tubewithelectronicballast including tube ( Make PAC / Bajaj / Philips ( Type - STC - 128 HFE )) |
| 32 | C-17).Supply,installation,testingandcommissioningof 24 watt Energy effcient T-5 street light fitting incl. fixing of 24 watt T-5 Lamps ( Make Bajaj / Havels ) including fixing of bracket and all accessories as per direction of EIC.a.) 2 X 24 watt Lamp |
| 33 | C-18).Supplyandfixingofelectficsteptypeceilingfan regulator in existing switchbox includingconnection with1.5 sqmm FR PVC insulated single core multistrand copper conductor with earthing the regulator as required (1.38 ) |
| 34 | C-19).Supply,installation,testingandcommissioningofCFL Bulb |
| 35 | C-19 b.) 11 watt CFL Bulb |
| 36 | C-20).Supplyingandfixingof63AMP TPNCopper Bus Bar |
| 37 | D.) SUPPLY AND INSTALLATION OF PUMP & MOTOR1). Supplying, of 5 HP Three Phase Vertical Submersible Pump set(for 1no PW) including 50% standby. (Model-GPQ 756125 |
| 38 | D-2).ControlPannelsuitablefor5.00HPSubmersible Pumpset consisting of main fuse contactor ( Cosmic star- delux Automatic Star Delta/ BCH ) Volt meter, Amp meter, SelectorSwitch,On/Offswitch,SinglePhasepreventor, Overloadrelay,PhaseIndicatoretc.enclosedinametal box. |
| 39 | D-3). Supply of 4.0mm2 x 3 core Submersible Flat cable(Finolex make ) |
| 40 | D-4). Supply of 25Sqmm 31/2 core Aluminium Armouredcable |
| 41 | D-5). Supply of 1000 x2000mm Shock Proof Rubber mat having thickness 13mm capable of withstanding 5W.V.confirming to its specification ( 10kg ) |
| 42 | D-6). Supplying of all labour, T&P and installation of 5 HP submersiblepumpsetincludingloweringofcolumnpipe with supply of Nut Bolt, rubber insertion sheet, installation of control pannel board, laying of flat cable & armed cable through suitable casing pipe including earth work and cost of all materials etc. all complete. |
| 43 | E.) TREATMENT UNIT1.)Providingchlorinationarrangementwithchlorinatorof requiredcapacityincludingcostofallmaterials,pipes, fittings, valves etc. including cost of installation etc. all |
| 44 | F.) CONSTRUCTION OF RCC ESRDesign,Drawing,Construction,Errection,Testing& Commissioning of200000 ltr. capacity capacity with 15 mtr.stagingRCCElevated StorageReservoir includingfittingfixingofMSladderfrombottomto top,M.S.pipesinlet,Outlet&valvesarrangement etc.all complete as per direction of E.I.C.1.Earthworkinexcavationinfoundationinallkindsof soil with in 50 m initial lead and 1.50 m initial lift including breakingofclodsto maximum5 cmto 7cm insize and laying in layernot lessthan 0.30m depthincludingleveling and dressing the bed etc all complete as per |
| 45 | G.) DISTRIBUTION SYSTEM1.)SupplyingalllabourT&Pmaterialsforearthworkin excavation of foundation in all kinds of soil (ordinary, Hard andslushysoil)includingfinedressingandlevelingthe bed with in initial lead of 50 mtr and initial lift of 1.50 mtr etc all complete as per the direction of EIC. ( excavation of earthtobedone0.90mtrabovethediaofpipeand 0.30mtr wider than the dia of pipe) |
| 46 | G-2).Supplyingalllabor,T&PforlayingofHDPE Pipe includingsupplyofjointingmaterialsetcallcomplete including cost of HDPE Pipe.a) 90mm HDPE Pipes |
| 47 | G-2b) 110mm HDPE Pipes |
| 48 | G-2c) 160mm HDPE Pipes |
| 49 | G-2c) 200mm DI Pipes |
| 50 | G-2c) 250mm DI Pipes |
| 51 | G-2c) 300mm DI Pipes |
| 52 | G-5).Suppluingfittinf,fixing &layingintrenchesdouble socket ductile iron bends confirming to IS:1538(Part-X) as per specification all complete including cost of benda) 200MM K7 DI |
| 53 | Supplying all labour T&P materials, fitting and fixing of CI sluice valves/ NR valve with double flanged ends for water works purposes for the following rating and nominal diameter`includingcostofnutboltandrubberinsertion transportationchargesallcompleteasperspecification anddirectionofEIC,butexcludingthecostofCIsluice valves / N.R. valves which will be supplied by thedepartment.80mm D/F C.I. sluice valve |
| 54 | 100mm D/F C.I. sluice valve |
| 55 | 150mm D/F C.I. sluice valve |
| 56 | 200mm D/F C.I. sluice valve |
| 57 | 250mm D/F C.I. sluice valve |
| 58 | 300mm D/F C.I. sluice valve |
| 59 | 150mm D/F C.I. N.R. valve |
| 60 | 200mm D/F C.I. N.R valve |
| 61 | 25mm CI Airvalve |
| 62 | Supplying all labour T&P materials, and fixing of single Air valve for water works purposes for the following diameter, including drilling the water main but excluding cost of Air valve and saddle complete as per specification and direction of EIC (Air valve & saddle will be supplied by theDeptt.) |
| 63 | Supplying all materials,labour,T&P for construction ofRCCsluicevalveandNRvalvechamberofinsidesize 0.90mx0.90mx1.20m ( 80mm to 200 mm dia C.I. S.V./NR Valve providing M20 Cement Concrete using 20 mm and downgradedsizeHGchipsincludinghosting&laying cost,conveyanceandroyaltywith10mmthickbase concrete in cement concrete (1:4:8)using 40mm size crusher broken hard granite metal, plastering inside wall, outsidewall30cmfromtopandtopofwallincement mortar(1:6)with neat cementpunning ,providing10cm thickRCC cover slab in cement concrete and M.S.reinforcement including excavation of chamber in all kinds of soil and refilling outside including transportation, taxes&royalties etc.allcomplete asper directionofEngineer-in-charge.( PH Analyssis, Item-7) |
| 64 | Supplying all materials,labour,T&P for construction of RCC Air Valve/ 50mm sluice valvechamber of inside size 0.750mx0.750mx1.20m ( 80mm to 200 mm dia C.I. S.V./NR Valve providing M20 Cement Concrete using 20 mm and down graded size HGchips includinghosting & layingcost,conveyanceandroyaltywith10mmthick base concrete in cement concrete (1:4:8)using 40mm size crusher broken hard granite metal, plastering inside wall, outsidewall30cmfromtopandtopofwallincement mortar(1:6)with neat cementpunning ,providing10cm thickRCC cover slab in cement concrete and M.S.reinforcement including excavation of chamber in all kinds of soil and refilling outside including transportation, taxes&royalties etc.allcomplete asper directionofEngineer-in-charge.( PH Analyssis, Item-7) |
| 65 | Supplyingallmaterials,labourT&Pandcuttingmetalled roadfortakingpipelinethroughandmakinggoodthedamaged as per direction of EIC.a)Metalled road |
| 66 | b) Ashalphat or Bituminous road |
| 67 | Supplying all labour, T&P for cutting C.C Road for layingof HDPE pipe |
| 68 | Supplyingalllabour,T&PforC.C(1:2:4with12mmsize hard granite chips and mending good the damages of C.CRoad for laying of PVC pipe line with all complete |
| 69 | Supplying all materials,labour and T&P for providing water connection(FHTC) to all house holdswith complete fitting fixingof PVC saddlewith ferule connection & laying of PVC pipe of average length of 6 to 12 mtr with all G.I fittings and taps ( As per the standard approved Drawing ) to allhouse holds etc all complete asper direction of EIC. |
| 70 | SupplyingalllabourT&P&materialsforHouse Connection opposite to ferruel side (after road crossings) for70LPCDprojects fornewconnectionstothehouse holdpremiseswithprovisionofconcretestandpost,GI pipe,& fittings etc complete in all respect as per directionof Engineer-in-Charge |
| 71 | Supplying all labour, T&P & materials for fitting & fixing of HDPE pipe of 20mm diasizeof maximum 6 mtr length on ferruel side for 303nos of connection and maximum 12 mtrlengthonoppositeof ferruelsidefor455nosof connection to accomodation the shifting of FHTC to suitableplaceinsidethepremisesofthebeneficiary complete in all respect etc. as per direciton of Engineer-in- charge. |
| 72 | Supplyingallmaterials,labour&T&Pforconstructionof RCC single mouth stand post including earth workin all kinds of soil with initial lead and lift with cement concrete (1:2:4)with12mmsizecrusherbrokenHardgranite chips, reinforcement , plastering with CM(1:4) with punningincludingcenteringandshutteringetcall complete fitting and fixing of , GI fittings 20mm elbow 1no, 20x15mm dia GI R/S 1no, 20mm GI Union 1no,CI pushcock/Bibcock1no,PVCSaddleincludingtransportation, |
| 73 | Supplyingallmaterials,labourT&Pforconstructionof Cement Concrete drain for stand post including earth work in all kinds of soil with initial lead and lift CC(1:3:6) with 40 mmsizeofHGmetal,BrickworkinCM(1:4)CC(1:2:4) with12mmsizeHGchipsand12mmthickcement plaster (1:4) including cement punning over plastering etc. all complete as per direction of EIC. For stand post |
| 74 | SupplyingallmaterialslabourT&Pandprovidingand layingintrenchesgalvanizingmildsteeltubes(Medium grade)conformingtoB.I.S.1239Part-Iofthefollowing nominalboreandtubefittingsincludingtestingasper specification all complete including earth work excavation inallkindsofsoilandrefillingwithcostofallGIfittingsrequired all complete as per the direction of EIC. |
| 75 | Supplying of alllabour, T&P, material including taxes for laying galvanizedmildsteeltubes(mediumgrade)with fittings&specialsconformingtoIS:1239,part-1ofthe followingnominalboreincludingweldingatsiteasper requirementtositecodition&testing etc. completeas perspecificationanddirectionofEngineer-in-Charge (All materials are to be supplied by the contractor).(including 20% fitting of cost of GI Pipe) 100 mm dia GI Pipe |
| 76 | 80 mm dia GI Pipe |
| 77 | Providing water supply to Hospital, GP office, Schools and AWCbuildingincludinginstallationofstoragetankof 1000ltrwithwaterconnection,platform,drainageand recharge pit etc. all complete.( Estimate Attached ) |
| 78 | Painting LOGO, Name, laying foundation stone, Documentation, etc, complete |
| 79 | Documentation charges |
| 80 | Display board |
| 81 | O&M- ThecontractorshallOperate&Maintainthe PWS project for Five (5) calendar years from the completiondateofdefectliabilityperiodofoneyearin suchamannerthatallthehouse holdof thePWS Scheme covered area will get (adequate) required quantity ofsupply watertakingsupply houras 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complainteitherfrompublicorfromDepartment.The contractorshalloperate&maintainallstructureofthe PWSschemesaspertermsandconditionsofDTCN& technical specificationmentioned in Section-5. |
| 82 | (2). PWS TO SANDHARASASAN UNDER SATYABADI BLOCK A.) CONSTRUCTION OF COMPOUND WALL1.) Earth work in excavation in foundation in hard soil with in the initial lead lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 83 | A-2). Supplying all labour T&P materials for filling foundation with sand, well watered and rammed with cost ,conveyance & royalty of the materials etcall complete as directed by the Engineer-in-charge |
| 84 | A-3).Supplying all materials, labour, T&P and providing C.C.(1:4:8) with 4cm size HG crusher broken metal including all cost,carrige royalty,taxes,and all labour involved for completion of item of workas directed by the Engineer-in-charge |
| 85 | A-4).Supplying, all labour T&P materials providing cement concrete(1:1.5:3) for RCC work using 20mm size HG crusher broken chips including all cost of materials.labour,& conveyance charges with watering,curing for the required period etc complete and providing required quantity of centering and shutterings including false works and dismentaling them after casting as perdirection of Engineer-in- charge of the departmet.a) Foundation for Column & Plinth Beam |
| 86 | A-4b) Column & Beam |
| 87 | A-5). Labour for MS reinforcement for RCC work including cutting,bending,binding,binding and tying the grills and placing in osition including cost of binding wire 18 to 20 gauge andconveyance of MS rod etc. all complete. |
| 88 | A-6). Supplying all materials, labour, T&P and providing Brick work with Fly ash Bricks in cement mortar (1:6) insuper structure using fly ash bricks of size 23cnx 11cmx 8cm including cost, conveyance,royalty of all materials as per specifications anddirection of Engineer-in-charge |
| 89 | A-7). Supplying all labour, T&P, materials for refilling the sides of the foundation with excavated materials including watering and ramming/compacting etc. complete as directed by the Engineer-in-charge |
| 90 | A-8). Providing 12mm thick cement plaster (1:6) over brick masonry walls including all cost of the materials,carrige,royalty,all taxes and all labour involvede for completionnof item of work as per thedirection of Engineer-in-cgarge. |
| 91 | A-10). Supplying,transporting,fitting and fixing of MS Grill, as per the approved design, in the hinges already provided in the gate pillers,etc,all complete, as per the direction of the Engineer-in- charge.(to be paid as per actual weight) |
| 92 | B.)DEVELOPMENT OF SITE1). Supplying all materials, labour, T&P for Filling earth inside Head works site including watering, ramming with cost, carriage & royality of materials etc. all complete as per direction of Engineer-in-charge. |
| 93 | C.)CONSTRUCTION OF CC APPROACH ROAD (15.0M)1). Supplying all materials,labour,T&P for providing earth work in excavation in foundation for road work in all kinds of soil with in the initial lead lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 94 | C-2). Filling foundation and plinth with sand well watered and rammed including all cost,conveyance,taxes,royalty etc,complete. |
| 95 | C-3).Supplying all materials, labour, T&P and providing C.C.(1:4:8) with 4cm size HG crusher broken metal including all cost,carrige royalty,taxes,and all labour involved for completion of item of workas directed by the Engineer-in-charge |
| 96 | C-4).Supplying all materials, labour, T&P and providing Brick work with Fly ash Bricks in cement mortar (1:6) to side of CC road work using fly ash bricks of size 25cnx 12cmx 8cm having crushing strength 75kg/cm2 for foundation and plinth including cost, conveyance,royalty of all materials as per specifications anddirection of Engineer-in-charge |
| 97 | C-5).Supplying, all labour T&P materials providing cement concrete (1:1.5:3) for with 12mm size HG crusher broken chips including all cost of materials.labour,& conveyance charges with watering,curing etc all complete as perdirection of Engineer-in-charge of thedepartmet. |
| 98 | C-6).12mm thick cement plaster (1:6) over brick masonry workincluding cost carriage and royality of all materials |
| 99 | D.) SUPPLY AND INSTALLATION OF PUMP & MOTOR1). Supplying, of 5 HP Three Phase Vertical Submersible Pump set including 100% standby.Head - 51 mtr, Discharge -198 LPM |
| 100 | Control Pannel suitable for 3 HP Submersible Pumpset consisting of main fuse contactor ( Cosmic star- delux Automatic Star Delta/ BCH ) Volt meter, Amp meter, Selector Switch, On/Off switch, Single Phase preventor, Overload relay, Phase Indicator etc.enclosed in a metal box. |
| 101 | Supplying, of3 HP Three Phase Horizontal Submersible Pump set including 100% standby.Head - 20 mtr, Discharge -7 LPS |
| 102 | Control Pannel suitable for 3 HP Submersible Pumpset consisting of main fuse contactor ( Cosmic star- delux Automatic Star Delta/ BCH ) Volt meter, Amp meter, Selector Switch, On/Off switch, Single Phase preventor, Overload relay, Phase Indicator etc.enclosed in a metal box. |
| 103 | Supply of 4.0mm2 x 3 core Submersible Flat cableEPM (2318(200)/DT-19.03.2020 (M/S Jharana industries pvt. Ltd.) |
| 104 | Supply of 25Sqmm 31/2 core Aluminium Armoured cable (Nicco make ) |
| 105 | Supply of 1000 x2000mm Shock Proof Rubber mat having thickness 13mm capable of withstanding 5W.V. confirming to itsspecification ( 10kg ) |
| 106 | Supplying of all labour, T&P and installation of3 HP submersible pump set including lowering of column pipe with supply of Nut Bolt, rubber insertion sheet, installation of control pannel board, laying of flat cable & armed cable through suitable casing pipe includingearth work and cost of all materials etc. all complete. |
| 107 | E.) FABRICATION WORK & LAYING OF DI AND GI COLUMN PIPES PIPES(Zone-I) (2 nos)1). Supplying all materials,labour, T & P including conveying, laying of DI pipes with SS flange for class LA confirming to IS 1538-20 duties all complete as per direction of E.I.C.I) 100mmdia DF DI (K-9) pipe of 2.75 mtr each |
| 108 | E-1- II) 100X 100mm DI Tee |
| 109 | E-1-III) 100mmdia DF DI (K-9) pipe of 1.00 mtr long |
| 110 | E-1-IV) 100mmdia DF DI (K-9) pipe of 0.50 mtr long |
| 111 | E-1-V) 100mmdia DI D/F duck foot bend (IS 1538-1993) |
| 112 | E-1-VI) 100mm DI NR Valve (P.N.-1.6) |
| 113 | E-1-VII) 100mm DI D/F Butter Fly valve (P.N.-1.0) |
| 114 | E-1-VIII) 100mm DI 90 D/F bend |
| 115 | E-1-IX) Supply fitting & fixing of M.S. nut and bolt of different size |
| 116 | E-1-X) Supply fitting & fixing of rubber insertion |
| 117 | E-1-XI) 65mm MS long clamp (heavy duty) for holding column pipe |
| 118 | E-1-XII) 65mm GI Column Pipe |
| 119 | E-1-XIII) 200mm dia Bore Cover |
| 120 | E-1-XIV) Supply fitting and fixing of flexible PVC insulated GI wire |
| 121 | E-1-XV) 15mm Pressure Gauge |
| 122 | E-2). Supplying all labour T&P materials for earth work inexcavation of foundation in all kinds of soil (ordinary, Hard and slushy soil) including fine dressing and leveling the bed with in initial lead of 50 mtr and initial lift of 1.50 mtr etc all complete as per the direction of EIC. ( excavation of earth to be done 0.90 mtr above the dia of pipe and 0.30mtr wider than the dia of pipe)150mm DI (K-9) pipe |
| 123 | E-3).Laying in trenches centrifugally cast (spun) Ductile Iron pressure socket and spigot pipes, class - K9 without cement mortar lining , conforming to IS:8329-2000 of the following nominal diameter as per specification, complete.150mm DI (K-9) pipe |
| 124 | E-4). Suppluing fittinf,fixing& laying in trenches double socket ductile iron bends confirming to IS:1538(Part-X) as per specification all complete including cost of bend150mm DI (K-9) pipe |
| 125 | E-5).Providing push-on-joints conforming to IS:3114-1994 to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes using Rubber Gaskets Conforming to I.S 5382 of S.B.R quality including cost of rubber gasket,testing of joints as per specification complete .150mm DI (K-9) pipe |
| 126 | E-6).Supplying all labour T&P materilas and refilling the pipe line with excavated material including watering and ramming all complete as per EIC150mm DI (K-9) pipe |
| 127 | E-7). Laying in trenches Ductile Iron double flangedTapers confirming to IS:1538 - 1993 (Part-XXI) of the following nominal diameter as per specification complete150mm X 100mm DITapper |
| 128 | F.) TREATMENT UNIT1.) Providing chlorination arrangement with chlorinator of required capacity including cost of all materials, pipes, fittings, valves etc. including cost of installation etc. all complete. |
| 129 | G.) CONSTRUCTION OF RCC ESRDesign, Drawing, Construction, Errection, Testing & Commissioning of 50,000 ltr. capacity capacity with 15 mtr. staging RCC Elevated Storage Reservoir including fitting fixing of MS ladder from bottom to top, M.S. pipes inlet, Outlet & valves arrangement etc.all complete as per direction of E.I.C. |
| 130 | H). CONSTRUCTION OF RCC UGR 1,00,000 Ltr. |
| 131 | I.) DISTRIBUTION SYSTEM1.) Supplying all labour T&P materials for earth work in excavation of foundation in all kinds of soil (ordinary, Hard and slushy soil) including fine dressing and leveling the bed with in initial lead of 50 mtr and initial lift of 1.50 mtr etc all complete as per the direction of EIC. ( excavation of earth to be done 0.90 mtr above the dia of pipe and 0.30mtr wider than the dia of pipe) |
| 132 | I-2). Supplying all labor, T & P for laying of HDPE Pipe including supply of jointing materials etc all complete including cost of HDPE Pipe.a) 90mm HDPE Pipes |
| 133 | I-2b) 110mm HDPE Pipes |
| 134 | I-2c) 160mm HDPE Pipes |
| 135 | I-3). Supplying all labour T&P materials and refilling the pipe line trench with excavated materials including watering and rammingallcomplete as per the direction of EIC. |
| 136 | I-4). Supplying all labour T&P materials, fitting and fixing of DIsluice valves/ NR valve with double flanged ends for water works purposes for the following rating and nominal diameter` including cost of nut bolt and rubber insertion transportation charges all complete as per specification and direction of EIC, including the cost of DI sluice valves / N.R. valves.a). 80mm CI (D/F) Butter Fly valve (standard) PN-1.0 |
| 137 | I-4c). 100mm CI (D/F) Butter Fly valve (standard) PN-1.0 |
| 138 | I-4c). 125mm CI (D/F) Butter Fly valve (standard) PN-1.1 |
| 139 | I-5). Supplying all labour T&P materials, and fixing of single Air valve for water works purposes for the following diameter, including drilling the water main including cost of Air valve and saddle complete as per specification and direction of EICa) 25mm DI Tamper proof Kinetic Air Valve |
| 140 | I-6). Supplying of all labour,T&P,material including taxes for construction of RCC (1:1.5:3) valve chamber for SV/NRV of inside size 0.90mx0.90mx1.10m & wall thickness 0.15m confirming to approved drawing,design & specification etc. complete as per direction of the Engineer-in-charge.a). 80mm to 200 mm SV/NRV |
| 141 | I-7). Supplying all materials, labour T&P and cutting metalled road for taking pipe line through and making good the damaged as per direction of EIC.a). Metaled Road |
| 142 | I-7b). Ashalphat or Bituminous road |
| 143 | I-8). Supplying all labour, T&P for cutting C.C. Road for laying ofPVC / HDPE / DI Pipes. |
| 144 | I-9). Supplying all labour, T&P for C.C.(1:2:4) with 12mm size hard granite chips and mending good the damages of C.C. Road forlaying of PVC Pipe line withall complete |
| 145 | per letter no-2270/dated 03.02.2020 of PR and DW Govt. of Odisha a). For new supplys in New Schemes/Aug from new Distribution linesProviding House hold connection with supply & fitting fixing of all necessary pipes and fittings from supply main pipe line to water point post such as PVC fabricated Saddle confirming to IS:10299- 1982, G.M. ferrule Cock (IS:2692-1978) , GI fittings (15mm dia GI Socket-2, 15mm diaX100mm long GI nipple-2, 20mmx15mm GI R Elbow-1, 20mm dia G.I elbow, Nipple-1, 15 mm dia PVC bibcock(Best Quality), Making of Concrete Block of Size (0.785x0.11x0.11x0.6m3 around 20mm dia GI stand pipe, 110mm dia PVC (Non-Presuure Pipe around Stand point to contain concrete, Cutting holes through existing brick work including making good to same in CM (1:4) for taking GI/PVC pipes & fittingsincluding 20mm HDPE of 0.9 mtr & its laying but excluding Earthwork excavation and refilling of excavated material and as per site requirement all complete and as per the direction of Engineer-in-charge. (As per letter No.2770 dated.03.02.2020 of PR. & DW, GoO) |
| 146 | I-10b). Supplying all Material and labour T&P for laying and fixing 20mm Dia HDPE Pipe of PE-80 grade and pressure rating PN10.0 for connection for Individual house connection confirming to IS 4984 & 4985/2016 (10kgf/cm2) including earth work excavation (1mx0.3mx0.45m).refilling the trenches ,laying pipe line cost of all material such as pipes and fitting etc, all complete and as per requirment and as per the site requirment and as per the direction of Engineer charge (@6 mtr for each house) (As per letter no 2770dated 03.02.2020 of PR & DW Goo) |
| 147 | I-10c). CC Road Crossing (For the required houses opposite to themain pipe line)Supplying all labour and T&P for cutting cement concrete road for taking pipe line and making good to the damages with12 mm size crusher broken chips concrete CC(1:2:4)including all cost, conveyance, royality of materials including watering, curing and ramming etc. including cost of 20mm HDPE pipe(PE-80, PN-10) & laying of pipe (3.75mtr) confirming to IS 4984& 4985/2016(10kgf/cm2), all complete and as per specification and direction of Engineer-in-charge. (using Cutter) (As per letter No.2770 dated.03.02.2020 of PR. & DW, GoO) |
| 148 | I-11). Supplying all materials, labour& T&P for construction of RCCsingle mouth stand post including earth work in all kinds of soil with initial lead and lift with cement concrete (1:2:4) with 12 mm size crusher broken Hard granite chips, reinforcement , plastering with CM(1:4) with punning including centering and shuttering etc all complete fitting and fixing of , GI fittings 20mm elbow 1no, 20x15mm dia GI R/S 1no, 20mm GI Union 1no,CI push cock/Bib cock 1no, PVC Saddle including transportation, taxes and royalties etc. all complete as per the direction of E.I.C. (As per drawing attached here with) |
| 149 | I-12). Supplying all materials, labour T&P for construction ofCement Concrete drain for stand post including earth work in all kinds of soil with initial lead and lift CC(1:3:6) with 40 mm size of HG metal, Brick work in CM(1:4) CC(1:2:4) with 12 mm size HG chips and 12 mm thick cement plaster (1:4) including cement punning over plastering etc. all complete as per direction of EIC. For stand post |
| 150 | I-13). Supplying all materials labour T&P and providing and laying in trenches galvanizing mild steel tubes (Medium grade) conforming to B.I.S. 1239 Part -I of the following nominal bore and tube fittings including testing as per specification all complete including earth work excavation in all kinds of soil and refilling with cost of all GI fittings required all complete as per the direction of EIC.a) 20mm dia GI Pipe (For Stand post) |
| 151 | I-13b) 80mm dia GI Pipe (For Culvert crossing) |
| 152 | I-13c) 100mm dia GI Pipe (For Culvert crossing) |
| 153 | I-14). Providing water supply to hospital, schools and AWC building including installation of storage tank of 1000 ltr with water connection, platform ,drainage and recharge pit etc. all complete asper the direction of E.I.C. (As per drawing attached here with) |
| 154 | O & M -The contractor shall Operate & Maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall operate & maintain all structure of the PWS schemes as per terms and conditions ofDTCN &technical specificationmentioned in Section-5. |
AI Tender Summary
Tender Timeline
Apr 14, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedApr 20, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 21, 2022
Bid Opening Date