Agriculture Cooperative Closing in 0 days TDR #31579557

Fabrication Jobs - 2 Pipelines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 3 Pipelines [ M.S. / G.I. ] Erection Up To 2 Dia. 4 Pipelines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 5 Dismantling, Cleaning,

Issued by Cooperative · Rohtak, Haryana
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Apr 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
100
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rohtak → Haryana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Fabrication Jobs - 2 Pipelines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 3 Pipelines [ M.S. / G.I. ] Erection Up To 2 Dia. 4 Pipelines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 5 Dismantling, Cleaning, Burning & Refitting Of Existing Pipe Lines Of All Sizes ( For Cleaning & Modification Purposes ) 6 M.S Pipe Line Above 12 Dia. Dismantling 7 M.S Pipe Line Above 12 Dia. Fabrication 8 M.S Pipe Line Above 12 Dia. Erection 9 Dismantling Of Flanges / Blind For Reuse 10 Refitting Of Old Flanges / Blind [ Reuse ] New 11 Fabrication Of Flanges / Blind From M. S. Plate 12 Valves Dismantling & Fitting Up To 6 Size 13 Valves Dismantling & Fittingfrom 7 To 12 Size 14 Valves Dismantling & Fitting Above 12 Size 15 Dismantling & Fittingof Ms Fabricated Right Angle / Globe Valve Of Size More Than 12 Size 16 Dismantling & Fitting Of C.I. Pipe &Accessories 17 Dismantling& Fitting Of S.S.Pipe & Accessories. 18 Dismantling Of Ms Bend, Tee, Nipple, Reducer Above 12 19 Fabrication Of Ms Bend, Tee, Nipple, Reducer Above 12 20 Erection Of Ms Bend, Tee, Nipple, Reducer Above 12 21 Dismantling, Fab. & Erection Of M.S. / S.S. Pipe Accessories ( Tee, Cone, Cross, Distance Piece, Nipple, Reducer, Bend ) 22 Dismantling, Fab. & Erection Of M.S. Plate Jobs ( Tanks, Gutters, Chutes Pipe Rolling, Boiler Ducting Etc. ) 23 Dis. / Fab. / Erection Of Internal Structure Of Wet Scrubber. 24 Dismantling Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 25 Fabrication Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 26 Erection Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 27 Repairing Of Old Platform Dismantling, Fab.&Erection 28 Dismantling, Fab.& Erectionof Railing 29 Patch Work Upto 4 Sq. Ft. Max. 30 Patch Work Above 4 Sq. Ft. Welding Work ( Two Round ) 31 Fabrication And Erection Of Condensate Pit. 32 Dismantling, Fabrication And Erection Of Molasses Conditional With Coil And Drive System. 33 Strengthening Of Quad Body No. 3 And No. 4. 34 Dismantling, Fabrication And Erection Of Hopper. 35 Dismantling, Fabrication And Erection Of Hopper. 36 Dismantling, Erection And Commissioning Of Pan Condenser 37 Dismantling And Erection Of Air Compressor’S Tank 38 Repairing Of Id Fan For Boiler Side. 39 Dismantling, Fabrication & Erection Of Bagacillopipe From Bagacillo To Vacuum Filter 40 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Semi-Kestnner, Juice Heaters ) 41 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Vapour Cell & Evaporator Bodies ) 42 Dismantling, Fitting & Hydraulic Testing Of S.S / Brass Tubes ( Pans ) 43 Dismantling, Fabrication & Erection Of Pan And Quad Down Take 44 Dismantling, Fab. & Erection Of Pan And Quad Calanderia Jacket. 45 Dismantling Of Up To 4 Pump & 15 Hp Motor. 46 Erection Of Up To 4 Pump & 15 Hp Motor. 47 Dismantling Of 4” To 8” Pump & 15 To 40 H.P.Motor 48 Erection Of 4” To 8” Pump & 15 To 40 H.P.Motor 49 Dismantling Of Above 8” Pump & Above 40 H.P.Motor 50 Erection Of Above 8” Pump & Above 40 H.P.Motor 51 Dismantlingof G.I. / A.C.C. Sheet 52 Fitting ( Erection ) Of G.I. / A.C.C. Sheet 53 Dismantling Of Water Gutter & Ridge 54 Erection Of Water Gutter & Ridge 55 Dismantling, Fabrication, Erection Of Sulphur Furnace Complete 56 Dismantling, Fab. & Erection Of The Melter / Receiver Of Sulphur Furnace. 57 Dismantling, Fabrication & Erectionof Shell Of Sulphur Furnace 58 Dismantling, Fabrication & Erectionof Scrubber Of Sulphur Furnace 59 Dismantling , Fabrication & Erectionof Steam Jacket Of Sulphur Furnace 60 Dismantling, Fabrication, Erection Of Sulphur Furnace Cooler 61 Dismantling, Fabrication & Erection Of The Bottom Portion Of Weight Juice Tank With Ms Plates 62 Dismantling, Fabrication & Erection Of The Scrappers Of Dorr Clarifier With Ms Plates 63 Dismantling, Fabrication & Erection Of The Catcher Bottle Of Vac. Filter With Ms Plates 64 Dismantling, Fabrication & Erection Of The Bottom Of Dorr Clarifier With Ms Plates 65 Dismantling, Fabrication & Erection Of The Mud Tray Of Vac. Filter With Ms Plates 66 Dismantling, Fabrication & Erection Of The Mud Tank Bottom Of Vac. Filter With Ms Plates 67 Dismantling, Fabrication & Erection Of The Conical Portion Of Juice / Water / Mud Tank With Ms Plates 68 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Pans 69 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Pan Tops 70 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Saveall 71 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Vac. Crystallizer 72 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Bottom Plates Of Syrup & Molasses Tanks & Conditioners 73 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Side Plates Of Syrup & Molasses Tanks & Conditioners 74 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Pan Shell Strengthening Work With Ms Channels / Angles / Ms Plate Rings 75 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Top Cone Strengthening Work With Ms Channels / Angles / Ms Plate Rings 76 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Strengthening Of Vapour Line By Inner Side Supporting Of Angles / Pipes 77 Dismantling, Fab. & Erection Of Coils Of Horizontal Crystallizers 78 Dismantling Of Shaft Of Crystallizers 79 Fabrication Of Shaft Of Crystallizers 80 Erectionof Shaft Of Crystallizers 81 Replacement Of 3” Ms Coils ( Including Bends, Flange, Etc. ) Of Vertical Crystallizers 82 Dismantling, Fab. & Erection Of Arms Of A- Crystallizers 83 Replacement Of Coils Of Dorr & Evaporator Bodies - Juice Coils ( Dismantling, Fab. & Erection ) 84 Replacement Of Coils Of Dorr & Evaporator Bodies - Ammonia & Gas Coils ( Dismantling, Fab. & Erection ) 85 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Bottom Plates 86 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Side Plates Upto Height 10Mtr 87 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Top Cone Plates With Supports 88 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Cooling Coils 89 Dismantling, Fabrication, Erection Of Ms Pipe Coil Fitting At Various Station 90 Fabrication Of Drum Internal Plates Of Boiler 91 Dismantling, Fabrication And Erection Of Expansion Joints Of Boiler 92 Dismantling Of Existing Transient Heaters 93 Shifting Of New Transient Heater At Site 94 Erection Of New / Existing Transient Heaters 95 Dismantling / Fab. / Erection Of Weak Portion Of Partition Plates Ofjuice Heaters 96 Dis. / Repairing / Fabrication & Erection Of Bagasse Belt Conveyor On Turnkey Basis 97 Dismantlingofspurgar Of Juice Sulphitor For Cleaning 98 Fabricationofspurgar Of Juice Sulphitor For Cleaning 99 Erection / Refitting.Ofspurgar Of Juice Sulphitor For Cleaning 100 Dis, Fab & Erection Of Stainer Of Injection Pump / Spray Pump 101 Injection Channel Jail Dismantling, Fab. & Erection. 102 Repairing Of Agitator Of Vaccum Filter Dismantling, Fab. & Erection. 103 Fabrication Of Sweeper Trolly 104 Repairing / Changing Of Vertical Crystallizer Arms In Top Gutter ( Scrapper Type ) Round Shape 105 Etp Middle Shaft Repairing / Replacement 106 Fab Of New Lime Tank With Its Shaft, Stirer Etc. At Etp 107 Dismantling, Fab & Erection Of Save All Ofevaporator Bodies 108 Replacement Of Juice Sulphiter Top 109 Dismantling Of Vibro Screen 110 Fabriaction Of Vibro Screen 111 Erection Of Vibro Screen 112 Repairing / Replacement Of Shell Of Sugar Melter 113 Replacement Of Shaft Of Sugar Melter 114 Replacemnet Of Arm Of Sugar Melter 115 Stair Case ( With Chequared Plate ) - Dismentling 116 Stair Case ( With Chequared Plate ) - Fabrication 117 Stair Case ( With Chequared Plate ) - Erection 118 Juice Heater Cover Dismantling, Fab. & Erection 119 Juice Heater Refitting With Testingby Pump. 120 Sight Glass Fitting In Condensate Bottle Of Seed & Juice Heaters / Any Vessel, By Welding The Sight Glass. 121 Dismantling, Fabrication, Erection Of Stainer Of Injection And Spray Pump 122 Stair Case At Sugar Bin Fabrication & Erection. 123 Vaccum Crystallizer Shell Fabrication, Erection& Patch. 124 New Planatory Gear Boxes For B Massecuite Crystallizer. 125 F.D. Old Impeller Is To Be Removed And New Is To Be Fitted And Trial. 126 Straightening Of Old Pipe Line Of Thickness 6-8Mm Into Plain Sheet By Rolling Machine 127 Pan No. 4 Mechanical Circulator Is To Be Dismantled And Parts To Be Shifted To W 128 Pan No. 4 Mechanical Circulagtoris To Be Dismantled And Parts To Be Shifted To Workshop For Machining.After Machining The Same Circulator Parts To Be Fitted And Trial. 129 Pan / Quad Condenser Tail Pipe Double Support Is To Be Provided With Atleast L 3” / Pipe 2.1 / 2” With Clamp System. 130 Rori Melter Is To Be Fabricated And Erected As Per Drg. 131 Replacement Of Id Fan Ducting & Casing. 132 Ss Condenser Repairing By Support To Be Given By Rings 133 Clear Juice Filter Arrangement By Jali Fitting - Dismantling, Fabrication, Erection 134 Dismantling, Fabrication, Erection Of Strengthening Of Factory Column, Structure, Channel, Beam Etc. 135 Juice Heater Header Partition Plate Top & Bottom Both Side - Dismantling, Fabrication, Erection 136 Oliver Filter Tray Dismantling, Fabrication, Erection 137 Centrifugal Machine Strengthening Dismantling, Fabrication & Fitting From Channel, Beam 138 Dismantling, Erection Of Ss Tail Pipe At Pan & Quad Condenser 139 Dismantling, Fabrication, Erection Tail Pipe Support Angle Channel 140 Dismantling, Fabrication, Erectionof Complete Pug Mill For Continuous Machine B- Massecuite. 141 Repairing Of Bottom Portion Of Hot Water Tank Replacement 142 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 2, Complete Scrubber With Its Internal Pipes. 143 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 3 ( Lime Side ) Complete Scrubber With Its Internal Pipes. 144 Sf Melter And Receiver Steam Jacket And Its Coil 145 Dismantling, Fabrication, Erection Of So2 Gas Coil / Pipe At Syrup Sulphiter 146 Dismantling, Fabrication, Erection Of Save All At Spare Body Of Quad 147 Dismantling Of Condensate Pit 148 Dismantling, Fabrication And Erection Of Top And Shell Of Quad Body 149 Dismantling, Fabrication And Erection Of Wt. Juice Tank 150 Dismantling, Fabrication And Erection Of Maceration Water Tank 151 Dismantling, Fabrication And Erection Of Feed Water Tank 152 Dismantling, Fabrication And Erection Of Wet Scrubber 153 Dismantling, Fabrication And Erection Of Boiler Furnace

BOQ

Name of Work: Fabrication jobs
Sl. No. Item Description
1Fabrication jobs
2PIPELINES [M.S./ G.I.] Dismantling up to12\"\" including bends, reducers, flanges etc.
3PIPELINES [M.S./ G.I.] Erection up to 2\" dia.
4PIPELINES [M.S./ G.I.]- do- above 2\" to 12\" dia.
5Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes)
6M.S Pipe line above 12\" dia. Dismantling
7M.S Pipe line above 12\" dia. Fabrication
8M.S Pipe line above 12\" dia. Erection
9Dismantling of flanges/ Blind for reuse
10Refitting of old flanges/Blind[reuse] new
11Fabrication of flanges/Blind from M. S. Plate
12Valves Dismantling & fitting up to 6\" Size
13Valves Dismantling & fittingfrom 7\" to 12\"\" Size
14Valves Dismantling & fitting above 12\" Size
15Dismantling & fittingof MS fabricated right angle/ globe valve of size more than 12\" size
16Dismantling & fitting of C.I. pipe &accessories
17Dismantling& fitting of S.S.Pipe & accessories.
18Dismantling of MS bend, Tee, nipple, reducer above 12\"
19Fabrication of MS bend, tee, nipple, reducer above 12\"
20Erection of MS bend, tee, nipple, reducer above 12\"
21Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend)
22Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.)
23Dis./fab./erection of internal structure of wet scrubber.
24Dismantling of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.)
25Fabrication of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.)
26Erection of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.)
27Repairing of old platform dismantling,fab.&erection
28Dismantling, fab.& Erectionof railing
29Patch work upto 4 sq. ft. max.
30Patch work above 4 sq. ft. Welding work ( Two round )
31Fabrication and erection of condensate pit.
32Dismantling, Fabrication and erection of Molasses conditional with coil and drive system.
33Strengthening of Quad Body No. 3 and No. 4.
34Dismantling, Fabrication and erection of Hopper.
35Dismantling, Fabrication and erection of Hopper.
36Dismantling, erection and commissioning of Pan Condenser
37Dismantling and erection of Air compressor’s Tank
38Repairing of ID fan for Boiler Side.
39Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter
40Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters )
41Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies)
42Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans )
43Dismantling, fabrication & erection of Pan and quad down take
44Dismantling, fab. & erection of Pan and Quad calanderia jacket.
45Dismantling of up to 4 \" pump & 15 HP motor.
46Erection of up to 4 \" pump & 15 HP motor.
47Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor
48Erection of 4” to 8” pump & 15 to 40 H.P.Motor
49Dismantling of above 8” pump & above 40 H.P.Motor
50Erection of above 8” pump & above 40 H.P.Motor
51Dismantlingof G.I./ A.C.C. Sheet
52Fitting (Erection) of G.I./ A.C.C. Sheet
53Dismantling of water gutter & ridge
54Erection of water gutter & ridge
55Dismantling, fabrication, erection of Sulphur furnace complete
56Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace.
57Dismantling, fabrication & erectionof Shell of Sulphur furnace
58Dismantling, fabrication & erectionof scrubber of sulphur furnace
59Dismantling , fabrication & erectionof steam jacket of sulphur furnace
60Dismantling, fabrication, erection of Sulphur furnace cooler
61Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates
62Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates
63Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates
64Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates
65Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates
66Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates
67Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates
68Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans
69Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops
70Dismantling, Fabrication & erection of MS plates of Pan station - Saveall
71Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer
72Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners
73Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners
74Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings
75Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings
76Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes
77Dismantling, fab. & erection of coils of horizontal crystallizers
78Dismantling of shaft of crystallizers
79Fabrication of shaft of crystallizers
80Erectionof shaft of crystallizers
81Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers
82Dismantling, fab. & erection of arms of A- crystallizers
83Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection)
84Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection)
85Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates
86Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr
87Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports
88Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils
89Dismantling, fabrication, erection of MS pipe coil fitting at various station
90Fabrication of Drum internal plates of boiler
91Dismantling, fabrication and erection of expansion joints of boiler
92Dismantling of Existing transient Heaters
93Shifting of new transient heater at Site
94Erection of new/ existing transient heaters
95Dismantling/ Fab./ Erection of weak portion of partition plates ofjuice heaters
96Dis./ Repairing/ Fabrication & erection of Bagasse belt conveyor on turnkey basis
97Dismantlingofspurgar of juice sulphitor for cleaning
98Fabricationofspurgar of juice sulphitor for cleaning
99Erection/refitting.ofspurgar of juice sulphitor for cleaning
100Dis, fab & erection of stainer of injection pump/spray pump
101Injection channel jail dismantling, fab. & erection.
