|
| 1 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming, (Transom), HSR11.73.1 |
| 2 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming, (Panel),HSR 11.73.1 |
| 3 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming (Duck Plate)HSR 11.73.1 |
| 4 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming (Base Plate) HSR 11.73.1 |
| 5 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming,(End Post M-F) HSR 11.73.1 |
| 6 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming, (Bracing Frame) HSR 11.73.1 |
| 7 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming, (Bearing Plate) HSR 11.73.1 |
| 8 | Applying priming coat:With ready mixed red oxide zinc chromate primer of approvedbrand and manufacture on steel galvanised iron/ steel works,HSR 11.68.3 |
| 9 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming, HSR 11.73.1 |
| 10 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases, including use of, HSR 13.29.1 |
| 11 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying apriming coat of approved steel primer all complete, HSR 13.28 |
| 12 | Bolts and nuts up to 300 mm in length, HSRB0042 |
| 13 | Repairing/Removing Bend in Transom, ( Transom) NS |
| 14 | Repair of Transom Clamp/Nut with thread cutting, (TransomClamp) NS |
| 15 | Repair of Seway Brace Nut with thread cutting, (Seway Brace) NS |
| 16 | Repair of coard Bolt Nut with thread cutting, (Coard Bolt) NS |
| 17 | Repair of duck Bolt Nut/washers with thread cutting, ( Duck Plate Bolt & washer) NS |
| 18 | Repair of panel pin with lathe work/maching, (Panel Pin) NS |
| 19 | LS Provision of crane/transportation for repair, fabrication &stacking Work one hour on 2 feet ( 250/2=125hrs) (Crane etc.) NS |