Renewal Work By Sdbc On 1-Uttarkashi Lambgaon Ghansali Tilwara Motor Road Road, 2-Budhakedar Anyarakhal Motor Road, 3- Chatiyara Khawara Motor Road In Ghansali Constituency Of Distt. Tehri Garhwal Under Annual Repair Year 2022-23.
Tender Overview
Project Description
Renewal Work By Sdbc On 1-Uttarkashi Lambgaon Ghansali Tilwara Motor Road Road, 2-Budhakedar Anyarakhal Motor Road, 3- Chatiyara Khawara Motor Road In Ghansali Constituency Of Distt. Tehri Garhwal Under Annual Repair Year 2022-23.
BOQ
| Sl. No. | Item Description |
| 1 | 1-Uttarkashi lambgaonGhansaliTilwara Motor Road road (Equivalent length 5.89 km.) |
| 2 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405..[Grading of no-3] (22.4 -53 mm size) |
| 3 | Tack Coat providingand applyingtack coat with Bitumen emlsion RS-1 using emlsion distributer@ of 0.20 to 0.25 kg/sqm,on the prepared bituminous surface cleaned with hydraulic broom as per TSclase 503 |
| 4 | BM:- Bituminous MacadamProviding and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.(Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose.The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) |
| 5 | Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects for Grading II-10 mm VG-10 |
| 6 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes. |
| 7 | 2-Budhakedar anyarakhalMotor Road (Equivalent length 5.35 km.) |
| 8 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405..[Grading of no-3] (22.4 -53 mm size) |
| 9 | Tack Coat providingand applyingtack coat with Bitumen emlsion RS-1 using emlsion distributer@ of 0.20 to 0.25 kg/sqm,on the prepared bituminous surface cleaned with hydraulic broom as per TSclase 503 |
| 10 | BM:- Bituminous MacadamProviding and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.(Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose.The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) |
| 11 | Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects for Grading II-10 mm VG-10 |
| 12 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes. |
| 13 | 3-Chatiyara khawara Motor Road (Equivalent length 2.14 km.) |
| 14 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405..[Grading of no-3] (22.4 -53 mm size) |
| 15 | Tack Coat providingand applyingtack coat with Bitumen emlsion RS-1 using emlsion distributer@ of 0.20 to 0.25 kg/sqm,on the prepared bituminous surface cleaned with hydraulic broom as per TSclase 503 |
| 16 | BM:- Bituminous MacadamProviding and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder,transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.(Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose.The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) |
| 17 | Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects for Grading II-10 mm VG-10 |
| 18 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, as per IRC:35 .The finished surface to be level,uniform and free from streaks and holes. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.