Repair And Maintenance Of Ngr, Welding Mc, Drill Panel And Motor-2 Supply & Fixing Of Nichrome Resistance Strip ( Plate Type ) 3 Supply & Fixing Of Insulator Of Resistance Box 4 Supply & Fixing Of Cbct For E / L Relay 5 Supply & Fixing Of Ne
Tender Overview
Project Description
Repair And Maintenance Of Ngr, Welding Mc, Drill Panel And Motor-2 Supply & Fixing Of Nichrome Resistance Strip ( Plate Type ) 3 Supply & Fixing Of Insulator Of Resistance Box 4 Supply & Fixing Of Cbct For E / L Relay 5 Supply & Fixing Of Neutral Failure Relay 6 Supply &Fixing Of Copper Lugs 7 Repairing And Rewinding Of Tripping Circuit With Ferrule And Shunt Trip Relay 8 Part – B ( Enter Zero For This Row ) 9 Cost Of New Copper Conductor 10 Insulating Materials Of New Copper Conductor 11 Labour Charges 12 Less : Salvage ( Scrap Value ) 13 Supply And Fixing Of Regulator Switch 14 Supply And Fixing Of Copper Rod For Cable Connection 15 Supply And Fixing Of Brass Nut 16 Supply And Fixing Of Bekalite Board 17 Tank Cleaning Denting & Painting 18 Supply & Fixing Of Glass Moulded Bobin 19 Supply & Fixing Of Flexible Terminals Lead With Glass Insulation 20 Supply & Fixing Of Copper Lugs 21 Part – C ( Enter Zero For This Row ) 22 Supply And Fixing Of Copper Lugs 23 Supply And Fixing Of Flexible Terminals Lead With Glass Insulation 24 Motor & Rotor Alignment Checking On Lathe Machine, Machining & Polishing 25 New C.I Casting Machining Of Bearing Housing As Per Shape And Size 26 Supply & Fixing Of Missing H.T Nut Bolts As Per Required Size 27 Rotor Shaft Welding 28 New Terminal Box Making And Fixing 29 Supply & Fixing Of New Making Of Motor Dala 30 New Making Of Hole For Motor Dala 31 Motor Varnishing & Heating 32 Cast Iron Welding, Repairing & New Hole Making At The Base Of The Motor 33 Complete Opening, Fitting After Full Overhauling , Cleaning Of Both End, Bearing Greasing 34 Part – D ( Enter Zero For This Row ) 35 Supply And Fixing Of Test / Reset Switch 36 Supply And Fixing Of Indicator Lamp And Push Switch 37 Supply And Fixing Of E / L Relay Electronic Type 38 Complete Body Cleaning And Spray Painting Charge 39 Supply And Fixingof Ferules, Lugs, Clips, Socket, Wiring Bolts Etc For Circuit Wiring 40 Supply And Fixing Of Pt 550 V / 220 V / 110 V / 24 V / 12 V 41 Supply And Fixing Of Rectifier Unit 42 Supply And Fixing Of Bushing Insulator Outgoing And Incoming Side 43 Supply And Fixing Of Cbct For Earth Leakage Relay 750 Ma 44 Total Impact Of Gst For The Purpose Of Ctc
BOQ
| Sl. No. | Item Description |
| 1 | Part – A(enter zero for this row) |
| 2 | Supply & fixing of Nichrome resistance Strip (Plate Type ) |
| 3 | Supply & fixing of insulator of resistance box |
| 4 | Supply & fixing of CBCT for E/L relay |
| 5 | Supply & fixing of Neutral Failure relay |
| 6 | Supply &fixing of Copper lugs |
| 7 | Repairing and rewinding of tripping circuit with ferrule and shunt trip relay |
| 8 | Part – B(enter zero for this row) |
| 9 | Cost of new copper Conductor |
| 10 | Insulating materials of new copper conductor |
| 11 | Labour charges |
| 12 | Less : Salvage (scrap value ) |
| 13 | Supply and fixing of regulator switch |
| 14 | Supply and fixing of copper rod for cable connection |
| 15 | Supply and fixing of brass nut |
| 16 | Supply and fixing of bekalite board |
| 17 | Tank cleaning denting & painting |
| 18 | Supply & fixing of glass moulded bobin |
| 19 | Supply & fixing of flexible terminals lead with glass insulation |
| 20 | Supply & fixing of copper lugs |
| 21 | Part – C(enter zero for this row) |
| 22 | Supply and fixing of copper lugs |
| 23 | Supply and fixing of flexible terminals lead with glass insulation |
| 24 | Motor & rotor alignment checking on lathe machine, machining & polishing |
| 25 | New C.I casting machining of bearing housing as per shape and size |
| 26 | Supply & fixing of missing H.T nut bolts as per required size |
| 27 | Rotor shaft welding |
| 28 | New terminal box making and fixing |
| 29 | Supply & fixing of new making of motor dala |
| 30 | New making of hole for motor dala |
| 31 | Motor varnishing & heating |
| 32 | Cast Iron welding, repairing & new hole making at the base of the motor |
| 33 | Complete opening, fitting after full overhauling , cleaning of both end, bearing greasing |
| 34 | Part – D(enter zero for this row) |
| 35 | Supply and fixing of Test/ reset switch |
| 36 | Supply and fixing of indicator lamp and push switch |
| 37 | Supply and fixing of E/L relay electronic type |
| 38 | Complete body cleaning and spray painting charge |
| 39 | Supply and fixingof ferules, lugs, clips, socket, wiring bolts etc for circuit wiring |
| 40 | Supply and fixing of PT 550 V/ 220 V/ 110 V/ 24 V/ 12 V |
| 41 | Supply and fixing of rectifier unit |
| 42 | Supply and fixing of bushing insulator outgoing and incoming side |
| 43 | Supply and fixing of CBCT for earth leakage relay 750 mA |
| 44 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.