Tender For Sant Tukaram Natyagruh-Fire Fighting Works- 1 Supplying And Erecting Abc Powder Type Fire Extinguisher As Per Is : 13849 / 15683 Of 6 Kg Capacity With Necessary Clamp For Erection On Wall. ( 10-2-36 ) 2 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 25 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-2 ) 3 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 50 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-3 ) 4 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 65 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-4 ) 5 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 75 / 80 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-5 ) 6 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 100 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-6 ) 7 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 150 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-7 ) 8 Supplying And Erecting G.I. Pipe Above Ground Of ‘C’ Class Erw Of Size 200 Mm Dia With Necessary Fittings Complete As Per Specification No. Ff-Pp ( 13-5-8 ) 9 Providing Coating Of Bitumen Paint & 4Mm Thick Wrapping For Underground 150 Mm Ring Main Of Fire Fighting System. ( 13-5-10 ) 10 Supplying And Erecting Cast Iron Foot Valve Ball Type / Flap Type Of Size 100 Mm Dia With Strainer For Negative Suction Complete As Per Specification No. Ff-Vl / Fv ( 13-6-2 ) 11 Supplying And Erecting Cast Iron Double Flange Sluice Valve 160 Mm Dia. Complete As Per Specification No. Ff-Vl / Sv ( 13-6-11 ) 12 Supplying And Erecting Cast Iron Double Flange Butterfly Valve Of Size 75 / 80 Mm Dia. Complete As Per Specification No. Ff-Vl / Bfv ( 13-6-15 ) 13 Supplying And Erecting Cast Iron Double Flange Butterfly Valve Of Size 100 Mm Dia. Complete As Per Specification No. Ff-Vl / Bfv ( 13-6-16 ) 14 Supplying And Erecting Cast Iron Double Flange Nrv Of Size 75 / 80 Mm Dia Complete As Per Specification No. Ff-Vl / Nrv ( 13-6-19 ) 15 Supplying And Erecting Cast Iron Double Flange Nrv Of Size 150 Mm Dia Complete As Per Specification No. Ff-Vl / Nrv ( 13-6-21 ) 16 Supplying And Erecting Stainless Steel Single Outlet Hydrant Valve Fitted With Necessary Accessories Complete As Per Specification No. Ff-Vl / Hv ( 13-6-31 ) 17 Supplying And Installingone Piece Moulded Hdpe / Fibre Water Tank For Negative Suction Only, Having Capacity 1000 Litres Fitted With Necessary Accessories Complete As Per Specification No. Ff-Ffa / Pt ( 13-7-1 ) 18 Supplying And Installingwall Mounting Swinging Hose Reel Drum Fitted With 19 Mm Dia. 30M Long High Pressure Polypropylene ( Polyhose ) Fitted With Necessary Accessories Complete As Per Specification No. Ff-Ffa / Hv ( 13-7-2 ) 19 Supplying Fire Fighting Controlled Percolation ( C.P. ) Hose Pipe, 63Mm Dia, 15M In Length, Fitted With Necessary Accessories Complete As Per Specification No. Ff-Ffa / Cph ( 13-7-3 ) 20 Supplying And Erecting Fire Brigade Header Of 150 Mm Dia, For Supplying Water In Fire Tank Complete As Per Specification No. Ff- Fa / Fbc ( 13-7-10 ) 21 Supplying And Erecting Fire Brigade Header ( Siamese Connection ) Of 150 Mm Dia For Supplying Water To Wet Riser System Complete As Per Specification No. Ff-Ffa / Smc ( 13-7-11 ) 22 Supplying And Installingair Vessel Of 300 Mm Dia 1.5M In Height M.S. Tank Installed Inside Pump House / On Terrace Complete As Per Specification No. Ff-Ffa / Act ( 13-7-12 ) 23 Supplying And Installing Pressure Gauge Of 100 Mm Dia., 0- 300 Psi Or 0-14 Kg Per Cm Square Fitted With 12 / 15 Mm Dia. Pad Cock Valve, And G.I. Pipe, Elbow Etc. Complete As Per Specification No. Ff-Ffa / Pg ( 13-7-17 ) 24 Supplying, Installing, Testing And Commissioning Ofoptical Type Smoke Detector Complete On Box As Per Specification No. Ff- Fas / Sd ( 13-8-2 ) 25 Supplying, Installing, Testing And Commissioning Four Wire Conventionally Single Ended Reflected Type Beam Smoke Detector With 8 “ Receiver . The Range Of Smoke Detector Is Max 164 Feet. ( 13-8-3 ) 26 Supplying, Installing, Testing And Commissioning Ofmanual Call Point ( Pill Box ) With Break Glass Push Button In Metal Enclosure Complete As Per Specification No. Ff-Faas / Mcp ( 13-8-5 ) 27 Supplying, Installing, Testing And Commissioning Ofhooters With Crca Enclosure Complete As Per Specification No. Ff-Faas / Htr ( 13-8-6 ) 28 Supplying, Installing, Testing And Commissioning Ofremote Response Indicators Complete As Per Specification No. Ff-Faas / Rri ( 13-8-7 ) 29 Supplying, Installing, Testing And Commissioning Offrls, Xlpe Armoured Cable 2 Core 1.5 Sq.Mm. Copper Conductor Complete Erected On Wall / Ceiling Complete As Per Specification No. Cb- Lt / Cu ( 13-8-8 ) ( Note:-1 Increase Overall Rate By 7.5% For Frls. ) ( For Fr Xpe Cable Rate Is 97 Adding 7.5% As Per Note For Frls ) 30 Supplying, Installing, Testing And Commissioning Of4 Zones Microprocessor Based Conventional Fire Alarm Control Panel ( Facp ) With Standard Accessories Complete As Per Specification No. Ff-Faas / Facp ( Note:-Increase Overall Rate By 25 % For Additional Zone As Per Requirement ) ( 13-8-12 ) ( For 2 Zone Panel Rate Is17588 Adding 50% As Per Note For Additional 2 Zone Will Be 26382 ) 31 Servicing Of Pump 32 Maintenance Of Control Panel 33 Cleaning Of Tank 34 Amc For 3 Years ( As Per Scope Of Wok ) 1 ) Inspection Visit & Maintenance Of Equipment: Checking / Testing / Cleaning / Oiling / Greasing Of All Components Related To Fire Safety Equipment, Including Fire Alarm System , Hydrant Delivery Valve, Hose Reel With Drum, Gate Valve, Fire Pump And Response Indicators ( R.I ) , Sprinkler System, Etc 2 ) Consumable Items Of Fire And Electrical Equipment Are To Be Replaced As And When Required. 3 ) Cleaning And Painting: Basic Cleaning And Polishing Of Every Gun-Metal Make Vital Outlet, I.E., Adaptor Hydrant Valve, Branch Pipe, Fcb, Extinguishers Etc. And Cleaning Of Smoke Detector By Blower.4 ) Maintenance Of Fire Fighting System Etc.: Overall Responsibility Of Maintenance Of Fire Fighting System, Fire Pumps Including Periodic Overhauling, Oiling, And Greasing, Preventing Maintenance Of Sprinkler System Leakage, Attending To Sprinklers As And When Necessary. Detection And Attending To Leakages If Any Within The System. Fire Fighting System Attendance ( Electrical Parts ) . Regular Checks And Drills As Per Safety Norms. 5 ) Renewal Of Fire Noc: Liasioning With Wbf&Es For Getting Fire Noc, When Itfalls Due For Renewal6 ) Checking / Testing / Repairing / : Repairing Of Water Pipe Line Related To The Firefighting System7 ) Mock Fire Drill & Training Program To Be Conducted With Prior Notice To Nsic.