Fabrication Jobs - 2 Pipelines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 3 Pipelines [ M.S. / G.I. ] Erection Up To 2 Dia. 4 Pipelines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 5 Dismantling, Cleaning,
Tender Overview
Project Description
Fabrication Jobs - 2 Pipelines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 3 Pipelines [ M.S. / G.I. ] Erection Up To 2 Dia. 4 Pipelines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 5 Dismantling, Cleaning, Burning & Refitting Of Existing Pipe Lines Of All Sizes ( For Cleaning & Modification Purposes ) 6 M.S Pipe Line Above 12 Dia. Dismantling 7 M.S Pipe Line Above 12 Dia. Fabrication 8 M.S Pipe Line Above 12 Dia. Erection 9 Dismantling Of Flanges / Blind For Reuse 10 Refitting Of Old Flanges / Blind [ Reuse ] New 11 Fabrication Of Flanges / Blind From M. S. Plate 12 Valves Dismantling & Fitting Up To 6 Size 13 Valves Dismantling & Fittingfrom 7 To 12 Size 14 Valves Dismantling & Fitting Above 12 Size 15 Dismantling & Fittingof Ms Fabricated Right Angle / Globe Valve Of Size More Than 12 Size 16 Dismantling & Fitting Of C.I. Pipe &Accessories 17 Dismantling& Fitting Of S.S.Pipe & Accessories. 18 Dismantling Of Ms Bend, Tee, Nipple, Reducer Above 12 19 Fabrication Of Ms Bend, Tee, Nipple, Reducer Above 12 20 Erection Of Ms Bend, Tee, Nipple, Reducer Above 12 21 Dismantling, Fab. & Erection Of M.S. / S.S. Pipe Accessories ( Tee, Cone, Cross, Distance Piece, Nipple, Reducer, Bend ) 22 Dismantling, Fab. & Erection Of M.S. Plate Jobs ( Tanks, Gutters, Chutes Pipe Rolling, Boiler Ducting Etc. ) 23 Dis. / Fab. / Erection Of Internal Structure Of Wet Scrubber. 24 Dismantling Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 25 Fabrication Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 26 Erection Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 27 Repairing Of Old Platform Dismantling, Fab.&Erection 28 Dismantling, Fab.& Erectionof Railing 29 Patch Work Upto 4 Sq. Ft. Max. 30 Patch Work Above 4 Sq. Ft. Welding Work ( Two Round ) 31 Fabrication And Erection Of Condensate Pit. 32 Dismantling, Fabrication And Erection Of Molasses Conditional With Coil And Drive System. 33 Strengthening Of Quad Body No. 3 And No. 4. 34 Dismantling, Fabrication And Erection Of Hopper. 35 Dismantling, Fabrication And Erection Of Hopper. 36 Dismantling, Erection And Commissioning Of Pan Condenser 37 Dismantling And Erection Of Air Compressor’S Tank 38 Repairing Of Id Fan For Boiler Side. 39 Dismantling, Fabrication & Erection Of Bagacillopipe From Bagacillo To Vacuum Filter 40 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Semi-Kestnner, Juice Heaters ) 41 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Vapour Cell & Evaporator Bodies ) 42 Dismantling, Fitting & Hydraulic Testing Of S.S / Brass Tubes ( Pans ) 43 Dismantling, Fabrication & Erection Of Pan And Quad Down Take 44 Dismantling, Fab. & Erection Of Pan And Quad Calanderia Jacket. 45 Dismantling Of Up To 4 Pump & 15 Hp Motor. 46 Erection Of Up To 4 Pump & 15 Hp Motor. 47 Dismantling Of 4” To 8” Pump & 15 To 40 H.P.Motor 48 Erection Of 4” To 8” Pump & 15 To 40 H.P.Motor 49 Dismantling Of Above 8” Pump & Above 40 H.P.Motor 50 Erection Of Above 8” Pump & Above 40 H.P.Motor 51 Dismantlingof G.I. / A.C.C. Sheet 52 Fitting ( Erection ) Of G.I. / A.C.C. Sheet 53 Dismantling Of Water Gutter & Ridge 54 Erection Of Water Gutter & Ridge 55 Dismantling, Fabrication, Erection Of Sulphur Furnace Complete 56 Dismantling, Fab. & Erection Of The Melter / Receiver Of Sulphur Furnace. 57 Dismantling, Fabrication & Erectionof Shell Of Sulphur Furnace 58 Dismantling, Fabrication & Erectionof Scrubber Of Sulphur Furnace 59 Dismantling , Fabrication & Erectionof Steam Jacket Of Sulphur Furnace 60 Dismantling, Fabrication, Erection Of Sulphur Furnace Cooler 61 Dismantling, Fabrication & Erection Of The Bottom Portion Of Weight Juice Tank With Ms Plates 62 Dismantling, Fabrication & Erection Of The Scrappers Of Dorr Clarifier With Ms Plates 63 Dismantling, Fabrication & Erection Of The Catcher Bottle Of Vac. Filter With Ms Plates 64 Dismantling, Fabrication & Erection Of The Bottom Of Dorr Clarifier With Ms Plates 65 Dismantling, Fabrication & Erection Of The Mud Tray Of Vac. Filter With Ms Plates 66 Dismantling, Fabrication & Erection Of The Mud Tank Bottom Of Vac. Filter With Ms Plates 67 Dismantling, Fabrication & Erection Of The Conical Portion Of Juice / Water / Mud Tank With Ms Plates 68 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Pans 69 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Pan Tops 70 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Saveall 71 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Vac. Crystallizer 72 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Bottom Plates Of Syrup & Molasses Tanks & Conditioners 73 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Side Plates Of Syrup & Molasses Tanks & Conditioners 74 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Pan Shell Strengthening Work With Ms Channels / Angles / Ms Plate Rings 75 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Top Cone Strengthening Work With Ms Channels / Angles / Ms Plate Rings 76 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Strengthening Of Vapour Line By Inner Side Supporting Of Angles / Pipes 77 Dismantling, Fab. & Erection Of Coils Of Horizontal Crystallizers 78 Dismantling Of Shaft Of Crystallizers 79 Fabrication Of Shaft Of Crystallizers 80 Erectionof Shaft Of Crystallizers 81 Replacement Of 3” Ms Coils ( Including Bends, Flange, Etc. ) Of Vertical Crystallizers 82 Dismantling, Fab. & Erection Of Arms Of A- Crystallizers 83 Replacement Of Coils Of Dorr & Evaporator Bodies - Juice Coils ( Dismantling, Fab. & Erection ) 84 Replacement Of Coils Of Dorr & Evaporator Bodies - Ammonia & Gas Coils ( Dismantling, Fab. & Erection ) 85 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Bottom Plates 86 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Side Plates Upto Height 10Mtr 87 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Top Cone Plates With Supports 88 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Cooling Coils 89 Dismantling, Fabrication, Erection Of Ms Pipe Coil Fitting At Various Station 90 Fabrication Of Drum Internal Plates Of Boiler 91 Dismantling, Fabrication And Erection Of Expansion Joints Of Boiler 92 Dismantling Of Existing Transient Heaters 93 Shifting Of New Transient Heater At Site 94 Erection Of New / Existing Transient Heaters 95 Dismantling / Fab. / Erection Of Weak Portion Of Partition Plates Ofjuice Heaters 96 Dis. / Repairing / Fabrication & Erection Of Bagasse Belt Conveyor On Turnkey Basis 97 Dismantlingofspurgar Of Juice Sulphitor For Cleaning 98 Fabricationofspurgar Of Juice Sulphitor For Cleaning 99 Erection / Refitting.Ofspurgar Of Juice Sulphitor For Cleaning 100 Dis, Fab & Erection Of Stainer Of Injection Pump / Spray Pump 101 Injection Channel Jail Dismantling, Fab. & Erection. 102 Repairing Of Agitator Of Vaccum Filter Dismantling, Fab. & Erection. 103 Fabrication Of Sweeper Trolly 104 Repairing / Changing Of Vertical Crystallizer Arms In Top Gutter ( Scrapper Type ) Round Shape 105 Etp Middle Shaft Repairing / Replacement 106 Fab Of New Lime Tank With Its Shaft, Stirer Etc. At Etp 107 Dismantling, Fab & Erection Of Save All Ofevaporator Bodies 108 Replacement Of Juice Sulphiter Top 109 Dismantling Of Vibro Screen 110 Fabriaction Of Vibro Screen 111 Erection Of Vibro Screen 112 Repairing / Replacement Of Shell Of Sugar Melter 113 Replacement Of Shaft Of Sugar Melter 114 Replacemnet Of Arm Of Sugar Melter 115 Stair Case ( With Chequared Plate ) - Dismentling 116 Stair Case ( With Chequared Plate ) - Fabrication 117 Stair Case ( With Chequared Plate ) - Erection 118 Juice Heater Cover Dismantling, Fab. & Erection 119 Juice Heater Refitting With Testingby Pump. 120 Sight Glass Fitting In Condensate Bottle Of Seed & Juice Heaters / Any Vessel, By Welding The Sight Glass. 121 Dismantling, Fabrication, Erection Of Stainer Of Injection And Spray Pump 122 Stair Case At Sugar Bin Fabrication & Erection. 123 Vaccum Crystallizer Shell Fabrication, Erection& Patch. 124 New Planatory Gear Boxes For B Massecuite Crystallizer. 125 F.D. Old Impeller Is To Be Removed And New Is To Be Fitted And Trial. 126 Straightening Of Old Pipe Line Of Thickness 6-8Mm Into Plain Sheet By Rolling Machine 127 Pan No. 4 Mechanical Circulator Is To Be Dismantled And Parts To Be Shifted To W 128 Pan No. 4 Mechanical Circulagtoris To Be Dismantled And Parts To Be Shifted To Workshop For Machining.After Machining The Same Circulator Parts To Be Fitted And Trial. 129 Pan / Quad Condenser Tail Pipe Double Support Is To Be Provided With Atleast L 3” / Pipe 2.1 / 2” With Clamp System. 130 Rori Melter Is To Be Fabricated And Erected As Per Drg. 131 Replacement Of Id Fan Ducting & Casing. 132 Ss Condenser Repairing By Support To Be Given By Rings 133 Clear Juice Filter Arrangement By Jali Fitting - Dismantling, Fabrication, Erection 134 Dismantling, Fabrication, Erection Of Strengthening Of Factory Column, Structure, Channel, Beam Etc. 135 Juice Heater Header Partition Plate Top & Bottom Both Side - Dismantling, Fabrication, Erection 136 Oliver Filter Tray Dismantling, Fabrication, Erection 137 Centrifugal Machine Strengthening Dismantling, Fabrication & Fitting From Channel, Beam 138 Dismantling, Erection Of Ss Tail Pipe At Pan & Quad Condenser 139 Dismantling, Fabrication, Erection Tail Pipe Support Angle Channel 140 Dismantling, Fabrication, Erectionof Complete Pug Mill For Continuous Machine B- Massecuite. 141 Repairing Of Bottom Portion Of Hot Water Tank Replacement 142 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 2, Complete Scrubber With Its Internal Pipes. 143 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 3 ( Lime Side ) Complete Scrubber With Its Internal Pipes. 144 Sf Melter And Receiver Steam Jacket And Its Coil 145 Dismantling, Fabrication, Erection Of So2 Gas Coil / Pipe At Syrup Sulphiter 146 Dismantling, Fabrication, Erection Of Save All At Spare Body Of Quad 147 Dismantling Of Condensate Pit 148 Dismantling, Fabrication And Erection Of Top And Shell Of Quad Body 149 Dismantling, Fabrication And Erection Of Wt. Juice Tank 150 Dismantling, Fabrication And Erection Of Maceration Water Tank 151 Dismantling, Fabrication And Erection Of Feed Water Tank 152 Dismantling, Fabrication And Erection Of Wet Scrubber 153 Dismantling, Fabrication And Erection Of Boiler Furnace
BOQ
| Sl. No. | Item Description |
| 1 | Fabrication jobs |
| 2 | PIPELINES [M.S./ G.I.] Dismantling up to12\"\" including bends, reducers, flanges etc. |
| 3 | PIPELINES [M.S./ G.I.] Erection up to 2\" dia. |
| 4 | PIPELINES [M.S./ G.I.]- do- above 2\" to 12\" dia. |
| 5 | Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) |
| 6 | M.S Pipe line above 12\" dia. Dismantling |
| 7 | M.S Pipe line above 12\" dia. Fabrication |
| 8 | M.S Pipe line above 12\" dia. Erection |
| 9 | Dismantling of flanges/ Blind for reuse |
| 10 | Refitting of old flanges/Blind[reuse] new |
| 11 | Fabrication of flanges/Blind from M. S. Plate |
| 12 | Valves Dismantling & fitting up to 6\" Size |
| 13 | Valves Dismantling & fittingfrom 7\" to 12\"\" Size |
| 14 | Valves Dismantling & fitting above 12\" Size |
| 15 | Dismantling & fittingof MS fabricated right angle/ globe valve of size more than 12\" size |
| 16 | Dismantling & fitting of C.I. pipe &accessories |
| 17 | Dismantling& fitting of S.S.Pipe & accessories. |
| 18 | Dismantling of MS bend, Tee, nipple, reducer above 12\" |
| 19 | Fabrication of MS bend, tee, nipple, reducer above 12\" |
| 20 | Erection of MS bend, tee, nipple, reducer above 12\" |
| 21 | Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) |
| 22 | Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) |
| 23 | Dis./fab./erection of internal structure of wet scrubber. |
| 24 | Dismantling of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 25 | Fabrication of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 26 | Erection of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) |
| 27 | Repairing of old platform dismantling,fab.&erection |
| 28 | Dismantling, fab.& Erectionof railing |
| 29 | Patch work upto 4 sq. ft. max. |
| 30 | Patch work above 4 sq. ft. Welding work ( Two round ) |
| 31 | Fabrication and erection of condensate pit. |
| 32 | Dismantling, Fabrication and erection of Molasses conditional with coil and drive system. |
| 33 | Strengthening of Quad Body No. 3 and No. 4. |
| 34 | Dismantling, Fabrication and erection of Hopper. |
| 35 | Dismantling, Fabrication and erection of Hopper. |
| 36 | Dismantling, erection and commissioning of Pan Condenser |
| 37 | Dismantling and erection of Air compressor’s Tank |
| 38 | Repairing of ID fan for Boiler Side. |
| 39 | Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter |
| 40 | Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) |
| 41 | Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) |
| 42 | Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) |
| 43 | Dismantling, fabrication & erection of Pan and quad down take |
| 44 | Dismantling, fab. & erection of Pan and Quad calanderia jacket. |
| 45 | Dismantling of up to 4 \" pump & 15 HP motor. |
| 46 | Erection of up to 4 \" pump & 15 HP motor. |
| 47 | Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor |
| 48 | Erection of 4” to 8” pump & 15 to 40 H.P.Motor |
| 49 | Dismantling of above 8” pump & above 40 H.P.Motor |
| 50 | Erection of above 8” pump & above 40 H.P.Motor |
| 51 | Dismantlingof G.I./ A.C.C. Sheet |
| 52 | Fitting (Erection) of G.I./ A.C.C. Sheet |
| 53 | Dismantling of water gutter & ridge |
| 54 | Erection of water gutter & ridge |
| 55 | Dismantling, fabrication, erection of Sulphur furnace complete |
| 56 | Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace. |
| 57 | Dismantling, fabrication & erectionof Shell of Sulphur furnace |
| 58 | Dismantling, fabrication & erectionof scrubber of sulphur furnace |
| 59 | Dismantling , fabrication & erectionof steam jacket of sulphur furnace |
| 60 | Dismantling, fabrication, erection of Sulphur furnace cooler |
| 61 | Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates |
| 62 | Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates |
| 63 | Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates |
| 64 | Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates |
| 65 | Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates |
| 66 | Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates |
| 67 | Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates |
| 68 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans |
| 69 | Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops |
| 70 | Dismantling, Fabrication & erection of MS plates of Pan station - Saveall |
| 71 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer |
| 72 | Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners |
| 73 | Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners |
| 74 | Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings |
| 75 | Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings |
| 76 | Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes |
| 77 | Dismantling, fab. & erection of coils of horizontal crystallizers |
| 78 | Dismantling of shaft of crystallizers |
| 79 | Fabrication of shaft of crystallizers |
| 80 | Erectionof shaft of crystallizers |
| 81 | Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers |
| 82 | Dismantling, fab. & erection of arms of A- crystallizers |
| 83 | Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) |
| 84 | Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) |
| 85 | Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates |
| 86 | Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr |
| 87 | Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports |
| 88 | Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils |
| 89 | Dismantling, fabrication, erection of MS pipe coil fitting at various station |
| 90 | Fabrication of Drum internal plates of boiler |
| 91 | Dismantling, fabrication and erection of expansion joints of boiler |
| 92 | Dismantling of Existing transient Heaters |
| 93 | Shifting of new transient heater at Site |
| 94 | Erection of new/ existing transient heaters |
| 95 | Dismantling/ Fab./ Erection of weak portion of partition plates ofjuice heaters |
| 96 | Dis./ Repairing/ Fabrication & erection of Bagasse belt conveyor on turnkey basis |
| 97 | Dismantlingofspurgar of juice sulphitor for cleaning |
| 98 | Fabricationofspurgar of juice sulphitor for cleaning |
| 99 | Erection/refitting.ofspurgar of juice sulphitor for cleaning |
| 100 | Dis, fab & erection of stainer of injection pump/spray pump |
| 101 | Injection channel jail dismantling, fab. & erection. |
| 102 | Repairing of agitator of vaccum filter dismantling, fab. & erection. |
| 103 | Fabrication of sweeper trolly |
| 104 | Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape |
| 105 | ETP middle shaft repairing/ replacement |
| 106 | Fab of new lime tank with its shaft, stirer etc. at ETP |
| 107 | Dismantling, fab & erection of save all ofevaporator bodies |
| 108 | Replacement of juice sulphiter top |
| 109 | Dismantling of vibro screen |
| 110 | Fabriaction of vibro screen |
| 111 | Erection of vibro screen |
| 112 | Repairing/ replacement of shell of sugar melter |
| 113 | Replacement of shaft of sugar melter |
| 114 | Replacemnet of arm of sugar melter |
| 115 | Stair case ( With chequared plate) - Dismentling |
| 116 | Stair case ( With chequared plate) - Fabrication |
| 117 | Stair case ( With chequared plate) - Erection |
| 118 | Juice heater cover dismantling, fab. & erection |
| 119 | Juice heater Refitting with testingby pump. |
| 120 | Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. |
| 121 | dismantling, fabrication, erection of stainer of injection and spray pump |
| 122 | Stair case at sugar bin fabrication & erection. |
| 123 | Vaccum crystallizer shell fabrication,erection& patch. |
| 124 | New planatory gear boxes for B massecuite crystallizer. |
| 125 | F.D. old impeller is to be removed and new is to be fitted and trial. |
| 126 | Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine |
| 127 | Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W |
| 128 | Pan No. 4 mechanical circulagtoris to be dismantled and parts to be shifted to Workshop for machining.After machining the same circulator parts to be fitted and trial. |
| 129 | Pan/quad condenser tail pipe double support is to be provided with atleast L 3”/pipe 2.1/2” with clamp system. |
| 130 | Rori melter is to be fabricated and erected as per drg. |
| 131 | Replacement of ID fan ducting & casing. |
| 132 | SS condenser repairing by support to be given by rings |
| 133 | Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection |
| 134 | Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. |
| 135 | Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection |
| 136 | Oliver filter tray dismantling, fabrication, erection |
| 137 | Centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam |
| 138 | Dismantling, erection of SS tail pipe at pan & quad condenser |
| 139 | Dismantling, fabrication, erection tail pipe support angle channel |
| 140 | Dismantling, fabrication, erectionof complete Pug Mill for continuous machine B- massecuite. |
| 141 | Repairing of bottom portion of hot water tank replacement |
| 142 | Dismantling, fabrication, erection of Sulphur furnace no. 2, complete scrubber with its internal pipes. |
| 143 | Dismantling, fabrication, erection of Sulphur furnace no. 3 (Lime side) complete scrubber with its internal pipes. |
| 144 | SF melter and receiver steam jacket and its coil |
| 145 | Dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter |
| 146 | Dismantling, fabrication, erection of save all at spare body of quad |
| 147 | Dismantling of Condensate pit |
| 148 | Dismantling, fabrication and erection of top and shell of Quad body |
| 149 | Dismantling, fabrication and erection of Wt. juice tank |
| 150 | Dismantling, fabrication and erection of Maceration water tank |
| 151 | Dismantling, fabrication and erection of feed water tank |
| 152 | Dismantling, fabrication and erection of wet scrubber |
| 153 | Dismantling, fabrication and erection of boiler furnace |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender