Border Roads Organisation-BRO has published Pdg And Lyg Of Ready Mix Bc 30 Mm Th And Applying Tack Coat Incl Correction Wk For Resurf Wk Bet Km 0.000 And Km 17.445 On Chk Rd And Bet Km 9.450 And Km 38.490 On Kvk Rd Under 74 Rcc Project Pushpak In Mizoram State Pdg And Lyg Of Ready Mix Bc 30 Mm Th A. Submission Date for this Tender is 28-03-2022. Road Work Tenders in Pushpak Mizoram. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Mar-2022 | Change in bid submission end date | Date | 28-03-2022 |
Sl. No. | Item Description |
1 | RESURFACING WORK ON CHAMPHAI-HNAHLAN-KHUANGPHAH ROAD BETWEEN KM 0.000 AND KM 17.445 |
2 | Providing and laying of Bituminous Concrete (BC) 30 mm thick consolidated with bitumen VG-10/VG-30 as per clause 507 of MoRT&H (Ministry of Road Transports and Highways)(fifth revision) specification for road & bridge works, including tack coat as per clause 503 of MoRT&H (fifth revision) on the already existing BT surface, correction work with WBM 75 mm thick consolidated as per Clause 404 of MoRT&H (Fifth revision) and Prime coat over WBM correction surface as per Clause 502 of MoRT&H (Fifth revision) duly maintaining the road profile and laying the ready mix for Bituminous Concrete 30 mm with paver finisher and rolled as per clause 501.6 and 501.7 of Mort&H (fifth revision) to achieve desired compaction (including cost of conveyance of mix). Note : 1.The specification given at Clause 3004.2 of MoRT&H(Fifth revision)specifications will be complied while carried out correction work i.e Preparation of area for potholes and patch repair, filling/spreading withWBM materials and application of bitumen emulsion (prime coat) 2. The maximum area of correction work with WBM 75 mm thick consolidated will be 10% of BC area |
3 | RESURFACING WORK ON KHAUNGPHAH-NEW VAIKHAWTLANG-KAWLBEM ROAD BETWEEN KM 9.450 AND KM 38.490 |
4 | Providing and laying of Bituminous Concrete (BC) 30 mm thick consolidated with bitumen VG-10/VG-30 as per clause 507 of MoRT&H (Ministry of Road Transports and Highways)(fifth revision) specification for road & bridge works, including tack coat as per clause 503 of MoRT&H (fifth revision) on the already existing BT surface, correction work with WBM 75 mm thick consolidated as per Clause 404 of MoRT&H (Fifth revision) and Prime coat over WBM correction surface as per Clause 502 of MoRT&H (Fifth revision) duly maintaining the road profile and laying the ready mix for Bituminous Concrete 30 mm with paver finisher and rolled as per clause 501.6 and 501.7 of Mort&H (fifth revision) to achieve desired compaction (including cost of conveyance of mix). Note : 1.The specification given at Clause 3004.2 of MoRT&H(Fifth revision)specifications will be complied while carried out correction work i.e Preparation of area for potholes and patch repair, filling/spreading withWBM materials and application of bitumen emulsion (prime coat) 2. The maximum area of correction work with WBM 75 mm thick consolidated will be 10% of BC area |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail