Auction Sale Of Released Condemned And U / S Scrap, Abandoned Steel Structure Andsteel Gaintary Under Sse-W-E-Rtm, [ 1 ] Shed 1 Steel Structure Of Fuel Point Atrcd Side Diesel Shed Consisting, Truss Incline Member ( 41.25R ) , Trussvertical Member ( 41.25R ) , Horizontal Member ( 41.25R ) , Vertical Post ( Double Headed ) , Vertical Post ( 30Lbs ) , Purlin, Wind Tie, Incline Angle, Ismc 75 ( Fram ) , Vertical Member Ismc75, Iron Plate, Gi Pipe ( 2Inch1.5Inch ) , Ac Sheet, Qty-4833.73Kg ( Approx. ) , Note- ( I ) R.C.D And Lube Oil Fitting Is Not Included, ( Ii ) Two Platform In This Shade Are Not Included. ( Iii ) Rail Cutting Below Ground Level Is Not Allowed. [ 2 ] Shed 2 Side Structure, Of Fulling Point Diesel Shed Consisting, Vertical Post 90R, Inclinedtruss, Plate, Flate, Horizontal Member, Purlin, Between Column Andtrust, Side Purlin, Structure Below Plate Form ( Horizontal ) , Vertical Post ( 90R ) , Incline Member, Rail Below Stair ( 30R ) , Rail Below Landing Double, Wind Tie, Rail Below Landing 50R, Fligtconcreatdebries, Concreat Debries Plateform, Tmt Bar, Side Wall, Ac Sheet, Qty-18366.57Kg ( Approx. ) , Note- ( I ) Water Pipe Line Is Not Included, ( Ii ) Carbody Cleaning Shed And Its Related Assets Are No Included, ( Iii ) Drain Oil Collection Tank Located In The Pit Is No Included, ( Iv ) Nontraction Tank And Foundation Is Not Included And Power Item Is Also Not Included, ( V ) Rail Cutting Below Ground Level Is Not Allowed. [ 3 ] Gaintry At Diesel Shed Consisting, Vertical Member ( 41.25R ) , Ismb 450, Plate In Vertical Column, Iron Plate, Gusset Plate, Tripozedal Plateat Bottom Of Column, Rail At Top Of 50R , Gaintry Paraller To Track 50R, Plate In Gaintryparallerto Track, Qty-3358.60Kg, Note-Small Deep Tank Locomotive Item Main Reserve Tank, Radiator Cleaning Tank, Plateform Compressor Is Not Included. Total Qty-26558.90Kg ( 26.559Mt Approx ) .Mode Of Delivery By Lot Basis And On As Is Where Is Basis, Custodian-Sse-W-E-Rtm , Fdp- 50 Days. Note- ( 1 ) Dismentling Up To Ground Level Only Below Ground Level Is Not Allowed. ( 2 ) Duringdismentling Purchaser Should Take Necessary Measures To Avoid Any Mishaps. ( 3 ) Purchaser Should Insure To Keep A Safety Banner Around The Work Spot. ( 4 ) After Removing / Clearing The Rcc / Bricks Masonary Rubbish From Spots Thedelivery Of Wood / Iron Material Will Be Affected. ( 5 ) Before Delivery Theland Should Be Clear Of All Debris, ( 6 ) Part Delivery Is Not Allowed.