Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy Solid Waste In Ariyamangalam Compost Yard At Tiruchirappalli City Corporation Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy, tiruchirappalli-Tamil Nadu

Municipal Corporation-MC has published Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy Solid Waste In Ariyamangalam Compost Yard At Tiruchirappalli City Corporation Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy. Submission Date for this Tender is 18-04-2022. Agricultural Watering Equipment Tenders in tiruchirappalli Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

31505845
Corrigendum : Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy Solid Waste In Ariyamangalam Compost Yard At Tiruchirappalli City Corporation Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy
Open Tender
Indian
Tamil Nadu
tiruchirappalli
18-04-2022

Tender Details

Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy Solid Waste In Ariyamangalam Compost Yard At Tiruchirappalli City Corporation Implementation Of Bio-Remediation ( Phase-Ii ) Process For Disposal Of Existing Legacy Solid Waste In Ariyamangalam Compost Yard At Tiruchirappalli City Corporation

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 13-Apr-2022 Addendum/ Corrigendum to the bid document Technical Bid 18-04-2022

Key Value

Document Fees
Refer document
EMD
INR 2540000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: IMPLEMENTATION OF BIO-REMEDIATION (PHASE-II) PROCESS FOR DISPOSAL OF EXISTING LEGACY SOLID WASTE IN ARIYAMANGALAM COMPOST YARD AT TIRUCHIRAPPALLI CITY CORPORATION
Sl. No. Item Description
1Reclamation of exiting dumpsite through Bio-Remediation processby Eacavating the existing mixed compacted garbage which underwent biological degradation in the land portion earmarked by the ULB and loosening the garbage, sparying consortium of micro organism to sanitize and stabilize the loosened material and heaping them for stabilization Controlling of mal odour by spraying of suitable microbial inoculums, sieving them after stabilization by using Mechanical sieving machine or any other equipment at the cost of Bidder. Adopting eco friendly and nonpolluting process in order to reduce the impact of dumping site in the adjacent areas.Further segregating the excavated garbage into as many kinds and categories as possible at the cost of Bidder including cost of Bidder’s risk and cost, for sieving, the excavated garbage, storing the segregated materials (contd..) Deployment of necessary manpower, materials, equipment’s, tool and construction of plants and sheds and creation of facilities for handling, separating, segregating and storing for the operation of the plant. Leveling the earth surface by bull-dozer or any other earth moving equipment. Providing security arrangement for the plant project site, machineries, equipment etc. at the cost of the Bidder. Completing the work within the contract period a directed by the Departmental Officers. The entire segregated materials shall be properly sold/disposed within Sixty days. The bidder should maintain the ambient air quality within the standard prescribed and the activities should not attract any public complaints.( Excluding GST)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail