Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunzam At Manali Distt Kullu (Hp) Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunza, manali-Himachal Pradesh

Himachal Pradesh Tourism Development Corporation Limited-HPTDC has published Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunzam At Manali Distt Kullu (Hp) Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunza. Submission Date for this Tender is 19-04-2022. Tanks and Cylinders Tenders in manali Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

31687839
Corrigendum : Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunzam At Manali Distt Kullu (Hp) Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunza
Open Tender
Indian
Himachal Pradesh
manali
19-04-2022

Tender Details

Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunzam At Manali Distt Kullu (Hp) Supplying Installation Testing And Commissioning Of 2 Hecta Liter With 3 Flavors Microbrewery Unit At Hotel Kunzam At Manali Distt Kullu (Hp) , Schedule A (Micro Brewery Brewhouse Items):-Supplying Of 200 Liter Mash Cum Boiling Tank Double Layer Tank Moc Ss 304 Make Jindal/Tata Steel Main Shell Thickness 3 Mm Smooth Grind Finish From Inside Insulation Thickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Mineral Wool Top Should Be Torispherical Dish End With Ss 304 350 Od Manhole All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polished Pipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type Pump Head Should Be Of Ss 304 And Motor For The Same Pump Should Be Of 1.5Hp 20 Meter Head And Make Crompton Or Abb Subjected To Availabilty. Agitation Shaft Size 1 Solid Ss 304 Shaft With Pitch Blade Type Drived By Vfd And Gear Box Ratio Of 1:59 Make Should Be Of Bonfiglioli Or Premium. Motor For Drive System Should Be 1 Hp Make Cg/Abb Tank Should Consist Of 6 Kw Heating Coils Moc Stainless Steel 304 With 1 Threaded Nipple. Quantity 4 Nos. Gross Volume Should Be 25% More From 200 Liter Complete In All Respects. , Lauter Cum Whirlpool Tank:-Supplying Of 200 Liter Luater Cum Whirlpool Tank Double Layer Tank Moc Ss 304 Make Jindal/ Tata Steel Main Shell Thickness 3 Mm Smooth Grind Finish From Inside Insulation Hickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Mineral Wool Top Should Be Torispherical Dish End With Ss 304 350 Od Manhole. Whirlpool Tank Should Be In Bottom With Single Jacket Tank Make Ss 304. Filter Plate Should Be Filtter Upto 0.7Mm Particle Only. All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polished Pipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type Agitation Shaft Size 1 Solid Ss 304 Shaft With Racking Knife Type Drived By Vfd And Gear Box Ratio Of 1:30 Make Should Be Of Bonfiglioli Or Premium. Motor For Drive System Should Be 1 Hp Make Cg/Abb Gross Volume Should Be 25% More From 200 Liter To Complete The Brewhouse Both Mash Cum Boiling Tank And Lauter Cum Whirlpool Tank Should Be Interconneted With Ss Pipline In Such Manner That We Can Transfer Wort From One Tank To Each Other. With A Transfer Pump And Sight Glass Inline Of Brewhousecomplete In All Respects. , Plate Heat Exchanger :- Supplying Of 2 Way Heat Transfer Type Capacity 1500 Lph Temperature Working Range-5 Degree Celsius To + 100 Degree Celcius Temerature Gasket Nbr Type Surface Area 3 Sqm No Of Plate In Phe 41 Plate Moc Ss 316 Pressure Range 4 Kg Section 2 Nos. Structure Ms With Ss Claddingcomplete In All Respects. , Uni Tanks:-Supplying Of 400 Liter Working Volume Pressurized Fermntation Tank Three Moc Ss 304 Make Jindal/Tata Steel. Gross Volume Should Be 25% More First Layer Main Shell Thickness 3 Mm Smooth Grind Finish From Inside. Second Layer Should Be 2Mm Thick Jacket Spiral Or Dimple 7 Mm Gap With Main Shell With 1 Inlet And Outlet Nozzel For Glycol.Third Layer Insulation Thickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Polyurethane Foam Top Should Be Torispherical Dish End With Ss 304 350 Od Manhole With Six Handle And Pressure Holding Capacity Of 3Kg. Bottom Should Be Conical With 60 Degree Cone Angle Elevation. Suported By 80Nb Ss 304 Sch 40 Pipe 3 Nos. All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polished Pipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type. Safety Valve One On Top Prv Capacity 3 Kg. Cip Arm Connected On Top To Body With A Manual Adjusted Pressure Release Valve And Glass Module For Fermentation Inspection.Solonoide Valve 2/2 Way 24V Dc For Temeperature Control Make Aira Or Rotex.Butterfly Valve 1.5 Tc End With Clamp 3 Nos Fitted One On Cip Arm One On Cone And One At Drain.Pressure Gauge Should Be Of 2.5 Dial Size 0-4 Bar Pressure 15 Nb Thread And Glycerin Type Mounted On Cip Arm Make Vision Or Micro.Sample Valve Ss 304 1 Tc End For Sample Collection From The Body Of Main Shell Legs Of Fermentation Tank Should Be Bind With Ss 304 32 Od Mirror Polish Pipe.Glycol Line Connection Should Be Of 38 Od Ppr Pipe With 19 Mm Thick Nitrile Insulation. With A Ball Valve And Solonoide Valve (Specification Earlier Mentioned) Attached At Inlet And Outlet Of Glycol Circulation Line Connection Complete In All Respects. , Bright Beer Cum Storage Tank:- Supplying Of 400 Liter Working Volume Pressurized Fermntation Tank Three Moc Ss 304 Make Jindal/Tata Steel. Gross Volume Should Be 25% More First Layer Main Shell Thickness 3 Mm Smooth Grind Finish From Inside. Second Layer Should Be 2Mm Thick Jacket Spiral Or Dimple 7 Mm Gap With Main Shell With 1 Inlet And Outlet Nozzel For Glycol. Third Layer Insulation Thickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Polyurethane Foam Top Should Be Torispherical Dish End With Ss 304 350 Od Manhole With Six Handle And Pressure Holding Capacity Of 3Kg. Bottom Should Be Onle Zero Hold Conical With 160 Degree Cone Angle Elevation.Suported By 80Nb Ss 304 Sch 40 Pipe 3 Nos. All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polished Pipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type. Safety Valve One On Top Prv Capacity 3 Kg.Cip Arm Connected On Top To Body . Solonoide Valve 2/2 Way 24V Dc For Temeperature Control Make Aira Or Rotex. Butterfly Valve 1.5 Tc End With Clamp 3 Nos Fitted One On Cip Arm One On Cone And One At Drain. Pressure Gauge Should Be Of 2.5 Dial Size 0-4 Bar Pressure 15 Nb Thread And Glycerin Type Mounted On Cip Arm Make Vision Or Micro. Sample Valve Ss 304 1 Tc End For Sample Collection From The Body Of Main Shell Legs Of Fermentation Tank Should Be Bind With Ss 304 32 Od Mirror Polish Pipe. Glycol Line Connection Should Be Of 38 Od Ppr Pipe With 19 Mm Thick Nitrile Insulation. With A Ball Valve And Solonoide Valve (Specification Earlier Mentioned) Attached At Inlet And Outlet Of Glycol Circulation Line Connection Complete In All Respects. , Plc Electrical Panle And Wiring Schedule D (Plc, Programe Logical Control):-Supplying Of Complete Required Wiring Of All Electrical Instrument With Copper Wire Of Make Hanells/Finolix/Polycab Or Dasper With Covered Cable Traypanle Body Should Be Powder Coated Mild Steel. All Electrical Shall Be Of Siemens/Fuji Make And Control Plant In Following Manner. It Should Consist Of 7 Hmi Screen Plc Board Should Be Of Siemens/Fuji On/Off Controlling For The Electric Pump And Motors. Emergency On/Off Selector Switch For Each Automatic Valve Push Button For Each Equipment Manual Controlling. Mcb For 4 Pump. Multi Meter On Board Phase Light Red Green And Blue. 400 Amp Mccb All Required Relay To Operate Plant Smoothly As Per Required Specification Complete In All Respects. , Schedule E (Plc, Chilling System) Chiller:- Sitc Of 3 Tr X 2 Nos Emerson Copland Or Danfoss Compressor Outdoor Unit. Temperature Range -5 Degree Celsius To 12 Degree Celsius Condenser Fin And Tube Type Cooling Type Air Cooled Heat Exchange Tank Copper Sch 10 Pipe Coil Merge Into Tank For Cooling Comppressor Type Scroll Complete In All Respects Including Carriage Of Material In All Leads & Lifts. , Glycol Tank:- Supplying Of 850 Liter Working Volume Pressurized Fermntation Tank Three Moc Ss 304 Make Jindal/Tata Steel. Gross Volume Should Be 25% More First Layer Main Shell Thickness 3 Mm Smooth Grind Finish From Inside. Second Layer Insulation Thickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Polyurethane Foam Top Should Be Flat Half Lid Opening End With Ss 304 Lid Atmospheric Type Bottom Should Be Flat Suported By 80Nb Ss 304 Sch 40 Pipe 3 Nos. All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polishedpipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type. Butterfly Valve 1.5 Tc End With Clamp 3 Nos Fitted For Supply And Circulation Of Glycol. Pump Head Should Be Of Ss 304 And Motor For The Same Pump Should Be Of 1.5Hp 20 Meter Head And Make Crompton Or Abb Subjected To Availabilty. 200 Liter Glycol For To Start Up The Plant Complete In All Respects. , Piping:-Supplying Of Glycol Circulaiton Piping Are Subjected To Site Requirement Which Will Be In Between 350 Sqf. All Glycol Circulation Pipline Should Be Of Ppr Make Aster Or Fusion. Consist Of Union Ball Valve And Complete Glycol Line Circulation Set. With 19 Mm Thick Nitrile Insulation Complete In All Respects. , Schedule F (Utility) Hot Water Tank:-Supplying Of 200 Liter Mash Cum Boiling Tank Double Layer Tank Moc Ss 304 Make Jindal/Tata Steel Main Shell Thickness 3 Mm Smooth Grind Finish From Inside Insulation Thickness 1.5 Mm Outer Finish Of Tank Should Be Mirror Polish Insulation Should Be 60 Mm Thick Insulated With Mineral Wooltop Should Be Torispherical Dish End With Ss 304 350 Od Manhole. All Joint Should Be Tig Welded And Joint Should Be Smoothen And Polished Pipe For Nozzel Should Be Of Ss 304 Make Jindal Nozzel End Should Be Of Ss 304 Tri Clamp Type Pump Head Should Be Of Ss 304 And Motor For The Same Pump Should Be Of 1.5Hp 20 Meter Head And Make Crompton Or Abb Subjected To Availabilty. Tank Should Consist Of 6 Kw Heating Coils Moc Stainless Steel 304 With 1 Threaded Nipple. Quantity 4 Nos. Gross Volume Should Be 25% More From 200 Liter Complete In All Respects. , Cip Tank:- Supplying Of Cleaning Tank Make Ss 304 Capacity 75 Liter Working 100 Liter Gross Volume 3Mm Thick Plate Top Half Lid Opening And Bottom Flat Stand On Three Lag. Tank Should Be Mounted On Movalble Trolley Consist Of Four Wheel With A Hot Water Tank Similar Pump And Pump Connected With 75 Liter Tank With Ss Pipe Sch 80 And Butterfly Valve With Earier Mention Specificationcomplete In All Respects. , Brewing Consultancy Monthly Fees/Charges :- For Head Brewer, Assistant Brewer And Brewing Helper For Beer Making (Every Month) Choices Of Beer Flavour As Per Requirement. , Schedule A (Consumables):- Supplying Of 200 Ltr. Glycol To Start The Plant , Supplying Of Beer Tower With Flash Chiller And Python Pipe With Beer Taps. At Ground Floor Upto 20Mtr. From Brewery. , Supplying Of 150 Lph Plant With 1000Ltr. For Ro Water Storage And 2000Ltr. For Surge Tank With All Pipeline , Schedule F (Delivery Erection Commisioning):-Complete Erection Of All The Equipments Mentioned Above As Per Layout At Site Including Testing And Commisioning Till Despensing System Alongwith Freight Charges Up To Site At Hotel Kunzam Manali Distt. Kullu (H.P.) , The Performance Warranty Period Of The Plant Will Be For 2 Years.The Successful Bidder Shall Maintain The Plant For 2 Years And No Amount Will Be Paid For 2 Years.However, The Bidder Have To Code The Amc Charges For Next 5 Years For Each Year Separately. (After 2 Years Of Warranty Period)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 02-Apr-2022 The format and clause have been withdrawn Other 19-04-2022

Key Value

Document Fees
INR 3000 /-
EMD
INR 80000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Supplying Installation testing and commissioning of 2 Hecta liter with 3 Flavors Microbrewery Unit at Hotel Kunzam at Manali Distt Kullu (HP)
Sl. No. Item Description
1Schedule "A" (Micro Brewery BrewHouse Items):-Supplying of 200 liter Mash Cum boiling tank Double layer tank MOC SS 304 Make Jindal/Tata steel Main shell thickness 3 mm Smooth Grind finish from inside insulation Thickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with mineral wool Top should be Torispherical dish end with SS 304 350 OD manhole all joint should be TIG welded and joint should be smoothen and polished pipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type Pump head should be of SS 304 and Motor for the same pump should be of 1.5HP 20 meter head and make Crompton or ABB subjected to availabilty. agitation shaft size 1" solid SS 304 shaft with Pitch Blade type Drived by VFD and Gear box Ratio of 1:59 make should be of Bonfiglioli or Premium. Motor for drive system should be 1 HP make CG/ABB tank should consist of 6 KW heating coils MOC Stainless steel 304 with 1" threaded nipple. quantity 4 Nos. gross volume should be 25% more from 200 liter complete in all respects.
2Lauter Cum whirlpool tank:-Supplying of 200 Liter Luater cum whirlpool tank Double layer tank MOC SS 304 Make Jindal/ Tata steel Main shell thickness 3 mm Smooth Grind finish from inside insulation hickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with mineral wool Top should be Torispherical dish end with SS 304 350 OD manhole. whirlpool tank should be in bottom with single jacket tank make SS 304. Filter plate should be filtter upto 0.7mm particle only. all joint should be TIG welded and joint should be smoothen and polished pipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type agitation shaft size 1" solid SS 304 shaft with racking knife type Drived by VFD and Gear box Ratio of 1:30 make should be of Bonfiglioli or Premium. Motor for drive system should be 1 HP make CG/ABB gross volume should be 25% more from 200 liter To complete the brewhouse both mash cum boiling tank and lauter cum whirlpool tank should be interconneted with SS Pipline in such manner that we can transfer Wort from one tank to each other. With a transfer pump and sight glass inline of brewhousecomplete in all respects.
3Plate Heat Exchanger :- Supplying of 2 way heat transfer type Capacity 1500 LPH Temperature working range-5 degree celsius to + 100 degree celcius Temerature gasket NBR type surface area 3 Sqm No of plate in PHE 41 Plate MOC SS 316 Pressure range 4 KG section 2 Nos. structure MS with SS claddingcomplete in all respects.
4UNI Tanks:-Supplying of 400 liter working volume Pressurized Fermntation tank Three MOC SS 304 Make Jindal/Tata steel. Gross volume should be 25% more First layer Main shell thickness 3 mm Smooth Grind finish from inside. Second layer should be 2mm thick Jacket Spiral or dimple 7 mm gap with main shell with 1" inlet and outlet nozzel for glycol.Third layer insulation Thickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with Polyurethane Foam Top should be Torispherical dish end with SS 304 350 OD manhole with six handle and pressure holding capacity of 3KG. Bottom Should be conical with 60 degree cone angle elevation. suported by 80NB SS 304 sch 40 pipe 3 Nos. all joint should be TIG welded and joint should be smoothen and polished pipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type. Safety valve one on top PRV capacity 3 KG. CIP arm connected on top to body with a manual adjusted pressure release valve and glass module for fermentation inspection.Solonoide valve 2/2 way 24V DC for temeperature control make aira or rotex.Butterfly valve 1.5" TC end with clamp 3 Nos fitted one on CIP arm one on Cone and one at drain.Pressure gauge should be of 2.5" dial size 0-4 bar pressure 15 NB thread and glycerin type mounted on CIP arm make Vision or Micro.sample valve SS 304 1" TC end for sample collection from the body of main shell legs of fermentation tank should be bind with SS 304 32 OD mirror polish pipe.glycol line connection should be of 38 OD PPR pipe with 19 mm thick nitrile insulation. with a ball valve and solonoide valve (specification earlier mentioned) attached at inlet and outlet of glycol circulation line connection complete in all respects.
5Bright Beer cum storage Tank:- Supplying of 400 liter working volume Pressurized Fermntation tank Three MOC SS 304 Make Jindal/Tata steel. Gross volume should be 25% more First layer Main shell thickness 3 mm Smooth Grind finish from inside. Second layer should be 2mm thick Jacket Spiral or dimple 7 mm gap with main shell with 1" inlet and outlet nozzel for glycol. Third layer insulation Thickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with Polyurethane Foam Top should be Torispherical dish end with SS 304 350 OD manhole with six handle and pressure holding capacity of 3KG. Bottom Should be onle zero hold conical with 160 degree cone angle elevation.suported by 80NB SS 304 sch 40 pipe 3 Nos. all joint should be TIG welded and joint should be smoothen and polished pipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type. Safety valve one on top PRV capacity 3 KG.CIP arm connected on top to body . Solonoide valve 2/2 way 24V DC for temeperature control make aira or rotex. butterfly valve 1.5" TC end with clamp 3 Nos fitted one on CIP arm one on Cone and one at drain. Pressure gauge should be of 2.5" dial size 0-4 bar pressure 15 NB thread and glycerin type mounted on CIP arm make Vision or Micro. sample valve SS 304 1" TC end for sample collection from the body of main shell legs of fermentation tank should be bind with SS 304 32 OD mirror polish pipe. glycol line connection should be of 38 OD PPR pipe with 19 mm thick nitrile insulation. with a ball valve and solonoide valve (specification earlier mentioned) attached at inlet and outlet of glycol circulation line connection complete in all respects.
6PLC electrical panle and wiring Schedule "D" (PLC, Programe logical control):-Supplying of complete required wiring of all electrical instrument with copper wire of make Hanell"s/Finolix/polycab or dasper with covered cable trayPanle body should be powder coated Mild steel. All electrical shall be of Siemens/FUJI make and control plant in following manner. It should consist of 7" HMI screen PLC board should be of siemens/FUJI ON/OFF CONTROLLING FOR THE ELECTRIC PUMP AND MOTORS. EMERGENCY ON/OFF SELECTOR SWITCH FOR EACH AUTOMATIC VALVE PUSH BUTTON FOR EACH EQUIPMENT MANUAL CONTROLLING. MCB for 4 PUMP. Multi Meter on board Phase light red green and blue. 400 amp MCCB all required relay to operate plant smoothly as per required specification complete in all respects.
7Schedule "E" (PLC, Chilling System) Chiller:- SITC of 3 TR x 2 Nos emerson copland or danfoss compressor outdoor unit. Temperature range -5 degree celsius to 12 degree celsius condenser fin and tube type cooling type air cooled Heat exchange tank copper sch 10 pipe coil merge into tank for cooling comppressor type scroll complete in all respects including carriage of material in all leads & lifts.
8Glycol tank:- Supplying of 850 liter working volume Pressurized Fermntation tank Three MOC SS 304 Make Jindal/Tata steel. Gross volume should be 25% more First layer Main shell thickness 3 mm Smooth Grind finish from inside. Second layer insulation Thickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with Polyurethane Foam Top should be flat half lid opening end with SS 304 Lid atmospheric type Bottom Should be flat suported by 80NB SS 304 sch 40 pipe 3 Nos. all joint should be TIG welded and joint should be smoothen and polishedpipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type. Butterfly valve 1.5" TC end with clamp 3 Nos fitted for supply and circulation of glycol. Pump head should be of SS 304 and Motor for the same pump should be of 1.5HP 20 meter head and make Crompton or ABB subjected to availabilty. 200 liter Glycol for to start up the plant complete in all respects.
9Piping:-Supplying of Glycol circulaiton piping are subjected to site requirement which will be in between 350 SQF. All glycol circulation pipline should be of PPR make Aster or Fusion. Consist of union ball valve and complete glycol line circulation set. With 19 mm thick nitrile insulation complete in all respects.
10Schedule "F" (Utility) Hot water Tank:-Supplying of 200 liter Mash Cum boiling tank Double layer tank MOC SS 304 Make Jindal/Tata steel Main shell thickness 3 mm Smooth Grind finish from inside insulation Thickness 1.5 MM outer finish of tank should be Mirror polish insulation should be 60 mm thick insulated with mineral woolTop should be Torispherical dish end with SS 304 350 OD manhole. All joint should be TIG welded and joint should be smoothen and polished pipe for nozzel should be of SS 304 make Jindal Nozzel end should be of SS 304 Tri clamp type Pump head should be of SS 304 and Motor for the same pump should be of 1.5HP 20 meter head and make Crompton or ABB subjected to availabilty. Tank should consist of 6 KW heating coils MOC Stainless steel 304 with 1" threaded nipple. quantity 4 Nos. gross volume should be 25% more from 200 liter complete in all respects.
11CIP tank:- Supplying of Cleaning tank make ss 304 capacity 75 liter working 100 liter gross volume 3mm thick plate top half lid opening and bottom flat stand on three lag. Tank should be mounted on movalble trolley consist of four wheel with a hot water tank similar pump and pump connected with 75 liter tank with ss pipe sch 80 and butterfly valve with earier mention specificationcomplete in all respects.
12Brewing Consultancy monthly Fees/Charges :- For Head Brewer, Assistant Brewer and brewing Helper for Beer Making (Every month) Choices of Beer flavour as per requirement.
13Schedule A (Consumables):- Supplying of 200 ltr. Glycol to start the plant
14Supplying of Beer tower with Flash chiller and python pipe with beer taps. At ground floor upto 20mtr. From brewery.
15Supplying of 150 LPH PLANT WITH 1000LTR. FOR RO WATER STORAGE AND 2000LTR. FOR SURGE TANK WITH ALL PIPELINE
16Schedule "F" (Delivery erection commisioning):-complete erection of all the equipments mentioned above as per layout at site including testing and commisioning till despensing system alongwith freight charges up to site at Hotel Kunzam Manali Distt. Kullu (H.P.)
17The performance warranty period of the plant will be for 2 years.The successful bidder shall maintain the plant for 2 years and no amount will be paid for 2 years.However, the bidder have to code the AMC charges for next 5 years for each year separately. (after 2 years of warranty period)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail