Construction Work Of Concrete Road And Pucca Drain At Holding No- 1290 / A / 1 In Ward No- 28, At Khan Road , Altara R.S. And L.R. Dag No- 1244, 1245, 1246, 1248, 1250, Khatian No-366, 107 / 1, J.L. No- 4, Mouza- Bazra, P.S. Bhadreswar Under Cm
Tender Overview
Project Description
Construction Work Of Concrete Road And Pucca Drain At Holding No- 1290 / A / 1 In Ward No- 28, At Khan Road , Altara R.S. And L.R. Dag No- 1244, 1245, 1246, 1248, 1250, Khatian No-366, 107 / 1, J.L. No- 4, Mouza- Bazra, P.S. Bhadreswar Under Cmc.
BOQ
| Sl. No. | Item Description |
| 1 | Page No- 1; Item No- 2(A)Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 2 | Page No- 240, Item No- 3.16(Road Schedule).Box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flanks as necessary or on berm to approxmate rate and camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of E-I-C including uprooting and where necessary. (ii) Depth above 150mm. |
| 3 | Page No; 2, Item No; 4 (b) (Building Schedule) (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand |
| 4 | Page No- 14; Item No; 1. (Building Schedule)Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level & filling joints with powdered earth or local sand. |
| 5 | Page No- 34, Item No- 22(1)(a).Cement concrete with graded stone ballast (40 mm. Size) excluding shuttering. In ground floor foundation. (a) 1:3:6. Proportion [Pakur Veriety] |
| 6 | Page No; 15; Item No; 7 (a) (b)(Building Schedule)Brick work with 1st class bricks in cement mortar (4:1) a) In foundation and plinth. |
| 7 | Page No- 16, Item No- 16. 125mm. Thick brickwork with 1st. Class bricks in cement (4:1) in ground floor. |
| 8 | Page No; 43, Item No; 38 (Building Schedule)(Road Schedule)Hire and labour charges for shuttering with hard wood for precast R.C. slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage etc. complete in all respect. (only the area in contact with concrete to be measured) |
| 9 | Page No; 43, Item No; 40 (a)(i)(I) (Building Schedule)(Road Schedule)Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. a) For works in foundation, basement and upto roof of ground floor/upto 4m.Tor steel/Mild steel. |
| 10 | Page No; 26, Item No; 10(i)(Building Schedule)Ordinary cement concrete(mix1:1.5:3)with graded stone chips (20mm nominalsize)) excluding shuttering and reinforcement, if any, in ground floor as per IS-456-2000. Pakur Variety (Ground floor). |
| 11 | Page No; 189, Item No; 1(ii) (b) (Building Schedule) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] ) i)With 1:4 cement mortar b) 20 mm thick plaster. |
| 12 | Page No; 192, Item No; 15 (Building Schedule) Neat cement punning about 1.5 mm th. In wall,dado,window,sills,floor,drain etc.NOTE: Cement 0.152 cu.M. per 100 sq.M |
| 13 | Page No; 1, Item No; 3(a) (Building Schedule) Earth work in filling on foundation trenches or plinth with good earth, in layers not exceeding 150mm. Including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of fishied quantity of work) (a) with earth obtained from excavation of foundation. |
| 14 | Add @ 6% for CGST |
| 15 | Add @ 6% for SGST |
| 16 | Add 1% labour cess |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.