Supply Of Globe Control Valves Lot-1 For Msb Unit As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Globe Control Valves Lot-1 For Msb Unit As Per Technical Specifications For Numaligarh Refinery Limited , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-1 Bidder To Provide Tag Wise Price Break Up Of Group-1In Boq-2 From Boq2 Sr.No. 1.001-1.100. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-2 Bidder To Provide Tag Wise Price Break Up Of Group-2 In Boq-2 From Boq2 Sr.No. 2.001-2.018. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-3 Bidder To Provide Tag Wise Price Break Up Of Group-3 In Boq-2 From Boq2 Sr.No. 3.001-3.004. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-4 Bidder To Provide Tag Wise Price Break Up Of Group-4 In Boq-2 From Boq2 Sr.No. 4.001-4.009. , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-5 Bidder To Provide Tag Wise Price Break Up Of Group-5 In Boq-2 From Boq2 Sr.No. 5.001 , Design, Detail Engineering, Procurement, Manufacturing, Assembly, Testing & Inspection, Packing, Forwarding, Transportation, Route Survey ( If Required ) , And Supply Till Site Including Commissioning Spares, Mandatory Spares , Special Tools & Tackles , Consumables, 2 Year Operational Spares & Third Part Inspection Charges For Following Globe Control Valves Lot-1 For Msb Unitas Specified In Material Requisition. , Group-6 Bidder To Provide Tag Wise Price Break Up Of Group-6 In Boq-2 From Boq2 Sr.No. 6.001-6.002. , Charges For Site Supervision Of Erection / Installation Andtesting For Scope As Defined In Mr For Globe Control Valves Lot-1 For Msb Unit , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) . => Limited