}

Tourkhola and Multi villages piped water Supply Scheme for Block Dharampur District Mandi HP “Under Jal Jeevan Mission” (SH:- Preparation of Architectural Model for Tourkhola & Multi Villages Piped Water Supply Scheme for block Dharampur with Acrylic cove, Mandi-Himachal Pradesh

Irrigation And Public Health Department has published Tourkhola and Multi villages piped water Supply Scheme for Block Dharampur District Mandi HP “Under Jal Jeevan Mission” (SH:- Preparation of Architectural Model for Tourkhola & Multi Villages Piped Water Supply Scheme for block Dharampur with Acrylic cove. Submission Date for this Tender is 15-03-2022. Paint System Tenders in Mandi Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

31417328
Tourkhola and Multi villages piped water Supply Scheme for Block Dharampur District Mandi HP “Under Jal Jeevan Mission” (SH:- Preparation of Architectural Model for Tourkhola & Multi Villages Piped Water Supply Scheme for block Dharampur with Acrylic cove
Open Tender
Indian
Himachal Pradesh
Mandi
15-03-2022

Tender Details

Tourkhola and Multi villages piped water Supply Scheme for Block Dharampur District Mandi HP “Under Jal Jeevan Mission” (SH:- Preparation of Architectural Model for Tourkhola & Multi Villages Piped Water Supply Scheme for block Dharampur with Acrylic cover & iron stand for Model). -Tourkhola And Multi Villages Piped Water Supply Scheme For Block Dharampur District Mandi Hp Under Jal Jeevan Mission Preparation Of Architectural Model For Tourkhola And Multi Villages Piped Water Supply Scheme For Block Dharampur With Acrylic Cover And Iron Stand For Model , Racky Of The Area Under The Project Inquestion , Which Is Spreading Over 60 K.M Hilly, Semi Hilly And Plain Land With A View To See The Topographay Of The Area. The Racky Has To Be Done Before Starting The Job And Also During Preparation Of The Model Including Vehicle Charages Per Km As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Photography/Videography Of The Area Under The Project For Getting Artistical Vision Thereof As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Study Of The Topographical Contours Drawing With Techenical Expart Of The Department And There After Drawing The Plan Of The Scale Of The Complete Area Or The Project For The Perpose Of Makingthe Modle Accordingly As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Scope Of Work :- Wooden, Battens , Frame , Plymounted On Wooden Battens, Grooving In Battens For Holding Acrylic Cover As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Mouldsin Corks Sheet, Plaster Of Paris, Tharmocol, Clay Fiberglass Fabrication Of Project Model As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Tracing Of Drawing Of Contours On The Metiral To Be Moulded Forgetting The Accurate And Desiredshape Of The Contours As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , For Appliying Colours To The Final Product With Duco And Enamel Paints Forgetting The Natural And Best Contrasting Look With Spray Gun As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Final Demarcation Of The Project Pipe Line D/L Pump Houses , Canals , Roads,Towns ,Villages With Writing Metrials As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Final Layout Of Pump House And Pipe Line With Different Metrials Laborating Variuous Town Signs As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Details Of All The Main Line And Also The Distributories By Installing Led Circuits For Making & Showing The Whole Working Process, Including Flow Of Water As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Acryliccover In 5Mm Clear Acrylic Sheet Without Channels Providing The Clear Look Having Supports And Re-Enforcements Acrylic Strips For Its Strength Solid It Yand Beauty As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge. , Foriron Stand(Design Of Stand ) Planned According To The Weight And Size Of Model Which Is Properly Granded To Give The Neet Finish To The Stand. Black Colour Duco Paint Finish Is Given To The Height Adjustable Iron Stand As Per Direction And To The Entire Satisfaction Of Engineer-In-Charge.

Key Value

Document Fees
INR 250 /-
EMD
INR 15400.0 /-
Tender Value
INR 7.69 Lakhs /-

BOQ Items

Name of Work: Tourkhola and Multi villages piped water Supply Scheme for Block Dharampur District Mandi HP “Under Jal Jeevan Mission” (SH:- Preparation of Architectural Model for Tourkhola & Multi Villages Piped Water Supply Scheme for block Dharampur with Acrylic cover & iron stand for Model).
Sl. No. Item Description
1Racky of the Area under the Project inQuestion , which is spreading over 60 K.M hilly, Semi hilly and plain land with a view to see the topographay of the area. The racky has to be done before starting the job and also during preparation of the model including Vehicle charages per km as per direction and to the entire satisfaction of Engineer-in-Charge.
2Photography/videography of the area under the project for getting artistical vision thereof as per direction and to the entire satisfaction of Engineer-in-Charge.
3Study of the topographical contours drawing with Techenical expart of the department and there after Drawing the plan of the scale of the complete area or the project for the perpose of makingthe modle accordingly as per direction and to the entire satisfaction of Engineer-in-Charge.
4Scope of Work :- Wooden, Battens , Frame , Plymounted on Wooden Battens, Grooving in battens for holding acrylic cover as per direction and to the entire satisfaction of Engineer-in-Charge.
5Mouldsin Corks sheet, Plaster of paris, Tharmocol, Clay Fiberglass Fabrication of project model as per direction and to the entire satisfaction of Engineer-in-Charge.
6Tracing of Drawing of Contours on the metiral to be Moulded forgetting the accurate and desiredshape of the contours as per direction and to the entire satisfaction of Engineer-in-Charge.
7For appliying colours to the final product with Duco and Enamel Paints forgetting the natural and best contrasting look with Spray gun as per direction and to the entire satisfaction of Engineer-in-Charge.
8Final Demarcation of the project pipe line D/L Pump houses , Canals , Roads,Towns ,Villages with writing metrials as per direction and to the entire satisfaction of Engineer-in-Charge.
9Final layout of Pump house and pipe line with different metrials Laborating Variuous town signs as per direction and to the entire satisfaction of Engineer-in-Charge.
10Details of all the Main Line and also the Distributories by installing Led circuits for making & showing the whole working process, Including flow of Water as per direction and to the entire satisfaction of Engineer-in-Charge.
11AcrylicCover in 5MM clear Acrylic sheet without channels providing the clear look having supports and re-enforcements acrylic Strips for its Strength solid it yand beauty as per direction and to the entire satisfaction of Engineer-in-Charge.
12Foriron stand(Design of stand ) Planned according to the weight and size of model which is properly granded to give the neet finish to the stand. Black colour Duco Paint finish is given to the height adjustable iron stand as per direction and to the entire satisfaction of Engineer-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail