supply of 415V Lv Switchboard For Sagardighi Tpp 415V Lv Switchboard For Sagardighi Tpp , 415V Dg Pcc #0Di As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charg, sagardighi-West Bengal

Bharat Heavy Electricals Limited-BHEL has published supply of 415V Lv Switchboard For Sagardighi Tpp 415V Lv Switchboard For Sagardighi Tpp , 415V Dg Pcc #0Di As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charg. Submission Date for this Tender is 04-05-2022. MCCB Tenders in sagardighi West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

31443877
Corrigendum : supply of 415V Lv Switchboard For Sagardighi Tpp 415V Lv Switchboard For Sagardighi Tpp , 415V Dg Pcc #0Di As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charg
Open Tender
Indian
West Bengal
sagardighi
04-05-2022

Tender Details

supply of 415V Lv Switchboard For Sagardighi Tpp 415V Lv Switchboard For Sagardighi Tpp , 415V Dg Pcc #0Di As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Emergency Mcc #5Dg As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Main Dcdb #5Fa As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Sb Dcdb #Ofc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Id Fan Area Mcc #5Hd As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Boiler Pmcc #5Db As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Boiler Valve And Damper Db #5Hb As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Boiler Acdb #5Hc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Turbine Pmcc #5Da As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Unit Service Acdb #5Qa As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Turbine Valve Db #5Kb As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Station Service Pmcc #0Da As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Vent Mcc #0Td As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Air Conditioning Mcc #0Te As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Misc Serv Mcc #0Qc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Cpu Pmcc #0Dn As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Amm Unload Mcc #0Du As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Fgd Pmcc #0Dm As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Fgd & Esp Ac Vent Mcc#0Tc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Fgd Dcdb As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Cwbd Pmcc #0Dp As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Fire Water / Cw Mcc / Cw Trt #0Sb As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Chp Mcc-1 Ltmcc-1 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Chp Mcc-2 Ltmcc-1 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Chp Mcc-2 Ltmcc-2 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Chp Mcc-3 Ltmcc-1 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Ahp Mcc-1 Ltmcc-1 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Ahp Mcc-1 Ltmcc-2 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Ahp Mcc-2 Ltmcc-1 As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5Dc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5Dd As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5De As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5Df As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5Dh As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Esp Ltmsb #5Di As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pa As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pb As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pd As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pe As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Acp 5Pf As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Switchyard Main Pmcc As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Mldb For Switchyard 125Kva As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Emergency Power Distribution Board As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Eldb For Switchyard 150Kva As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Main Dcdb For Switchyard As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Standby Dcdb For Switchyard As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , Soot Blower Mcc ( Sbmcc ) As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Ac Mccb Db-3 Phase As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 415V Ac Mccb Db- 1 Phaseas Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , 220V Dc Mccb Db As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , Mandatory Spares -Annexure-F As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , E&C Spares-Annexure-E As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , Site Modification Charges-Annexure-G As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , Numerical Relay Commissiong Charge-Annexure-H As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination ) , Tools & Tackles-Annexure-I As Per Technical Specification No: Epd-Cpbg-Ts-Cpj127, Rev 00 ( Unit Rate ( At Column 13 ) To Be Quoted Including P&F Charges And Freight Charges Upto Destination )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-Mar-2022 Corrigendum-1 Technical Bid 26-03-2022
2 26-Mar-2022 Corrigendum-2 Date 04-04-2022
3 01-Apr-2022 Corrigendum-3B Technical Bid 07-04-2022
4 01-Apr-2022 Corrigendum-3A Date 07-04-2022
5 07-Apr-2022 Corrigendum-4 Date 18-04-2022
6 18-Apr-2022 Corrigendum-5 Date 25-04-2022
7 22-Apr-2022 Corrigendum-6B Date 28-04-2022
8 22-Apr-2022 Corrigendum-6A Technical Bid 28-04-2022
9 27-Apr-2022 Corrigendum-7B Date 02-05-2022
10 27-Apr-2022 Corrigendum-7A Technical Bid 02-05-2022
11 02-May-2022 Corrigendum-7 Date 02-05-2022
12 02-May-2022 Corrigendum-9 Date 04-05-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: LT SWITCHGEAR FOR KHURJA STPP (TG PACKAGE) (2X660MW)
Sl. No. Item Description
1415V DG PCC #0DI as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
2415V EMERGENCY MCC #5DG as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
3220V MAIN DCDB #5FA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
4220V SB DCDB #OFC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
5415V ESP ID FAN AREA MCC #5HD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
6415V BOILER PMCC #5DB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
7415V BOILER VALVE AND DAMPER DB #5HB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
8415V BOILER ACDB #5HC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
9415V TURBINE PMCC #5DA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
10415V UNIT SERVICE ACDB #5QA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
11415V TURBINE VALVE DB #5KB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
12415V STATION SERVICE PMCC #0DA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
13415V VENT MCC #0TD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
14415V AIR CONDITIONING MCC #0TE as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
15415V MISC SERV MCC #0QC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
16415V CPU PMCC #0DN as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
17415V AMM UNLOAD MCC #0DU as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
18415V FGD PMCC #0DM as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
19415V FGD & ESP AC VENT MCC#0TC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
20220V FGD DCDB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
21415V CWBD PMCC #0DP as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
22415V FIRE WATER/CW MCC/CW TRT #0SB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
23415V CHP MCC-1 LTMCC-1 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
24415V CHP MCC-2 LTMCC-1 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
25415V CHP MCC-2 LTMCC-2 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
26415V CHP MCC-3 LTMCC-1 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
27415V AHP MCC-1 LTMCC-1 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
28415V AHP MCC-1 LTMCC-2 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
29415V AHP MCC-2 LTMCC-1 as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
30415V ESP LTMSB #5DC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
31415V ESP LTMSB #5DD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
32415V ESP LTMSB #5DE as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
33415V ESP LTMSB #5DF as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
34415V ESP LTMSB #5DH as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
35415V ESP LTMSB #5DI as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
36415V ACP 5PA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
37415V ACP 5PB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
38415V ACP 5PC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
39415V ACP 5PD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
40415V ACP 5PE as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
41415V ACP 5PF as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
42415V SWITCHYARD MAIN PMCC as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
43415V MLDB FOR SWITCHYARD 125KVA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
44415V EMERGENCY POWER DISTRIBUTION BOARD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
45415V ELDB FOR SWITCHYARD 150KVA as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
46220V MAIN DCDB FOR SWITCHYARD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
47220V STANDBY DCDB FOR SWITCHYARD as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
48SOOT BLOWER MCC(SBMCC) as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
49415V AC MCCB DB-3 PHASE as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
50415V AC MCCB DB- 1 PHASEas per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
51220V DC MCCB DB as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
52MANDATORY SPARES -ANNEXURE-F as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
53E&C SPARES-ANNEXURE-E as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
54SITE MODIFICATION CHARGES-ANNEXURE-G as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
55NUMERICAL RELAY COMMISSIONG CHARGE-ANNEXURE-H as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
56TOOLS & TACKLES-ANNEXURE-I as per TECHNICAL SPECIFICATION NO: EPD-CPBG-TS-CPJ127, REV 00 (Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail