| 1 | Earthwork in excavation ( As per I.S 3114 /1965 for laying of different types and sizes of pipesso as to give one meter average cover over the socket of pipe with disposal of excavatedearthwithininitial lead and lift as per specification and direction of Engineer - in - Charge(b) As perclassification of soil item -B |
| 2 | Earth Work in excavation of foundation trenches as perdesign section in ordinarysoftrock(Videclassificationofsoilitem-C)anddisposalof excavatedmaterialssoobtained(50Nawayfromtheedgeofthe trenches) withinitialleadof150Mandinitial liftof1.5masper specification and direction ofE/I in ordinary of soft rock (where blasting isnot reqired ) Balance30% of total Earth work of taken classification soil item -C. |
| 3 | Supplyingtoolsandcuttingroadaswellrestoringthesameasperspecification and direction of E/I. |
| 4 | WaterboundMacadamroad(takenoutmaterialwillbeused) forcutting road as perreuirement . |
| 5 | Dismaitaling Plain cement or lime concrete workincluding stacking serviceable materials in countable stackswithin 15 meter lead and disposal of un- serviceable materials with all leads all complete as perdirection of E/I. |
| 6 | Providing PCC M-150 in nominal mix of (1:2:4) in foundation with approved qualityof stones chips20 mm -6 mm size graded and clean coarsesand of FM2.5 to 3.0 includingscreening shuttering mixing cement concretein mixer and placing in positionvibrating Striking cuiring taxes and royalty all complete as per building specification anddirectionof E/I. |
| 7 | Earth work in back fillingthe trenchesafter laying different typesand siesofpipeswithearthremovedduringexcavation withininitiallead andliftasper specificationanddesignofEngineer-in-charge(for |
| 8 | Supplyingcentrifugally cast(spun) ductileironpressure pipe for water supply withsocketandspigotendsconfirmingtoIS8329/2000 in standard lengths of class K-7 suitable for push on joint ( Rubber gasket jointing) with cement mortar liningon inside surfaceand out side zinc coatingwith bituminous paint includingall other taxes insurance carriagetoworksitewithloadingUnloadingetc.Includinginspection charges andall complete. |
| 9 | Supplying Labours Tools and Tackles for Testing of Lead CI or UPVC or HDPE or AC or DI pressure Pipe upto 60 m head of water all complete as per specification direction EI (Water to be supplied free of costdepartmentally) |
| 10 | Supplying labours , tools for laying and jointing HDPE pipes trenches and meking butt welded joint,supplying hitting mirror,jack etc.and providingnight guard , barrierand red lightto safeguard against accident all complete( Pipewill be supplied depatmentally free of cost)(MJP Sec.-I (IX)-2VII) |
| 11 | Labour Charge for one cutting of HDPE/UPVC/AC Pressure pipe & specials including supplying,necessary tools and plants ,chipping or filling the surface finish as per specification and direction of E/I. |
| 12 | Providing Double Flanged Sluice valve confirming for IS 2906/14846 including worm gear arrangements as per test pressure satainlesssteel , spindle , capsincluding all transportationetc. complete.(PN-1 without byepass arrangement.) with 10% CP. |
| 13 | Providing Double Flanged Sluice valve confirming for IS 2906/14846 including worm gear arrangements as per test pressuresatainlesssteel, spindle , capsincluding all transportationetc. complete.(PN-1 without byepass arrangement.)(for scour valve) |
| 14 | Supplying Labour and tools for fixing CI sluice valve trencheswitha pair of C.I Tail pairincluding making ) flangedjointsas perIS specification confirming to I.S.S 782-1978 confirming to I.S.S6557-1972 and nuts and boltsconfirming to I.S.S1364 -1983 ).Including drilling holes in flanged if required as per specificationand direction ofE/I .Sluice valve (90 mm dia (HDPE) |
| 15 | Scour Valve (100 mm dia) |
| 16 | Construction of B.W volve Masonary Chanber of size 1.2*0.9*1.5 |
| 17 | Providing, Installing and giving satifactory field testing of bulk water meter, horizontal inferential multihued type with mangetic drive and dry dial suitbale for abient 50 C temperature duly sealed against tampering complete with flanges at both ends and conforming to class B as per ISO 4064 along with manufacture\"s test certificate and guarantee certificate, including cost all materials and labour etc with OIML. MID certification for Abroad meter and FCRI for India including 36 Months guarantee etc complete. |
| 18 | Add GST 12% |
| 19 | Add Sub Tax 1% |