102Repairing of agitator of vaccum filter dismantling, fab. & erection.
103Fabrication of sweeper trolly
104Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape
105ETP middle shaft repairing/ replacement
106Fab of new lime tank with its shaft, stirer etc. at ETP
107Dismantling, fab & erection of save all ofevaporator bodies
108Replacement of juice sulphiter top
109Dismantling of vibro screen
110Fabriaction of vibro screen
111Erection of vibro screen
112Repairing/ replacement of shell of sugar melter
113Replacement of shaft of sugar melter
114Replacemnet of arm of sugar melter
115Stair case ( With chequared plate) - Dismentling
116Stair case ( With chequared plate) - Fabrication
117Stair case ( With chequared plate) - Erection
118Juice heater cover dismantling, fab. & erection
119Juice heater Refitting with testingby pump.
120Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass.
121dismantling, fabrication, erection of stainer of injection and spray pump
122Stair case at sugar bin fabrication & erection.
123Vaccum crystallizer shell fabrication,erection& patch.
124New planatory gear boxes for B massecuite crystallizer.
125F.D. old impeller is to be removed and new is to be fitted and trial.
126Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine
127Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W
128Pan No. 4 mechanical circulagtoris to be dismantled and parts to be shifted to Workshop for machining.After machining the same circulator parts to be fitted and trial.
129Pan/quad condenser tail pipe double support is to be provided with atleast L 3”/pipe 2.1/2” with clamp system.
130Rori melter is to be fabricated and erected as per drg.
131Replacement of ID fan ducting & casing.
132SS condenser repairing by support to be given by rings
133Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection
134Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc.
135Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection
136Oliver filter tray dismantling, fabrication, erection
137Centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam
138Dismantling, erection of SS tail pipe at pan & quad condenser
139Dismantling, fabrication, erection tail pipe support angle channel
140Dismantling, fabrication, erectionof complete Pug Mill for continuous machine B- massecuite.
141Repairing of bottom portion of hot water tank replacement
142Dismantling, fabrication, erection of Sulphur furnace no. 2, complete scrubber with its internal pipes.
143Dismantling, fabrication, erection of Sulphur furnace no. 3 (Lime side) complete scrubber with its internal pipes.
