South Eastern Coalfields Limited-SECL has published Dismantling, Shifting And Extension Of Lt Overhead Line In The Eastern Part Of Brahmpurta, 223, Bahanpat And Bhathora Patch Of The Mine, Gevra Project On As And When Required Basis Of Quarry At Gevra Project For 365 Days . Submission Date for this Tender is 16-05-2022. Overhead Line Tenders in Korba Chhattisgarh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-May-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 16-05-2022 |
Sl. No. | Item Description |
1 | Erection of metallic pole 10 m and upto 13 m without cement concrete foundation including excavation and refilling etc with bolder/stone available at site as required as per instruction of Engr incharge. |
2 | Erection of stay set complete (galvanised) in cement concrete 0.2 Cu. m per stay 1:3:6 (1cement : 3 coarse sand : 6 graded stone) foundation including excavation and refilling etc as required on the instruction of Engr incharge. |
3 | Erection of angle/channel, iron cross arm on wood/RCC/PCC/steel tubular/rail pole etc as required (including providing of MS nuts & bolts) |
4 | Erection of disc/pin/shackle insulators including binding etc as required |
5 | Erection of ACSR Rabbit conductor including binding etc as required (single wire per km) |
6 | Erection of GI wire no. 8 SWG including binding etc as required |
7 | Dismantling of overhead line, including dismantling and lowering of conductor, insulator, brackets, etc. Uprooting of poles and transporting it to the road side. Transportation of materials other than pole to road side (brackets, insulators, clamps and conductors). Loading of materials at the roadside and unloading the same as per the instruction of incharge. NOTE-Since, the works are directly related with production and safety in the mine and that too on day to day basis it is observed as per practical experiences, minimum a gang of 12 persons (04 skilled + 8 semiskilled) will be required on daily basis. The agency must have to maintain the deployment of manpower of 12 persons (04 skilled + 8 semiskilled) daily on monthly average basis and in case of any shortage of manpower(on monthly average of 12 persons/day) will have a proportionate deduction as per prevailing HPC from the payment/billing amount of agency. |
8 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail