|
| 1 | (A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work. |
| 2 | S.T. Pole 11 Mtr. Long |
| 3 | 11 KV M.S. Top Channel (100x50x6) 2240 mm |
| 4 | 11 KV M.S. Dropper Channel (100x50x6) 2240 mm |
| 5 | 11 kV Disc Insulator45 KN |
| 6 | 11 kV Discfitting 45 KN |
| 7 | Earthing Complete |
| 8 | 11 kV (3 x 185) sqmm XLPE cable |
| 9 | H.S. Cable jointing kit for 11 KV (3 x 185) sqmm cable Outdoor/Indoor type. |
| 10 | 11 kV Fuse set |
| 11 | H.S. Cable jointing kit for 33 kV (3 x 300) sqmm cable Outdoor/Indoor type |
| 12 | 11 KV Pin insulator |
| 13 | 11 KV GI pin with nut |
| 14 | T off channel (100 x 50 x 6) 1300 mm |
| 15 | M.S. Angle (65 x 65 x 6)for brassing with 04 clamp |
| 16 | T/F Base angle set |
| 17 | ACSR Dog conductor |
| 18 | 33 KV disc insulator B&S type 70 KN |
| 19 | Disc fitting 70 KN |
| 20 | 11 KV Stay set (16 X 1800) mm with stay wire, stay clamp, insulator , nut & bolt etc. |
| 21 | 33 KV M.S. Top Channel (125x65x6) 3200 mm |
| 22 | 33 KV M.S. Dropper Channel (125x65x6) 3000 mm |
| 23 | 33 KV Pin insulator |
| 24 | 33 KV GI pin with nut |
| 25 | LT Cable 4x120 sqmm |
| 26 | F Clamp |
| 27 | 11 KV TPMO SET |
| 28 | G.I. wire 8/10/16 SWG |
| 29 | 33 kV (3 x 300) sq mm XLPE cable |
| 30 | (B) WORK |
| 31 | Fabrication, erection & painting ofS.T. Pole11 Mtr long of Single pole on ST pole 11 M long with fixing of necessary clamps and other accessories required for erection. |
| 32 | Fabrication, erection & painting of Double pole cable exposure on S.T. Pole11 Mtr long withfixing ofchannel , angle pin & pin insulator,D.O setand making bus bar complete work with earthing by earth rod 20x2500 mm for 11 KV Lineas per RESSPO drawings. |
| 33 | Grouting & Plinthing of single ST pole as per RESPO Norms (0.268 Cum) |
| 34 | Installation of cable box 11 KV (3 x 185) sq mm Outdoor/Indoor |
| 35 | Installation of cable box 33 KV (3 x 300)/ (3x400) sq mm Outdoor/Indoor |
| 36 | Laying of 11 KV(3 x 185) sq. mm double circuit XLPECable in HDPE pipe PN-66 inch dia by horizontal deep with drilling method (All materials will besuppllied by the contractor at his own cost except XLPE cable.) (Total length of cable =900x2 (double circuit)=1800 Mtr.) |
| 37 | Laying of 11 KV(3 x 185) sq. mm XLPE Cable by digging of trench 1.2 mtr deep vide as per ISSin HDPE pipe PN-6, 6\" diaincluding providing bricks, sand, stone slab the inter exel spacing bettween to cable shoulde be in between 0.25 m to 0.40 m as required at site as per RESPO Norms. |
| 38 | Stringing & sagging of three phase 11 KV line on ACSRDog conductor as per RESSPO Norms. |
| 39 | Stringing & sagging of three phase 33 KV line on ACSRDog conductor as per RESSPO Norms. |
| 40 | Fixing of earth rod (2500 x 20) mm as per norms. For earthing support ofold existing poles of LT lines including 6 SWG GI/Earth wire . (All Materials supplied by contractor) |
| 41 | Nozeling & groutingof 11 KV stay set complete.(All the civil material will be be supplied by Contractor) |
| 42 | Nozeling & groutingof 33 KV stay set complete.(All the civil material will be be supplied by department.) |
| 43 | Placement of 11/0.4 KV T/Fs on S/S Type D/P&installation, commissioning of 25 KVA to 100 KVA T/Fincluding cost of L-pieces and lugs jumpering with the system with painting as per RESSPO norms.( Alltherequired martial for abovejob shall besupplied by contractor except T/Fs) |
| 44 | High Pressure testing of 33 KV & 11 KV XLPE cable. Testing equipment will be arranged by the contractor. |
| 45 | 33 KV cable |
| 46 | 11 KV cable |
| 47 | Dismantling of 11KV line, L.T. lines & distribution boxes and its dump at suitable place on site up to completion of work and its safe loading/unloading/weighing carriage from dump site to je\"s store/ESC Raebareli(Except broken PCC Pole). |
| 48 | ST Pole 11 Mt Long/PCC pole |
| 49 | ACSR mix conductor |
| 50 | Steel scrape |
| 51 | Stringing & sagging of three phase 4 wire LT line on ACSRDog conductor as per RESSPO Norms. |
| 52 | Laying of 33 KV(3 x 300) sq. mm double circuit XLPECable in HDPE pipe PN-6,6\"dia by horizontal deep with drilling method (All materials will be supplliedby the contractor at his own cost except XLPE cable.) (Total length of cable =250x2 (double circuit)=500 Mtr.) |
| 53 | (C) Following Metarials to be supplied by contractor |
| 54 | Nut and bolt off size |
| 55 | PG clamp |
| 56 | Stone Pad |
| 57 | Number Plate |
| 58 | Danger Board with clamp |
| 59 | G.I. barbed wire |
| 60 | Alumineum Binding wire 6 SWG |
| 61 | Aluminium Paint |
| 62 | Red Oxide paint |
| 63 | LT Clamp for STP |
| 64 | Earthwire clamp with Nut and bolt |
| 65 | LT Shackle Insulator |
| 66 | Loop Guard complete 3 Phase |
| 67 | Aluminium JointingSleevs for conductor |
| 68 | LT PVC Spacer |
| 69 | LT incomming panel with metering equipment and fixing arrangment |
| 70 | X-arm holding clamp/ LT clamp/Top/Dropper/T Off with bolt & nut for STP |
| 71 | HDPE Pipe PN-6,6\"dia. (Purchased from the approved venders of UPPCL) |