Cs For Ae For Supervision Of Rehabilitation And Upgradation Of N-R-Kroad Up To Meghalaya-Assam Border In The State Of Meghalaya On Epc Mode ( Package-I )
Tender Overview
Project Description
Cs For Ae For Supervision Of Rehabilitation And Upgradation Of N-R-Kroad Up To Meghalaya-Assam Border In The State Of Meghalaya On Epc Mode ( Package-I )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Apr-2022 | Modified BOQ | Other | 13-May-2022 |
| 2 | 28-Apr-2022 | Corrigendum No. 1 | Other | 13-May-2022 |
| 3 | 28-Apr-2022 | Corrigendum No. 1 | Date | 13-May-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Remuneration for Local Staff (inclusive of per Diem allowance) |
| 2 | Team Leader Cum Senior Highway Engineer (1 No. during Construction Period) (1*24) = 24 |
| 3 | Resident Engineer cum Highway Engineer(1*60) |
| 4 | Bridge/Structural Engineer (1*9) = 9 |
| 5 | Senior Quality cum Material Expert(1*24) = 24 |
| 6 | Sub-Professional Staff |
| 7 | Assistant Quality cum Material Engineer(1*24) |
| 8 | Quantity Surveyor (1*24)+(1*60) = 84 |
| 9 | Survey Engineer (1*24) = 24 |
| 10 | Support Staff (inclusive of per diem allowance) |
| 11 | Office Manager cum Accountant cum Cashier(1*24)+(1*60) =84 |
| 12 | Steno cum Computer Operator (1*24) = 24 |
| 13 | Office Boy (1*24)+(1*60) = 84 |
| 14 | Transportation (Fixed Costs) |
| 15 | 4*4 Vehicle Scorpio or equivalent (not more than 2 years old) (1 nos during Construction Period and 1 no. during Maintenance Period), (1*24)+(1*60) = 84Rate per month |
| 16 | Motorcycle for Main Office during Construction(1*24+1*60) = 84 |
| 17 | Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. |
| 18 | Main office of minimum 200 sqm area for Construction Period (1*24) |
| 19 | Defect Liability Period (min. 100sqm area)(1*60) |
| 20 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 21 | Office Supplies(1*24)+(1*60) = 84 |
| 22 | Drafting Supplies(1*24)+(1*60) = 84 |
| 23 | Computer Running Costs(1*24)+(1*60) = 84 |
| 24 | Domestic and International Communication(1*24)+(1*60) = 84 |
| 25 | Office Furniture and Equipment (Rental) |
| 26 | (Rental)(1*24)+(1*60) = 84 |
| 27 | Reports and Document Printing ( rate as per copy) |
| 28 | Monthly reports(Design and Construction)(84 months * 3 Copies) = 252 Copies |
| 29 | Half yearly Reports (14 months * 3 Copies) = 42 Copies |
| 30 | Various others reports as provided in the Concession Agreement such as Completion Report |
| 31 | Road Survey Equipment, Rate per Km |
| 32 | Surface defects detection and roughness measurement using Network Survey Vehicle |
| 33 | Pavement strength measurement using FWD |
| 34 | Bridge inspection using Mobile Bridge Inspection Unit |
| 35 | Road signs inspection using Retro Reflectometer |
| 36 | ContigenciesA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender