Construction Of Right Main Canal Of Joram Mip In Thaurmunda Block Of Mayurbhanj District Under Completion Of Incomplete Projects 2022-23.
Tender Value
53.99 Lakhs
Estimated cost
Bid Submission
07 Apr 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
thakurmunda → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Right Main Canal Of Joram Mip In Thaurmunda Block Of Mayurbhanj District Under Completion Of Incomplete Projects 2022-23.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and grubbing shrub light jungles anduprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris {covered with plants 30cm girthand open space less than 50%to70%} and depositing the same away from work site with all leads and lifts complete as directed by the Engineer-in-charge. |
| 2 | Excavation in all kinds of soil including moorum, stoney earth, gravel etc. excepting all kinds of rock & boulders exceeding 0.014 cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually with all lead and lift as per the direction of Engineer-in Charge including stacking of useful materials as directed. |
| 3 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1 Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the direction of Engineer-in-Charge.(Measurement of the fill to be taken on the finished compacted section under OMC condition.) |
| 4 | Labour for laying earth in embankments in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR but excluding cost and conveyance of earth. |
| 5 | Fine dressing and turfing the slopes of dams and dyke with all leads and lifts as per direction of Engineer-in-charge. |
| 6 | Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume with all leads, lifts and delifts including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department if necessary complete as directed by the Engineer-in-charge. |
| 7 | Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all leadfor materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground leveletc. complete in all respect to proper slope & levelwith all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. |
| 8 | Cement concrete M20 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all leadfor materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground leveletc. complete in all respect to proper slope & levelwith all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. |
| 9 | Providing rigid shuttering with box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages and dam blocks including cost of all materials and labour T & P. etc. complete as directed by theEngineer- in- charge including removal of forms. |
| 10 | Supplying, fitting & placing HYSD barsreinforcement and tying the grills as per approved design & drawing and placing in position including cost, conveyance, royalty and other taxes binding wires of 18 to 20 gauge with supply of all labour,taxes as per prvailing norm and T&P required for the work etc, complete in all respect as directed by the Engineer-in-Charge. |
| 11 | Rough stone dry packing in approns and revetments 30 cm. and above sizeof approved quality free from weathered skin including filling the interstices with small stones with cost, conveyance, royalty and other taxes of all materials as directed by the Engineer-In-Charge. |
| 12 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge. |
| 13 | Providing, supplying and laying in position of 900mm dia NP3 hume pipeembedded with cement concrete M20 grade using 20mm down graded black hard crushed broken granite chips in C.M (1:3) with all leads, lifts & delifts including cost ,conveyance & other taxes of all materials including supply of all labour & T & P materials required for the item complete as directed by the Engineer-in-charge. |
| 14 | Earthworkin hard soil with all leads, lifts and delifts including roughdressing & breaking clods to maximum 5cm to 7 cm size & depositing the excavated materials in layers not exceeding 0.30mtr in depth etc complete and as directed by the Engineer-in-charge. |
| 15 | Providing, supplying and laying in position of 1000mm dia NP3 hume pipeembedded with cement concrete M20 grade using 20mm down graded black hard crushed broken granite chips in C.M (1:3) with all leads, lifts & delifts including cost ,conveyance & other taxes of all materials including supply of all labour & T & P materials required for the item complete as directed by the Engineer-in-charge. |
AI Tender Summary
Tender Timeline
Mar 28, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedApr 07, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedApr 08, 2022
Bid Opening Date
Technical bids will be opened and evaluated.