144SF melter and receiver steam jacket and its coil
145Dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter
146Dismantling, fabrication, erection of save all at spare body of quad
147Dismantling of Condensate pit
148Dismantling, fabrication and erection of top and shell of Quad body
149Dismantling, fabrication and erection of Wt. juice tank
150Dismantling, fabrication and erection of Maceration water tank
151Dismantling, fabrication and erection of feed water tank
152Dismantling, fabrication and erection of wet scrubber
153Dismantling, fabrication and erection of boiler furnace

AI Tender Summary

OUR REF NO 31579557
AUTHORITY Cooperative
TENDER VALUE Ref. Documents
LAST DATE 01-04-2022
Authority
Authority Name Meham Cooperative Sugar Mills Limited
Work Description Fabrication Jobs - 2 Pipelines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 3 Pipelines [ M.S. / G.I. ] Erection Up To 2 Dia. 4 Pipelines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 5 Dismantling, Cleaning, Burning & Refitting Of Existing Pipe Lines Of All Sizes ( For Cleaning & Modification Purposes ) 6 M.S Pipe Line Above 12 Dia. Dismantling 7 M.S Pipe Line Above 12 Dia. Fabrication 8 M.S Pipe Line Above 12 Dia. Erection 9 Dismantling Of Flanges / Blind For Reuse 10 Refitting Of Old Flanges / Blind [ Reuse ] New 11 Fabrication Of Flanges / Blind From M. S. Plate 12 Valves Dismantling & Fitting Up To 6 Size 13 Valves Dismantling & Fittingfrom 7 To 12 Size 14 Valves Dismantling & Fitting Above 12 Size 15 Dismantling & Fittingof Ms Fabricated Right Angle / Globe Valve Of Size More Than 12 Size 16 Dismantling & Fitting Of C.I. Pipe &Accessories 17 Dismantling& Fitting Of S.S.Pipe & Accessories. 18 Dismantling Of Ms Bend, Tee, Nipple, Reducer Above 12 19 Fabrication Of Ms Bend, Tee, Nipple, Reducer Above 12 20 Erection Of Ms Bend, Tee, Nipple, Reducer Above 12 21 Dismantling, Fab. & Erection Of M.S. / S.S. Pipe Accessories ( Tee, Cone, Cross, Distance Piece, Nipple, Reducer, Bend ) 22 Dismantling, Fab. & Erection Of M.S. Plate Jobs ( Tanks, Gutters, Chutes Pipe Rolling, Boiler Ducting Etc. ) 23 Dis. / Fab. / Erection Of Internal Structure Of Wet Scrubber. 24 Dismantling Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 25 Fabrication Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 26 Erection Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 27 Repairing Of Old Platform Dismantling, Fab.&Erection 28 Dismantling, Fab.& Erectionof Railing 29 Patch Work Upto 4 Sq. Ft. Max. 30 Patch Work Above 4 Sq. Ft. Welding Work ( Two Round ) 31 Fabrication And Erection Of Condensate Pit. 32 Dismantling, Fabrication And Erection Of Molasses Conditional With Coil And Drive System. 33 Strengthening Of Quad Body No. 3 And No. 4. 34 Dismantling, Fabrication And Erection Of Hopper. 35 Dismantling, Fabrication And Erection Of Hopper. 36 Dismantling, Erection And Commissioning Of Pan Condenser 37 Dismantling And Erection Of Air Compressor’S Tank 38 Repairing Of Id Fan For Boiler Side. 39 Dismantling, Fabrication & Erection Of Bagacillopipe From Bagacillo To Vacuum Filter 40 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Semi-Kestnner, Juice Heaters ) 41 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Vapour Cell & Evaporator Bodies ) 42 Dismantling, Fitting & Hydraulic Testing Of S.S / Brass Tubes ( Pans ) 43 Dismantling, Fabrication & Erection Of Pan And Quad Down Take 44 Dismantling, Fab. & Erection Of Pan And Quad Calanderia Jacket. 45 Dismantling Of Up To 4 Pump & 15 Hp Motor. 46 Erection Of Up To 4 Pump & 15 Hp Motor. 47 Dismantling Of 4” To 8” Pump & 15 To 40 H.P.Motor 48 Erection Of 4” To 8” Pump & 15 To 40 H.P.Motor 49 Dismantling Of Above 8” Pump & Above 40 H.P.Motor 50 Erection Of Above 8” Pump & Above 40 H.P.Motor 51 Dismantlingof G.I. / A.C.C. Sheet 52 Fitting ( Erection ) Of G.I. / A.C.C. Sheet 53 Dismantling Of Water Gutter & Ridge 54 Erection Of Water Gutter & Ridge 55 Dismantling, Fabrication, Erection Of Sulphur Furnace Complete 56 Dismantling, Fab. & Erection Of The Melter / Receiver Of Sulphur Furnace. 57 Dismantling, Fabrication & Erectionof Shell Of Sulphur Furnace 58 Dismantling, Fabrication & Erectionof Scrubber Of Sulphur Furnace 59 Dismantling , Fabrication & Erectionof Steam Jacket Of Sulphur Furnace 60 Dismantling, Fabrication, Erection Of Sulphur Furnace Cooler 61 Dismantling, Fabrication & Erection Of The Bottom Portion Of Weight Juice Tank With Ms Plates 62 Dismantling, Fabrication & Erection Of The Scrappers Of Dorr Clarifier With Ms Plates 63 Dismantling, Fabrication & Erection Of The Catcher Bottle Of Vac. Filter With Ms Plates 64 Dismantling, Fabrication & Erection Of The Bottom Of Dorr Clarifier With Ms Plates 65 Dismantling, Fabrication & Erection Of The Mud Tray Of Vac. Filter With Ms Plates 66 Dismantling, Fabrication & Erection Of The Mud Tank Bottom Of Vac. Filter With Ms Plates 67 Dismantling, Fabrication & Erection Of The Conical Portion Of Juice / Water / Mud Tank With Ms Plates 68 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Pans 69 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Pan Tops 70 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Saveall 71 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Vac. Crystallizer 72 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Bottom Plates Of Syrup & Molasses Tanks & Conditioners 73 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Side Plates Of Syrup & Molasses Tanks & Conditioners 74 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Pan Shell Strengthening Work With Ms Channels / Angles / Ms Plate Rings 75 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Top Cone Strengthening Work With Ms Channels / Angles / Ms Plate Rings 76 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Strengthening Of Vapour Line By Inner Side Supporting Of Angles / Pipes 77 Dismantling, Fab. & Erection Of Coils Of Horizontal Crystallizers 78 Dismantling Of Shaft Of Crystallizers 79 Fabrication Of Shaft Of Crystallizers 80 Erectionof Shaft Of Crystallizers 81 Replacement Of 3” Ms Coils ( Including Bends, Flange, Etc. ) Of Vertical Crystallizers 82 Dismantling, Fab. & Erection Of Arms Of A- Crystallizers 83 Replacement Of Coils Of Dorr & Evaporator Bodies - Juice Coils ( Dismantling, Fab. & Erection ) 84 Replacement Of Coils Of Dorr & Evaporator Bodies - Ammonia & Gas Coils ( Dismantling, Fab. & Erection ) 85 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Bottom Plates 86 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Side Plates Upto Height 10Mtr 87 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Top Cone Plates With Supports 88 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Cooling Coils 89 Dismantling, Fabrication, Erection Of Ms Pipe Coil Fitting At Various Station 90 Fabrication Of Drum Internal Plates Of Boiler 91 Dismantling, Fabrication And Erection Of Expansion Joints Of Boiler 92 Dismantling Of Existing Transient Heaters 93 Shifting Of New Transient Heater At Site 94 Erection Of New / Existing Transient Heaters 95 Dismantling / Fab. / Erection Of Weak Portion Of Partition Plates Ofjuice Heaters 96 Dis. / Repairing / Fabrication & Erection Of Bagasse Belt Conveyor On Turnkey Basis 97 Dismantlingofspurgar Of Juice Sulphitor For Cleaning 98 Fabricationofspurgar Of Juice Sulphitor For Cleaning 99 Erection / Refitting.Ofspurgar Of Juice Sulphitor For Cleaning 100 Dis, Fab & Erection Of Stainer Of Injection Pump / Spray Pump 101 Injection Channel Jail Dismantling, Fab. & Erection. 102 Repairing Of Agitator Of Vaccum Filter Dismantling, Fab. & Erection. 103 Fabrication Of Sweeper Trolly 104 Repairing / Changing Of Vertical Crystallizer Arms In Top Gutter ( Scrapper Type ) Round Shape 105 Etp Middle Shaft Repairing / Replacement 106 Fab Of New Lime Tank With Its Shaft, Stirer Etc. At Etp 107 Dismantling, Fab & Erection Of Save All Ofevaporator Bodies 108 Replacement Of Juice Sulphiter Top 109 Dismantling Of Vibro Screen 110 Fabriaction Of Vibro Screen 111 Erection Of Vibro Screen 112 Repairing / Replacement Of Shell Of Sugar Melter 113 Replacement Of Shaft Of Sugar Melter 114 Replacemnet Of Arm Of Sugar Melter 115 Stair Case ( With Chequared Plate ) - Dismentling 116 Stair Case ( With Chequared Plate ) - Fabrication 117 Stair Case ( With Chequared Plate ) - Erection 118 Juice Heater Cover Dismantling, Fab. & Erection 119 Juice Heater Refitting With Testingby Pump. 120 Sight Glass Fitting In Condensate Bottle Of Seed & Juice Heaters / Any Vessel, By Welding The Sight Glass. 121 Dismantling, Fabrication, Erection Of Stainer Of Injection And Spray Pump 122 Stair Case At Sugar Bin Fabrication & Erection. 123 Vaccum Crystallizer Shell Fabrication, Erection& Patch. 124 New Planatory Gear Boxes For B Massecuite Crystallizer. 125 F.D. Old Impeller Is To Be Removed And New Is To Be Fitted And Trial. 126 Straightening Of Old Pipe Line Of Thickness 6-8Mm Into Plain Sheet By Rolling Machine 127 Pan No. 4 Mechanical Circulator Is To Be Dismantled And Parts To Be Shifted To W 128 Pan No. 4 Mechanical Circulagtoris To Be Dismantled And Parts To Be Shifted To Workshop For Machining.After Machining The Same Circulator Parts To Be Fitted And Trial. 129 Pan / Quad Condenser Tail Pipe Double Support Is To Be Provided With Atleast L 3” / Pipe 2.1 / 2” With Clamp System. 130 Rori Melter Is To Be Fabricated And Erected As Per Drg. 131 Replacement Of Id Fan Ducting & Casing. 132 Ss Condenser Repairing By Support To Be Given By Rings 133 Clear Juice Filter Arrangement By Jali Fitting - Dismantling, Fabrication, Erection 134 Dismantling, Fabrication, Erection Of Strengthening Of Factory Column, Structure, Channel, Beam Etc. 135 Juice Heater Header Partition Plate Top & Bottom Both Side - Dismantling, Fabrication, Erection 136 Oliver Filter Tray Dismantling, Fabrication, Erection 137 Centrifugal Machine Strengthening Dismantling, Fabrication & Fitting From Channel, Beam 138 Dismantling, Erection Of Ss Tail Pipe At Pan & Quad Condenser 139 Dismantling, Fabrication, Erection Tail Pipe Support Angle Channel 140 Dismantling, Fabrication, Erectionof Complete Pug Mill For Continuous Machine B- Massecuite. 141 Repairing Of Bottom Portion Of Hot Water Tank Replacement 142 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 2, Complete Scrubber With Its Internal Pipes. 143 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 3 ( Lime Side ) Complete Scrubber With Its Internal Pipes. 144 Sf Melter And Receiver Steam Jacket And Its Coil 145 Dismantling, Fabrication, Erection Of So2 Gas Coil / Pipe At Syrup Sulphiter 146 Dismantling, Fabrication, Erection Of Save All At Spare Body Of Quad 147 Dismantling Of Condensate Pit 148 Dismantling, Fabrication And Erection Of Top And Shell Of Quad Body 149 Dismantling, Fabrication And Erection Of Wt. Juice Tank 150 Dismantling, Fabrication And Erection Of Maceration Water Tank 151 Dismantling, Fabrication And Erection Of Feed Water Tank 152 Dismantling, Fabrication And Erection Of Wet Scrubber 153 Dismantling, Fabrication And Erection Of Boiler Furnace
Basic Detail
Tender No MSM/Pur./2022/212
Bidding Type Tender
Location
City Rohtak
State Haryana
Key Dates
Publish Date 23 Mar 2022
Submission Date 01 Apr 2022
Open Date 02 Apr 2022
Finance
Tender Value Ref. Documents
Tender Fee 100
EMD Ref. Documents
Exemption Not Available
Document List
Tendernotice_1.pdf
BOQ_281110.xls
4084026d-3b96-45f6-b9a0-a2f1e4e6015e.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 23, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 01, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 02, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

xls

BOQ_281110.xls

html

4084026d-3b96-45f6-b9a0-a2f1e4e6015e.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders