Tp1-61 / 2021-22 Providing Compound Wall, Cutting, Levelling The Yard Area, Filling With Quarry Dust And Spreading Of 20Mm Hbg Metal For Yard Area At Avadi
Tender Overview
Project Description
Tp1-61 / 2021-22 Providing Compound Wall, Cutting, Levelling The Yard Area, Filling With Quarry Dust And Spreading Of 20Mm Hbg Metal For Yard Area At Avadi
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Mar-2022 | change of closing date | Date | 31-Mar-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Clearing of juliflora jungle including cost of all labour, lead, lift etc. complete. |
| 2 | Earth work excavationfor cuting and leveling the site in ordinary soil with initial of lead of 10m and lift of 2m etc., complete.As department enigineer at site |
| 3 | Dismantling of RCC for existing TNEB Employee Quarters and removal of all debries away from the site including cost of all T&P, materials ,labours lead lift etc. Complete |
| 4 | Dismantling of existing Brick work in CM 1:5 for existing TNEB Employee Quarters and removal of all debries away from the site including cost of all materials ,labours lead lift etc. complete |
| 5 | Dismantling of RCC Roof Slab 130mm Thick for existing TNEB Employee Quarters including removal of all debries away from the site including cost of all materials ,labours, lead lift etc. Complete |
| 6 | Dismantling of Pressed tile & weathering course for existing TNEB Employee Quarters away from site including cost of all materials ,labours lead lift etc. Complete |
| 7 | Dismantling of Door and Window icluding removal of frames, hinges, and fastenings, etc., devoluted from site to store including cost of all materials ,labours lead lift etc. Complete |
| 8 | Dismantling the existing barbedfencing and stacked at control room including cost of all tools and plants, hiring of gas cutter etc., complete As department enigineer at site |
| 9 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard shift clay, shales, Murram including cost of all materials, lead, lift etc., complete.As department enigineer at site |
| 10 | Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etccomplete. As department enigineer at site |
| 11 | Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.As department enigineer at site |
| 12 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for concrete including cost of all materials, curing, labour, lead, lift etc.complete.As department enigineer at siteWithout form work |
| 13 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for concrete including cost of all materials, curing, labour, lead, lift etc.complete.As department enigineer at siteWith form work (cable duct wall & slab ) |
| 14 | Providing PCC1:2:4 using 12to 20mm HBG metal including cost of all materials, labour, lead, lift etc complete. (With Form work) |
| 15 | Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification. |
| 16 | Labour charges for back filling the excavated earth for foundation includingthe cost of all labours, lead, lift , etc., complete. |
| 17 | Removal ofsurplus earth from the site and putting into low lying area outside the yardincludingthe cost of all labours, lead, lift , etc., complete. |
| 18 | Supplying and erection of 5HP Mono block 3 phase electrical motor of approved brand with all relatedaccessories as per ISI in all respectincluding switch board with 3Nos, testlamp 3Nos, Fuse carrier 1No, 15AMPS, DPIC Switch with LNT make shorter with guard and providing, earthing to main with 8 Tinned cooper wire rod and 6ftlong 40mm dia, GI Pipefor earthing and earth pit filled with charcoal and salt as standard specification and laying motor bed by concrete with placing motor over bed labour charges for placing motor over bed including cost of all materials, labour, lead, lift etc., complete as per directed by the department at site. |
| 19 | Brick work in CM 1:5 (one cement & Five sand) using fly ash bricks of size 230x110x75mm including finishing , curing etc.,complete complying with standard specification |
| 20 | Plastering with c.m.1:3, 12 mm thick including cost of all materials, labour, lead, lift, etc complete. |
| 21 | Colour washing with two coats over a priming coatincluding cost of all materials with colour pegments, labour, lead, lift, etc complete |
| 22 | Supplying,fabricating and fixing in position of MS angle \"Y\" fence post with 50x50x6mm angle to fixing barbed wire fencing includding cost of all materials lead,lift labour charges for fixing in position,embedding in concrete cost of Redoxide,primer and two coats of approved enamel paint etc.,complete as directed by the Engineer at site. |
| 23 | Supply and providing barbed wire at Y angle in 6 rows horizantal and rolling curcile all round arrangements & barricading arrangement for 3rows supporting in casurinapolesincuding cost of labour, lead, lift etc., compelte |
| 24 | Providing electrification arrangement of Concealed wiring, pipe line , cable connection, Doom light fittings with necessary switch points including cost of all accessories, labour, lead, lift etc., complete as directed by department engineer at site. |
| 25 | Supplying and fabrication design of M.S Flat and Square rod, cutting, bending, welding, fixing and painting for Entrance Slidding gate including cost of all materials, labour, lead, lift etc., complete as directed by department engineer at site. |
| 26 | Supplying and fixing ofGI angle for cable duct including cost of all materials labour lead lift etc. complete. |
| 27 | Supplying and filling Quarry dust inside the yard area including cost of all materials labours, lead, lift etc., complete. |
| 28 | supplying and spreading 20mm HBG metalfor yard including cost of all materials labours, lead, lift etc., complete.As directed by the engineering incharge at site |
| 29 | Supplying and laying of PVC High density pipe including cuting, threading, Pasteting of Tee joint, Lbow, cost of all materials,labour,leadlift etc. complete.As directed by the engineer incharge at site. 25mm dia PVC Pipe |
| 30 | Supplying and laying of PVC High density pipe including cuting, threading, Pasteting of Tee joint, Lbow, cost of all materials,labour,leadlift etc. complete.As directed by the engineer incharge at site. 20mm dia PVC Pipe |
| 31 | Supply and fixing posing in 25mm dia gun metal wheel wall leader make of best quality including cost of all materials lead, lift, etc., complete .As directed by the engineer incharge at site. |
| 32 | Supply and fixing of 20mm dia PVC Dummy cap Providng holes incluing cuting, threading, Pasteting of Tee joint, Lbow, cost of all materials,labour,leadlift etc. complete.As directed by the engineer incharge at site. |
| 33 | Supplying and fixing black granite stone with golden Dot Engaraving the name of substation (Golden color) over entance wing wall in both Tamil and English and providing borders, colouring with Emulation paint etc., including cost of all materials, labour, lead, lift ect.,complete ( One side name board and other side Thiruvallur Picture) |
| 34 | Labour charges for paying out 3Nos Panther conductor including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, providing rollers, jointing wherever necessary, cost of labour lead, and lift etc. complete as per the instruction of departmental engineer at site |
| 35 | Transporting and paying out of 7/3.55mm GI Earth wire, including,all labour lead and lifts etc. complete |
| 36 | Transporting and hoisting of 90 kN Antifog suspension insulators of 7 units including cost of all labour, lead, lift etc. complete.(Under LC condition) |
| 37 | Transporting and hoisting of 120 kN Antifog single tension insulators of 8 units including cost of all labour, lead, lift etc. complete.(Under LC condition) |
| 38 | Labour charges for stringing of3 Nos. Panther conductor of single span including fixing dampers and jumpers etc complete.(Under LC condition) |
| 39 | Labour charges for stringing of 1 No. GI Earth wire of single span including labour, jumpering, with all lead, lift etc complete.(Under LC condition) |
| 40 | Lowering of HT/LT line during stringing of power conductor and re stringing to the original position after completion of stringing works. |
| 41 | Dismantling of existing oldtowers under LC condition and devoluted to stores including cost of all lead, lift, etc complete.(Under LC condition) |
| 42 | Dismantling of 120kN 8 units single tension insulatorsunder LC condition and devoluted to stores with all labour, lead, lift etc complete. |
| 43 | Dismantling of 90kN 7 units Suspension tension insulatorsunder LC condition and devoluted to stores with all labour, lead, lift etc complete. |
| 44 | Dismantling of 3 Nos. Panther conductors per kM under LC condition and devoluted to stores with all labour, lead, lift etc complete. |
| 45 | Dismantling of earth wire per kM under LC condition and devoluted to stores with all labour, lead, lift etc complete. |
| 46 | Supply of Tower parts |
| 47 | Supply of GI Bolt & Nuts |
| 48 | GST for bidders within TamilNadu |
| 49 | SGST |
| 50 | CGST |
| 51 | GST for bidders outside TamilNadu (IGST) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender