Supply Of On Off Ball Valves For Msb Unit As Per Technical Specifications For Numaligarh Refinery Limited , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-1 Bidder To Provide Tag Wise Price Break Up Of Group-1In Boq-2 From Boq2 Sr.No. 1.01-1.82. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-2.1 Bidder To Provide Tag Wise Price Break Up Of Group-2.1 In Boq-2 From Boq2 Sr.No. 2.01-2.10 , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-2.2 Bidder To Provide Tag Wise Price Break Up Of Group-2.2 In Boq-2 From Boq2 Sr.No. 3.01-3.06. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-3.1 Bidder To Provide Tag Wise Price Break Up Of Group-3.1 In Boq-2 From Boq2 Sr.No. 4.01-4.65. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-3.2 Bidder To Provide Tag Wise Price Break Up Of Group-3.2 In Boq-2 From Boq2 Sr.No. 5.01-5.37 , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.1 Bidder To Provide Tag Wise Price Break Up Of Group-4.1 In Boq-2 From Boq2 Sr.No. 6.01. ( 1P22-Uv-122602 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.2 Bidder To Provide Tag Wise Price Break Up Of Group-4.2 In Boq-2 From Boq2 Sr.No. 7.01. ( 1P23-Uv-138102 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.3 Bidder To Provide Tag Wise Price Break Up Of Group-4.3 In Boq-2 From Boq2 Sr.No. 8.01. ( 1P23-Uv-278201 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.4 Bidder To Provide Tag Wise Price Break Up Of Group-4.4 In Boq-2 From Boq2 Sr.No. 9.01. ( 1P23-Uv-770002 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.5 Bidder To Provide Tag Wise Price Break Up Of Group-4.5 In Boq-2 From Boq2 Sr.No. 10.01. ( 1P24-Uv-093301 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.6 Bidder To Provide Tag Wise Price Break Up Of Group-4.6 In Boq-2 From Boq2 Sr.No.11.01. ( 1P24-Uv-262602 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.7 Bidder To Provide Tag Wise Price Break Up Of Group-4.7 In Boq-2 From Boq2 Sr.No.12.01. ( 1P22-Uv-613101 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.8 Bidder To Provide Tag Wise Price Break Up Of Group-4.8 In Boq-2 From Boq2 Sr.No. 13.01. ( 1P24-Uv-093201 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.9 Bidder To Provide Tag Wise Price Break Up Of Group-4.9 In Boq-2 From Boq2 Sr.No. 14.01. ( 1P22-Uv-123101 ) , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following On-Off Ball Valves For Msb Unit As Specified In Material Requisition. , Group-4.10 Bidder To Provide Tag Wise Price Break Up Of Group-4.10 In Boq-2 From Boq2 Sr.No.15.01. ( 1P24-Uv-123202 ) , Charges For Site Supervision Of Erection / Installation Andtesting For Scope As Defined In Mr For On-Off Ball Valves For Msb Unit , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .