Shifting Installation Cable Earthling And Making Guard Wall Of 2500Kva Transformer From Silo Camps To Maheshpur Substation For The Power Supply To Pump Being Installed By Barora Area At Maheshpur Ocp Patch F1 For The Supply Of Domestic Water To Baror
Tender Overview
Project Description
Shifting Installation Cable Earthling And Making Guard Wall Of 2500Kva Transformer From Silo Camps To Maheshpur Substation For The Power Supply To Pump Being Installed By Barora Area At Maheshpur Ocp Patch F1 For The Supply Of Domestic Water To Baror
BOQ
| Sl. No. | Item Description |
| 1 | Dismantaling collection & shifting of 150mm dia ms pipe rail channal angle etc from Tatulia,Maheshpur mines and R/Store Sinidih |
| 2 | Fabrication erection of clumm rufter and parling with grouting |
| 3 | Removal of CGI sheet from Tatulia CHP to Maheshpur subastation 600sqt roof |
| 4 | Cutting of earth and filling of plinth of shed and cleaning of calvart for laying of HT cable |
| 5 | Remova loading/unloading/installation 6.6kv HT Switch with cable joint up to running of 2500kva transformer etc complete |
| 6 | Installation of chemical earth pit |
| 7 | Laying of 240 sqm cable |
| 8 | Jointing of cable 240sqm out door end termination with heat shrinkable joint kit |
| 9 | Jointing of cable 240sqm in door end termination with heat shrinkable joint kit |
| 10 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender