| 1 | 1.Strengthening to Melavasal kumarapuram paper mill road Malavasal Panchayat. |
| 2 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 A |
| 3 | Chanage 0/0 - 1/311 |
| 4 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 5 | Chanage 0/0 - 1/311 |
| 6 | Collection and supply of Gritty Gravel from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc.,complete Gravel for Berms |
| 7 | Chanage 0/0 - 1/0 |
| 8 | Chanage 0/0 - 1/311 |
| 9 | Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetalconsisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) |
| 10 | Chanage 0/0 - 1/0 |
| 11 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metreper 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification. |
| 12 | Chanage 0/0 - 1/0 |
| 13 | Chanage 0/0 - 1/311 |
| 14 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.40 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 15 | Chanage 0/0 - 1/0 |
| 16 | Chanage 0/0 - 1/311 |
| 17 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and.09cum of 6.70mm with 23.232 Kgs ofVG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .PCSC with Plastic waste using Paver |
| 18 | Chanage 0/0 - 1/0 |
| 19 | Chanage 0/0 - 1/311 |
| 20 | Supply and fixing ofName board RCC slab with Post |
| 21 | Provision for Sign board |
| 22 | Provision for KM Stone |
| 23 | Provision for HM Stone |
| 24 | 2.Strengthening to Paravakottai therkku theru road Paravakottai Panchyat |
| 25 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 A |
| 26 | Chanage 0/0 - 0/971 |
| 27 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 28 | Chanage 0/0 - 0/971 |
| 29 | Collection and supply of Gritty Gravel from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc.,complete Gravel for Berms |
| 30 | Chanage 0/0 - 0/971 |
| 31 | Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetalconsisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) |
| 32 | Chanage 0/0 - 0/971 |
| 33 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metreper 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification. |
| 34 | Chanage 0/0 - 0/971 |
| 35 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.40 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 36 | Chanage 0/0 - 0/971 |
| 37 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 38 | Chanage 0/0 - 0/971 |
| 39 | Supply and fixing ofName board RCC slab with Post |
| 40 | Provision for Sign board |
| 41 | Provision for HM Stone |
| 42 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |