Public Works Department-PWD has published Construction C / O Cc Pavement Road And Cc Drain With One No. Slab Culvert From Jully Road Korjil Bridge Point To Mt Colony At Papu Nallah. C / O Cc Pavement Road And Cc Drain With One No. Slab Culvert From Jully Road Korjil Bridge Point To Mt Colony At P. Submission Date for this Tender is 30-03-2022. RCC Road Tenders in naharlagun Arunachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) |
2 | Preparation of Sub Grade:) Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. |
3 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade |
4 | By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) a0 Grading I material |
5 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) |
6 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) |
7 | Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.) i)Single Row for Single utility services |
8 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.) |
9 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.) |
10 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC M20 using concrete mixer |
11 | Reinforcement of RCC work including bending, binding and placing in position complete.b) Cold twisted bars. |
12 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) I Ordinary soil A Manual Means (i) upto 3 m depth |
13 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
14 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M20/ Using Concrete Mixer |
15 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications,In Footing and Main Wall |
16 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
17 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material |
18 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) I Ordinary soil A Manual Means (i) upto 3 m depth |
19 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.) |
20 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specificationsPCC Grade M15 |
21 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) I Ordinary soil A Manual Means (i) upto 3 m depth |
22 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications ( PCC M-15) |
23 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications ( PCC M-20) |
24 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20/ Using Concrete Mixer |
25 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
26 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and Technical Specifications,In Footing and Main Wall |
27 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material |
28 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate,true to line and grade,tolurence of vertical RCC post not to exceed 1 in 500,centre to centre spacing between vertical post not to exceed 2000 mm,leaving adequate space between vertical post for expansion,complete as per approved drawings and technical specifications. |
29 | Drainage Spouts complete as per drawing and Technical specification |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy