Numaligarh Refinery Limited has published Supply Of Pfcc Columns Non Lli As Per Technical Specifications For Numaligarh Refinery Limited Supply Of Pfcc Columns Non Lli As Per Technical Specifications For Numaligarh Refinery Limited , Supply Of Supply Of Pfcc Columns Non Llifor Nrep Project , De. Submission Date for this Tender is 02-05-2022. Contactors Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-Mar-2022 | Addendum_01_EMD_Clar | Fee | 21-04-2022 |
2 | 05-Apr-2022 | Addendum_2_commclar1 | Other | 21-04-2022 |
3 | 21-Apr-2022 | Addendum_3_Ext1 | Date | 02-05-2022 |
Sl. No. | Item Description |
1 | SUPPLY OF SUPPLY OF PFCC COLUMNS NON LLIFOR NREP PROJECT |
2 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing and supply of PFCC COLUMNS NON LLI - LCO Stripper (Tag. No. 1P25-CC-0526) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles as per MR. |
3 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing and supply of PFCC COLUMNS NON LLI - LPG Amine Contactor (Tag. No. 1P25-CC-1027) (Qty-1 No) with accessories, Commissioning Spares, Special Tools and Tackles as per MR. |
4 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing and supplyof PFCC COLUMNS NON LLI- Primary Absorber (Tag. No.1P25-CC-1326) (Qty-1 No)with accessories, Commissioning Spares, Special Tools and Tackles as per MR. |
5 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing and supplyof PFCC COLUMNS NON LLI- Secondary Absorber (Tag. No. 1P25-CC-1327) (Qty-1 No)with accessories, Commissioning Spares, Special Tools and Tackles as per MR. |
6 | Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing and supply of PFCC COLUMNS NON LLI- Off Gas Scrubber (Tag. No.1P25-CC-1328)(Qty-1 No)with accessories, Commissioning Spares, Special Tools and Tackles as per MR. |
7 | Charges for SITE Supervision of Erection / Installation andTesting for 10 (Ten) Man-Days for each equipment forPFCC COLUMNS NON LLI |
8 | Per diem charges for upto 8 hours work on normal working days. |
9 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
10 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail