Agriculture Government Departments Closing in 0 days TDR #31444526

Routine Maintenance Of Residential Buildings Of Alhw At Hut Bay In Little Andaman For A Period Of 01 ( One ) Year

Issued by Government Departments · andaman, Andaman And Nicobar Islands
Tender Value
22.57 Lakhs
Estimated cost
Bid Submission
25 Mar 2022
0 days left
EMD
45150
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
andaman → Andaman And Nicobar Islands
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Routine Maintenance Of Residential Buildings Of Alhw At Hut Bay In Little Andaman For A Period Of 01 ( One ) Year

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Mar-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 25-Mar-2022

BOQ

Name of Work:Routine Maintenance of Residential buildings of ALHW at Hut Bay in Little Andaman for a period of 01 (one) year
Sl. No. Item Description
1Providing and fixing fully panelled door double / single hung (Superior Hardwood Category-II) fixing with 10 x 8cm frames and 4 cm thick shutters including cost of superior quality of timber and all fittings all labour charges, transportation charges of materials to worksite, minor tools, GST, labour cess etc., complete.
2Door Chowkat
3Panneled Door Shutter
4Providing and fixing 20cm thick masonry with hollow blocks of size 0.40m x 0.20m x 0.20m cast with 1:6 cement mortar (1 cement, 6 pulverized stone sand / quarry dust), curing the hollow blocks and fixing with cement mortar 1:4 in walls as directed by Engineer-In-Charge, including cost of cement, pulverized stone sand, quarry dust, transportation charges of all materials to work site, cost of timber palates, scaffolding charges, all labour charges and minor tools, GST, labour cess etc., complete.
5Providing CC Ramp around the building with 75 mm thick of CC 1:3:6 (1 cement, 3 Mainland river sand, 6 stone metal of size 40mm) including finishing the top smooth & finishing with neat cement @ 9.76 Kgs per 10.00 Sqm including cost of cement, pulverized stone sand, quarry dust, transportation charges of all materials to work site, all labour charges and minor tools, GST, labour cess etc., complete.
6Providing CC surface drain 15 cm x 15 cm with 1:4:8 cement concrete (1 Cement, 4Mainland river sand, 8 Stone metal 40mm size) finished with 1:4 cement plaster 12 mm thick. (1 Cement, 4 Mainland river Sand) including cost of cement, mainland river sand, pulverized stone sand & 40mm size stone metal, including cost of transportation charges all materials to work site, all labour charges and minor tools, GST, labour cess etc., complete.
7Providing and fixing anodised aluminium work for False ceiling (with minium 15 micron uniform anodic coating) consisting of tee/angle section, of approved make conforming to IS;733 in frames of false ceiling including aluminium angle cleats with necessary C.P.brass/stainless steel sunk screws aluminium perimetre angles fixed to wall with rawl plugs @ 450mm center to center and fixing the frame work to level adjusting angles (6mm dia M.S rods) with necessay cadminum plated machine screws all complete as per approved arichitectural drawings and direction of the EIC, all labour charges and minor tools, GST, labour cess etc., complete.
8Providing and fixing False ceiling with 5 mm thick asbestos cement sheet conforming to IS 2098:1997 (first Revition) finished with a coat of cement primer on the both side & edges and two coats of synthetic enamel paint of approved quality on exposed face fixed with a coat of cement primer on both side and ridge and two coats of synthetic enamel paint of approved quality on exposed face fixed to a grid made out of anodised aluminium (with 15 micron anodiced coating) T section 35 x 15 x 1.5 mm size main runner and cross runner 23.5 x 19 x 1.5 mm fixed to main runner placed 600 mm centre to centre both ways so as to form a grid of 600 mm Sq, the frame work shall be suspended from ceiling by level adjusting hangers of size 6mm dia M.S rod fixed to roof slab by means of ceilling clests the suspended shall be placed 600 x 1200 mm center to center including fixing to the frame with C.P brace, screws and applying priming coat of zinc cromate, yellow primer,all labour charges, minor tools, GST, labour cess etc., complete.
9Providing and fixing of eaves or facia board with 30 x 2.5 cm sawn hard wood planks, including cost of timber, transportation charges, all labour charges and minor tools, GST, labour cess etc., complete.
10Providing and fixing of anodised door, windows, Ventilator, Sliding door single hung type with fan, light/windows/ventilators with standard section of heavy duty anodized aluminium sections (manufactured of ISI specifications) providing and fixing handles, locking arrangements, channels for sliding/openable arrangements (Hinges), including cost of all materials, glass pans of 5.50 mm thick, rubber beading etc. as directed by the Engineer-in-Charge, all labour charges for fabrication and erection, transportation charges and minor tools, GST, labour cess etc., complete.
11Providing and fixing glazing in aluminium door, window ventilator, shutters and partitions etc. with PVC neoprene gasket etc. complete as per the architectural drawings and the direction of EIC (cost of aluminium snap beading shall be paid in basic item) with glass panes of 5mm tickness (weight not less than 10.00 per Sqm. all labour charges and minor tools, GST, labour cess etc., complete.
12Distempering two coats with approved colour of dry bound washable distemper over old plastered surface (Interior wall) with preparation of surface including cleaning, scraping of the existing painted surface,cost of distemper, brushes, transportation charges, scaffolding arrangments, emery paper for smooth finish, all labour charges and minor tools, GST, labour cess etc., complete.
13Finishing with all weather antifungal painting (Rain Guard) (two coats in out side areas) at all locations prepared and applied as per manufacturers specification including appropriate priming coat, preparation of surface on concrete work etc., including cost ofscrapping, brush, all labour charges, scaffolding charges and cost of minor tools, GST, labour cess etc.,complete.
14Providing and laying of RCC 1:1.5:3 (One cement, one and half Mainland stone sand and threestone chips 20mm) for precast slab etc., including cost of cement, Mainland river sand & 20mm size stone chips, all labour charges for mixing of concrete, placing, consolidation and transportation charges for all materials to work site, hire charges of mixer machine & vibrator and minor tools, GST, Labour cess etc., complete.
15Providing form work including centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floors to ceiling not exceeding 4m and removal of the same for in situ reinforced concrete and plain concrete work, all labour charges and minor tools, GST, labour cess etc., complete. (foundation footings, based of coloums etc and mass concerte).
16Fabrication and fixing mild / cold twisted steel reinforcement for RCC works, including cutting, bending , binding and placing in position as directed by Engineer-In-charge including cost of steel, cost ofbinding wire, transportation charges of all materials to work site all labour charges, minor tools, GST, labour cess etc., complete.
17Plastering with cement mortar 1:4 with 12mm thick, over exposed surface of concrete, hollow block walling, including cost of cement, Mainland river sand, transportation charges, all labour charges and minor tools, GST, labour cess etc., complete.
18Providing and fixing of barbed wire fencing around security wall wherever damaged, including cost of barbed wire, all labour charges, transportation charges of all materials to worksite and minor tools, GST, labour cess etc., complete.
19Providing and fixing of white vitreous china water closet squatting pan (Indian type W.C pan) with 100 mm sand cast iron P or S trap, 10 litre low level PVC flushing cister (of approved make) with fitting C.I, MS brackets, 32mm diameter flush pipe with fitting and clamps, overflow arrangement with special and mosquito proof coupling of approved municipal design including painting of fitting and brackets, cutting and making good the walls and floors wherever required. Long pan pattern W.C pan of size 580 mm with flush, including cost of W.C pan, Trap, transportation charges, all labour charges and minor tools, GST, labour cess etc., complete.
20Providing and fixing white vitreous china pedestal type water closet (Europeantype W.C pan) with seat and lid, CP brass hinges and rubber buffers, 10 litre low low level PVC flushing cistern with fittings CI, MS brackets, 40 mm diameter flush pipe with fittings and clamps, overflow arragement with specials and mosquito proof coupling of approved municipal design including painting of fittings and brackets, cutting and making good the walls and floors wherever required, including cost of all materials, all labour charges, transportation charges and minor tools, GST, laboue cess etc., complete.
21Fabrication and fixing of G.I. Pipe gate, including cost of GI Pipe and all fittings, placing in position as directed by Engineer-In-Charge, including transportation charges of all materials to work site all labour charges, minor tool, GST, labour cess etc., complete.
22Earth work excavation in ordinary soil(excluding Kankar, moorum , saturated oiland rock) lift upto 1.50m, stacking the excavated soilnot more than 3m clear from the edge of excavation and returning the excavated soil 150mm layerswhen required into plinth side, foundation etc, consolidating each deposit layer by ramming, watering and disposing of all surplus excavated soil within a lead of 50M as directed by Engineer-In-Charge including cost of all labour charges, minor tools, GST, labour cess etc., complete.
23Removing the old pipe lead and span yarn from the pipe line joints, including cleaning the pipe, replacing fresh lead and span yarn etc., including cost of lead, apan yarn, transportation charges for all materials to work site, cost of all labour charges and minor tools, GST, labour cess etc., complete.
24Scrapping and cleaning the green layer or shells from inside of the wall surface of Raw water tank, Sedimentation tank, Slow sand filter tank, Filter tank and all connectivity drains at Water Treatment Plant and disposal of the same with in a lead of 100 m from the worksite etc., including cost of all labour charges and minor tools, GST, labour cess etc., complete.
25Digging out silky sand deposited on the inside of slow sand filter tank and taking out the same carefully with filter media and disposal of the same by head load with in a lead of 100 m as per the direction of Engineer-In-Charge, including all labour charges, minor tool, GST, labour cess etc., complete.
26Collection, conveying of River sand within a lead of 3 km and stacking the same at Water Treatment Plant as per the direction of Engineer-In-Charge, including cost of River sand, transportation charges, all labour charges for loading, unloading & stacking and cost of minor tool, GST, labour cess etc., complete.
27Conveying of River sand by head lead within a lead of 100 m from sand stackyard to slow sand filter tank, washing the sand and placing inside of tank in layer without damaging the neat layer of filter media as per the direction of Engineer-In-Charge, including cost of all labour charges and minor tools, GST, labour cess etc., complete.

AI Tender Summary

OUR REF NO 31444526
AUTHORITY Government Departments
TENDER VALUE 22.57 Lakhs
LAST DATE 25-03-2022
Authority
Authority Name Andaman Lakshadweep Harbour Works
Work Description Routine Maintenance Of Residential Buildings Of Alhw At Hut Bay In Little Andaman For A Period Of 01 ( One ) Year
Basic Detail
Tender No EEM/LA/DB/e-T-04/2021-22/ 164
Bidding Type Tender
Location
City andaman
State Andaman And Nicobar Islands
Key Dates
Publish Date 21 Mar 2022
Submission Date 25 Mar 2022
Open Date 26 Mar 2022
Finance
Tender Value 22.57 Lakhs
Tender Fee 500
EMD 45150
Exemption Not Available
Document List
ecda943c-a003-49ec-8552-bfce0b2f21c8.html
BOQ_714073.xls
e-4TD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 21, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 25, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 26, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

ecda943c-a003-49ec-8552-bfce0b2f21c8.html

xls

BOQ_714073.xls

pdf

e-4TD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders