Outine Preventive / Breakdown Maintenance Of Esp Bottom Ash Evacuation System & H.P. / L.P. Water Pipe Lines And Transition Pipes Of Esp / Fg Duct / Aph Hoppers And General Up Keep Of Dry Fly Ash Extraction Plant Including Its Silo Area, Fabri, anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Outine Preventive / Breakdown Maintenance Of Esp Bottom Ash Evacuation System & H.P. / L.P. Water Pipe Lines And Transition Pipes Of Esp / Fg Duct / Aph Hoppers And General Up Keep Of Dry Fly Ash Extraction Plant Including Its Silo Area, Fabri. Submission Date for this Tender is 02-04-2022. Ash Handling Machine Tenders in anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

31464165
Outine Preventive / Breakdown Maintenance Of Esp Bottom Ash Evacuation System & H.P. / L.P. Water Pipe Lines And Transition Pipes Of Esp / Fg Duct / Aph Hoppers And General Up Keep Of Dry Fly Ash Extraction Plant Including Its Silo Area, Fabri
Open Tender
Indian
Uttar Pradesh
anpara
02-04-2022

Tender Details

Outine Preventive / Breakdown Maintenance Of Esp Bottom Ash Evacuation System & H.P. / L.P. Water Pipe Lines And Transition Pipes Of Esp / Fg Duct / Aph Hoppers And General Up Keep Of Dry Fly Ash Extraction Plant Including Its Silo Area, Fabrication & Erectionof Bellow Type Expansion Joints Of Flushing Apparatus, Fabrication & Erection Of Flushing Apparatusof Esp, Air Pre Heater & Flue Gas Duct Hoppers Of Esp Bottom Ash Evacuation System Of Unit No. 4 & 5 Of B Tps, Anpara.

Key Value

Document Fees
INR 1180 /-
EMD
INR 76500.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: outine Preventive/Breakdown maintenance of ESP Bottom Ash Evacuation System & H.P. / L.P. water pipe lines and transition pipes of ESP/FG duct/APH hoppers and general up keep of Dry Fly Ash Extraction Plant including its Silo area, Fabrication & erectionof bellow type expansion joints of flushing apparatus, Fabrication & erection of flushing apparatusof ESP, Air pre heater & flue gas duct hoppers of ESP bottom ash evacuation system of unit No. 4 & 5 of "B" TPS, Anpara.
Sl. No. Item Description
1Part-A(Routine maintenance)
2Routine maintenance, hammering and choking removal of ESP, APH, FG duct, chimney bottom ash evacuation system of unit No. 4 & 5 of 2x500 M.W. BTPS, Anpara.
3Complete evacuation of fully / partially filled APH/FG Duct/Chimney/ESP hoppers of Unit No. 4 & 5 during start up of unit / due to break down of rotary feders / due to break down of Auto/manual rapping system (EERM/ CERM) of ESP.
4General upkeep of the DFA extraction plant (located within plant premises) of Unit No. 4 & 5 of 2X500 M.W., ‘B’ TPS, Anpara.
5General upkeep of the silo area of DFA Extraction Plant (located out side of plant premises) & Complete cleaning of outer surface of hoppers, walls, equipments of ESP & DFA system and pipe lines in ESP of 2X500 M.W. ‘B" TPS, Anpara.
6Part-B(Break down maintenance)
7Replacement /revisioning of bearing/rotor/DE & NDE bush / DE shaft/end cover of rotary air lock valve.
8Replacement of damaged blade of rotor of rotary air lock valve.
9Repairing of damaged/squeezed blades of rotor of rotary air lock valve by gas heating & pressing to bring them back in their original shape/angle.
10Replacement of rotary air lock valve by new / repaired one.
11Repairing of rotary vane shaft by welding with SS electrode (SS-304) and matching.
12Repairing of end cover of rotary air lock valve by filling of material with cast iron electrode in the eroded portion and machining of end cover.
13Repairing of cracked cast iron body/flange of rotary air lock valve by welding with CI electrode and machining /grinding of the same.
14Servicing of Gear Box of rotary air lock valve including replacement of damaged part if any.
15Replacement of Gear Box of rotary air lock valve by new/serviced/repaired gear box.
16Attending leakage from ash pan by providing patch and welding with MS electrode.
17Minor repairing of large/medium/small flushing apparatus ofESP/APH/FG duct/chimney hoppers.
18Replacement / servicing of nozzle tips of flushing pan.
19Repairing of deflected / damaged grating of sluiceways / drains of ESP area by cutting and welding / heating with gas and hammering.
20Big size : 1300 mm X 1000 mm
21Small size : 1000 mm X 1000 mm
22Cleaning of ash trenches of ESP area along with tightening of nut & bolts of liners of sluiceways.
23Repairing / attending leakages of miscellaneous pipes /discharge pipes, equipment by patch welding with MS electrode.
24Repairing of nozzle pipe / nozzle holder assembly of flushing pan.
25Repairing of Expansion bellows by hammering, grinding and welding.
26Cleaning of trenches of economizer/ APH / FG duct hoppers.
27Cleaning of chimney duct hopper trenches and its surrounding area.
28Cleaning of main sluiceways of ESP area located at south of ESP.
29Replacement / repairing of following wear plates of large/ medium / small size flushing pans :
30Base wear plate
31Side wear plate
32Vertical wear plate
33Replacement of gasket / jointing sheet of plate valve installed in transition pipe of large/medium/small size flushing pan.
34Replacement of flange gaskets of LP water line / header in ESP area.
35Checking & inspection thoroughly inside and outside, cleaning of large size flushing pan after dismantling and refitting of the same.
36Checking & inspection thoroughly inside and outside, cleaning of medium and small size flushing pan after dismantling and refitting of the same.
37Servicing / replacement of butter fly valves of following sizes:
3850 mm NB
3965 / 80 mm NB
40150 mm NB
41Servicing / replacement of gate valves installed in service water line of following sizes:
4225 mm NB
4350 mm NB
4480 mm NB
45Servicing/Replacement of plate valves of following sizes :
46300 mm NB
47200 mm NB
48Recouping of flanges / bends /T-bends/ reducers of different size from old / damaged pipe, flushing pans etc. by cutting & smoothening of their rough surface.
49Fabrication of M.S. flanges of different sizes from M.S. plate by gas cutting, chipping, grinding & drilling etc.
50Fabrication and erection / repairing of steel structure of different steel sections.
51Providing tapping of different size M.S. /C.S. water pipe.
52Replacement of worn out/damaged MS pipes of following sizes :
5312 mm to 125 mm NB
54150 mm to 450 mm NB
55De-silting/cleaning of various water pipes of following sizes :
5612/15 mm NB
5720/25 mm NB
5840/50 mm NB
5965 mm NB
6080 mm NB to 150mm NB
61Dismantling of pipe/valves, supports etc of various sizes by gas cutting and transportation from site to site store/scrap yard.
62Providing of valve / flanges /bends /reducers /"T"-bends in existing / replaced pipe line as per scope of work.
63Replacement of damaged gaskets of different sizes of flanges of bottom ash evacuation system of ESP, APH, FG duct & chimney as well as of HP/LP water line.
64Replacement of filter cloth and cleaning of fluidizing pads of ESP hoppers
65Fabrication & installation of pipe support / clamp of pipe line
66Fabrication & replacement of 300 mm NB transition pipesof hoppers of 1st to 3rd row of ESP.
67Fabrication & replacementof 200 mm NB transition pipesof hoppers of 4th to 7th row of ESP and FG duct /APH /chimney.
68Fabrication & replacement of 200 mm NB transition pipes of hoppers of FG duct /APH /chimney.
69Painting with one coat of red oxide primer & two coats of reputed make synthetic enamel paint of approved colour on pipe and steel structure.
70Part-C(Fabrication work of ESP)
71Fabrication of bellow type expansion joints for 1st to 3rd row of ESP hoppers of Unit No. 4&5.
72Fabrication of bellow type expansion joints for 4th to 7th row of ESP hoppers and for APH/FG duct hoppers of Unit No. 4&5.
73Erection of bellow type expansion joints for 1st to 3rd row of ESP hoppers of Unit No. 4&5.
74Erection of bellow type expansion joints for 4th to 7th row of ESP hoppers and for APH/FG duct hoppers of Unit No. 4&5.
75Fabrication of M.S. pipe bends, reducers & "T"-bends of different sizes.
76Fabrication of Large Size Flushing Apparatus including its 250 mm NB discharge bends for 1st to 3rd Row of ESP hoppers of unit # 4 & 5.
77Fabrication of small/ medium size Flushing Apparatus of APH/FG duct hoppers including its 150 mm NB discharge bends of unit No. 4 & 5.
78Major repairing of large size flushing apparatus of ESP hoppers.
79Major repairing of medium size flushing apparatus of ESP hoppers
80Major repairing of small size flushing apparatus of APH/FG duct/Chimney hoppers
81Erection of Large Size fabricated/major repaired Flushing Apparatus for 1st to 3rd Row of ESP hoppers of unit # 4 & 5.
82Erection of small/medium size Flushing Apparatus of APH / FG duct/ESP hoppers of unit No. 4 & 5.
83Painting of large size flushing apparatus.
84Painting of Small/ Medium size flushing apparatus.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail