| 1 | 1)ZonalRepairs ofroadfrom Dhadgaon Amla, Nimkhedi to Genda TAL. Akrani DIST. Nandurbar. Ch.0/00 to 0/800 & 1/500 to 14/000 KM.(Package No. MH-19/NDR/2021-22/ZM/77) |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means in area of Thorny Jungles |
| 3 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For: Excavation in Soil using Hydraulic Excavatorand Tippers with disposal above 100 m |
| 4 | Maintenaqnce of Earthen Shoulders - Making up loss of material/ irregularies on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per Technical specification clause 1903. |
| 5 | Maintenaqnce of Bitumions surface road - Repairs to Pot holes by modified penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates including excavating the sunken portions of failed road removal of failed materials, trimming the sides to vertical and leveling the bottom clearing the same with compressed air or any other appropriate method and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. |
| 6 | Maintenaqnce of Bitumions surface road - (iii) Patch repair on already filled pot holes with 75 mm MPM / BM with 20 mm premix carpet andseal coat Type B as per drawings and technical specification Clause 1904.2 |
| 7 | 2)ZonalRepairs ofroadfrom MDR-47 To Chandsaily TAL. Akrani DIST. Nandurbar. Ch.0/00 to 5/000 KM. (Package No. MH-19/NDR/2021-22/ZM/77) |
| 8 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means in area of Thorny Jungles |
| 9 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For: Excavation in Soil using Hydraulic Excavatorand Tippers with disposal above 100 m |
| 10 | Maintenaqnce of Earthen Shoulders - Making up loss of material/ irregularies on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per Technical specification clause 1903. |
| 11 | Maintenaqnce of Bitumions surface road - Repairs to Pot holes by modified penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates including excavating the sunken portions of failed road removal of failed materials, trimming the sides to vertical and leveling the bottom clearing the same with compressed air or any other appropriate method and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. |
| 12 | Maintenaqnce of Bitumions surface road - (iii) Patch repair on already filled pot holes with 75 mm MPM / BM with 20 mm premix carpet andseal coat Type B as per drawings and technical specification Clause 1904.2 |
| 13 | 3)ZonalRepairs ofroadfrom Khamala To Baripada TAL. Akrani DIST. Nandurbar. Ch.3/00 to 5/500 KM. (Package No. MH-19/NDR/2021-22/ZM/77) |
| 14 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means in area of Thorny Jungles |
| 15 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For: Excavation in Soil using Hydraulic Excavatorand Tippers with disposal above 100 m |
| 16 | Maintenaqnce of Earthen Shoulders - Making up loss of material/ irregularies on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per Technical specification clause 1903. |
| 17 | Maintenaqnce of Bitumions surface road - Repairs to Pot holes by modified penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates including excavating the sunken portions of failed road removal of failed materials, trimming the sides to vertical and leveling the bottom clearing the same with compressed air or any other appropriate method and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. |
| 18 | Maintenaqnce of Bitumions surface road - (iii) Patch repair on already filled pot holes with 75 mm MPM / BM with 20 mm premix carpet andseal coat Type B as per drawings and technical specification Clause 1904.2 |
| 19 | 4)ZonalRepairs ofroadfrom Katri To Torkhapada TAL. Akrani DIST. Nandurbar. Ch.0/00 to 2/000 & 3/00 to 5/200 KM. (Package No. MH-19/NDR/2021-22/ZM/77) |
| 20 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means in area of Thorny Jungles |
| 21 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For: Excavation in Soil using Hydraulic Excavatorand Tippers with disposal above 100 m |
| 22 | Maintenaqnce of Earthen Shoulders - Making up loss of material/ irregularies on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per Technical specification clause 1903. |
| 23 | Maintenaqnce of Bitumions surface road - Repairs to Pot holes by modified penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates including excavating the sunken portions of failed road removal of failed materials, trimming the sides to vertical and leveling the bottom clearing the same with compressed air or any other appropriate method and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. |
| 24 | Maintenaqnce of Bitumions surface road - (iii) Patch repair on already filled pot holes with 75 mm MPM / BM with 20 mm premix carpet andseal coat Type B as per drawings and technical specification Clause 1904.2 |
| 25 | 5)ZonalRepairs ofroadfrom T-13 To Shelkhedipada TAL. Akrani DIST. Nandurbar. Ch.0/00 to 4/000 KM. (Package No. MH-19/NDR/2021-22/ZM/77) |
| 26 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Mechanical Means in area of Thorny Jungles |
| 27 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 For: Excavation in Soil using Hydraulic Excavatorand Tippers with disposal above 100 m |
| 28 | Maintenaqnce of Earthen Shoulders - Making up loss of material/ irregularies on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per Technical specification clause 1903. |
| 29 | Maintenaqnce of Bitumions surface road - Repairs to Pot holes by modified penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates including excavating the sunken portions of failed road removal of failed materials, trimming the sides to vertical and leveling the bottom clearing the same with compressed air or any other appropriate method and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. |
| 30 | Maintenaqnce of Bitumions surface road - (iii) Patch repair on already filled pot holes with 75 mm MPM / BM with 20 mm premix carpet andseal coat Type B as per drawings and technical specification Clause 1904.2 |