Municipal Corporation-MC has published Providing Supplying Spares And Rectification Of Electrical And Mechanical Equipment In Pump House And Near Waghur Dam Annual Maintenance For Year 2022-23 - Supply And Installation Of 33Kv, 3 Core, Aluminum Armored Cable Outdoor Cable End Termination Jo. Submission Date for this Tender is 18-04-2022. Forming Tools Tenders in jalgaon Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply and Installation of 33KV, 3 core, Aluminum armored cable outdoor cable end termination joint kit (ISI make). Work involve cutting of existing joint, measure insulation value and making joint, refixing to system. |
2 | Supply & erecting 3.3 KV 3 core 300 sq.mm alum. Armoured cable. |
3 | Supply & erecting 3.3 KV 3 core 70/95sq.mm alum. Armoured cable. |
4 | Excavation and backfilling of trench for adjustment of33 KV cable for joint. |
5 | Supply and installation of LT out door cable joint for auxiliary transformer |
6 | Supply and installation of 33 KV Isolator set of 3 with alignment |
7 | Dismantailing of existing 33 KV Isolator complete set |
8 | Repairing of 33 KV existingisolator along with required spares & hardware’s with alignment for smooth operations |
9 | supply and installation of 33 KVA B Switchfor auxiliary Transformer |
10 | Dismantailing of existing 33 KVA B Switchcomplete set |
11 | Repairing of 33 KV existing A B Switchincluding required spares & hardwares with alignment for smooth operations |
12 | Supply and installation of 33 KV Horn Gap unit of 3 with fuses |
13 | Repairing of 33 KV Horn gap post for proper fixing |
14 | supply and installation of Horn gap fuses |
15 | Supply and installation of33 KV ,D O unit of 3 with fuses |
16 | Supply and installation of D O fuse 50 amps |
17 | Supply and installation of 33 KV, LAsingle post |
18 | Supply and installation ofPost Insulator with Pin |
19 | Supply & Installation of 33 KV outdoor PT |
20 | Supply & Installation of 33 KV outdoor CT |
21 | Repairing of existing 33 KV outdoor PT |
22 | Repairing of existing 33 KV outdoor CT |
23 | Repairing of post insulator and cleaning by CTC |
24 | Tightening of all conductors in sub station as preventiv maintenance |
25 | Transformer, 33 KV/3.3 KV, 3000 KVA complete overhauling, Bucolz relay, BDV test, PPM test, tightening of all 33 KV Bushing and conductors removing air from Bucolz relay, cleaning of all bushing with CTC. Attending leakages if any. |
26 | Transformer, 33 KV/3.3 KV, 3000 KVA. Oil filtration with test report. |
27 | Supply & Installation of Buchloz relay for 33 KV out door transformer. |
28 | Supply & Installation of Breather with silica jel for 33 KV outdoor Transformer. |
29 | Auxiliary Transformer 33 KV /440 Volts complete preventive maintenance. Tightening of all bushing, gaskets, conductors and cable terminations, earthing etc |
30 | Oil filtration of Auxiliary Transformer 33 KV/440 Volts |
31 | Complete overhauling of 33 KV out door VCB.All control wiring tightening, spring changing motor testing, earthing tightening etc |
32 | Earthing of sub station - Replace existing material by new material to improve value |
33 | Spreading clear metal in yard |
34 | Painting of complete structure of sub stations by Red oxide as primer andAluminum paint |
35 | illumination in yard.Supply and installation of fused tubes, bulbs wiring testing etc |
36 | Supply and installationof Indoor cable joint for 3.3 KV, 500 HP motor, coppermulti strandfor H T motor Dismantailing of exi etcsting burnt out / heated cable joint, cleaning cable by CTCpreparing new joint and HT taping. |
37 | Repairing of existing joint of 3.3 KV H T motor.Cleaning by CTC to clean cable and Lugs for carbon free particle’s, re-taping by H T tape |
38 | Supply and installationofH T capacitor (120KVAR unit) |
39 | Supply ofL T capacitor |
40 | Installation of L T capacitor |
41 | Supply of H THRC Fuse 3.3 KV/50 Amps capacity with barrel for capacitor |
42 | 500 HP, 3.3 KV, H T motor complete overhauling with alignment. Shifting motor from foundation by disconnecting cable, pulley etc. Dismantailing/ taking out rotor from stator. H T warnishing to rotor and stator by heating process Inspection of bearings, end cover bearing housing etc |
43 | Providing & Fitting Bearing to the motor DE side including necessary fixtures etc. complete. |
44 | Providing & Fitting Bearing to the motor NDE side including necessary fixtures etc. complete. |
45 | Workshop work for filling weared out bearing housing |
46 | Rotor balancing for proper alignment to improve life of motor |
47 | Painting to motor by Red oxide as primer and two coats by Smoke Gray paint |
48 | Preventive maintenance of motor. Inspection of bearings, cable joints, foundation bolts tightness, cleaning of cooling system greasing to DE NDE bearings |
49 | Replace of Motor from foundation to other foundation |
50 | Alignment of Motor to pump |
51 | 500 H.P. 375 Kw. Pump set(Kirloskar make)Remove of existing old splitcasing pump from row water pumping station for Repairing purpose. |
52 | Providing & Fitting Impeller to the pump including necessary Fixtures etc. complete |
53 | Providing & fitting Pump shaft to the Pump including necessary fixtures etc complete. |
54 | Providing & fitting Casing wear Ring &suction side) to the Pump including necessary fixtures etc. complete. |
55 | Providing & Fitting Casing Wear Ring (Delivery side) to the pump including necessary fixtures etc. complete. |
56 | Providing & Fitting Split Gland to the pump including necessary fixtures etc. complete. |
57 | Providing & Fitting Bearing Holder DE to the pump including necessary fixtures etc. complete. |
58 | Rewinding Motor of EOT crane. |
59 | Repairing Panel board of EOT crane with required accessories. |
60 | Providing & Fitting Bearing Cover DE to the pump including necessary fixtures etc. complete. |
61 | Providing & Fitting Bearing Cap to the pump including necessary fixtures etc. complete. |
62 | Providing & Fitting Split Lantern Ring to the pump including necessary fixtures etc. complete. |
63 | Providing & Fitting Liquid Deflector Rubber to the pump including necessary fixtures etc. complete. |
64 | Providing & Fitting Shaft Sleeve to the pump including necessary fixtures etc. complete. |
65 | Providing & Fitting shaft Sleeve Nutto the pump including necessary fixtures etc. complete. |
66 | Providing & Fitting Bearing Nut to the pump including necessary fixtures etc. complete. |
67 | Providing & Fitting Bearing Lock Nut to the pump including necessary fixtures etc. complete. |
68 | Providing & Fitting Sealing Tube to the pump including necessary fixtures etc. complete. |
69 | Providing & Fitting Set of Gaskets to the pump including necessary fixtures etc. complete. |
70 | Providing & Fitting Set of Ring to the pump including necessary fixtures etc. complete. |
71 | Providing & Fitting Set of Fasteners to the pump including necessary fixtures etc. complete. |
72 | Providing & Fitting Gland Packing to the pump including necessary fixtures etc. complete. |
73 | Providing & Fitting Bearings to the pump including necessary fixtures etc. complete. |
74 | Providing & Fitting Love joy Coupling with rubber & studs complete with suitable bore size |
75 | Providing nylon slings belts of 5 to 10 tan capacity (for lifting purpose) |
76 | Pump Coloring Charges |
77 | EOT crane maintenance work. Inspection of main drum, motors, panel relays etc |
78 | Replace faulty or burnt MCB in EOT crane panel |
79 | Overhauling ofmotors with replacement of bearings for EOT crane |
80 | Cleaning complete both rail of EOT crane |
81 | H T Panel - inspection of all parts in one VCB panel for smooth operations |
82 | supply and installation of closing and tripping coil |
83 | supply and installation of spring charging motor |
84 | Repairing of spring charging motor |
85 | Supply and installation of spring charging drum mechanism |
86 | Repair of VCB, inspection for smooth operations and trolley alignment |
87 | Preventive maintenance of VCB |
88 | Supply & Installation of closing /Tripping coil of VCB Indoor |
89 | Supply & Installation of Earth fault relay |
90 | Supply & Installation of Thermostat |
91 | Supply & Installation of Breaker control switches |
92 | LT panel - Supply and replacement of faulty/ burnt outspaares |
93 | Preventive maintenance of L.T. panel. |
94 | Control and Relay panel wiring replace by new whereever damaged |
95 | Battery charger panel -Supply and installation of burnt out spares |
96 | Preventive maintenance of Battery charger panel |
97 | Supply and installation of 110 volt DC Batteries |
98 | Preventive maintenance of 55 Batteries |
99 | Illumination system - Supply and Installation of burnt tube lights, Exhaust fans MCB, etc. |
100 | Supplying spanner (Ring) |
101 | Supplying Spanner (fix) |
102 | Supplying Multi-meters 1000 Amp. |
103 | Supplying megger 1 KV (1000 Volts) |
104 | Supplying pipe wrentch 18” |
105 | Supplying pipe wrentch 24” |
106 | Supplying pipe wrentch 36” |
107 | Supplying Chain Pulley 2 tone |
108 | Supplying Chain Pulley 3 tone |
109 | Supplying hammer heavy weight up to 10 kg. |
110 | Supplying air blower for panel, VCBcleaning purpose. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy