| 1 | Hiring of Pneumatic Compressor with operator and allied accessories for crushing of Cconcrete/hard crust for access to surface for excavation |
| 2 | Excavation of trench of average width 1 mtr & depth 1.5 mtr on hard crust/asphalt/pavement /soil and exposure of cable routes for fault detection |
| 3 | a) Installation of Feeder Pillar Box(CTC supply) with proper grouting and filling of space up to ground level: |
| 4 | i)Positive F.P.Box |
| 5 | ii)Negative F.P.Box |
| 6 | b)Extraction of Feeder Pillar Box from site and filling of space up to ground level: |
| 7 | i)Positive F.P.Box |
| 8 | ii)Negative F.P.Box |
| 9 | Negative bonding between F.P Box and all four rails by fixing of \"Z\" clamp(75x8)mm by welding including supply of required materials and machinery,including excavation and restoration of surface |
| 10 | Hiring of Electric Welding Machine with operator and allied accessories for welding as per requirement |
| 11 | Hiring of Gas cutting equipments with operator and allied accessories for gas cutting as per requirement |
| 12 | a)Erection of C.T.C Traction Pole at site including supply of materials(approved grade cement,medium sand and 5/8 chips in 1:2:4 ratio)CTC Pole and concrete biscuit supply |
| 13 | a)Erection of C.T.C Traction Pole at site including supply of materials(approved grade cement,medium sand and 5/8 chips in 1:2:4 ratio)CTC Pole and concrete biscuit supply |
| 14 | a)Erection of C.T.C Traction Pole at site including supply of materials(approved grade cement,medium sand and 5/8 chips in 1:2:4 ratio)CTC Pole and concrete biscuit supply |
| 15 | Excavation of Pole pit 1mtr in dia an 2 mtr in depth |
| 16 | Hiring of crane with operator to lift/move the Poles |
| 17 | Extraction of Traction Pole and filling pit with soil, rubbish etc followed by suitable ramming up to ground level. |
| 18 | Muffing of Pole(unbolted) 300mm above ground level, 150mm around the Pole using cement,sand and stone chips in 1:2:4 ratio |
| 19 | Muffing of Pole(bolted)250mm above ground level, 225mm around the Pole using cement,sand and stone chips in 1:2:4 ratio |
| 20 | Laying of 02 no\"s of 185 sqmm flexible copper cable beneath G.L through underground G.I Pipe |
| 21 | Laying of single 3.3 KV grade 1000 sqmm armoured Aluminium cable along the underground trench of 1 mtr average depth |
| 22 | Hiring and using of Welding Generator set for negative rail bonding |
| 23 | Transportation of Pole from yard to site and back |
| 24 | Painting of Steel Tubular Traction Poles, 9 mtr in length from ground level with ready mix paint/primer of approved make and brand including preparation of surface by sand /emery paper,cleaning etc by receiving fresh coat of paint as per following steps:i) one coat of red lead priming ii) two coats of paints(Aluminium) over the existing coating of primer |
| 25 | Numbering of Poles horizontally at 1 mtr height from ground level facing Tram tracks |
| 26 | Numbering of Poles vertically at 3 mtr height from ground level facing Tram tracks .Digit should be 6 cm in 5:4 ratio using black paint |
| 27 | Laying of 150 sqmm G. I/ HDPVC Pipe beneath G.L in course of 1000 sqmm Traction cable laying |
| 28 | Modification of railing: a) upto 4 railing |
| 29 | Modification of railing: b) upto 6 railing |
| 30 | Repairing of Pole by coupling with 2 jackets(CTC suply)upto 2 mtrs from G.L |
| 31 | supply and installation of ancillary items and allied work related to fixing of OHE Suspension systemwithin M.S Structures at Rly underpass or other to ensure OHE support network |
| 32 | Dismantling of damaged Ply board (4\" x 4\")/wooden plank beneath Rly underpass and fixing of new/servicable one (CTC supply) |
| 33 | Modification of MS Structure(4\" length- CTC supply) by setting of MS angle at suitable points by drilling ,welding etc |
| 34 | Lighting arrangement including power supply/generator |
| 35 | Hiring of lifting vehicles in connection with fixing work of angles, brackets ,wooden structure within Rly underpass/other in to and fro transportation of related items |