Providing Drilling Of Borewell 2Nos With Erection Of Motor At Idayangulam Road And Construction Of 30000Ltr Sump And Extension Of Pipe Line At Kallangudi Village In Kallangudi Panchayat Providing Drilling Of Borewell 2Nos With Erection Of Motor At Idayang
Tender Overview
Project Description
Providing Drilling Of Borewell 2Nos With Erection Of Motor At Idayangulam Road And Construction Of 30000Ltr Sump And Extension Of Pipe Line At Kallangudi Village In Kallangudi Panchayat Providing Drilling Of Borewell 2Nos With Erection Of Motor At Idayangulam Road And Construction Of 30000Ltr Sump And Extension Of Pipe Line At Kallangudi Village In Kallangudi Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | ProvidingDrilling of Borewell(2Nos)with Erection of Motor At Idayangulam road andConstruction of 30000ltr sump&Extension of pipe lineat Kallangudi Village inKallangudiPanchayat |
| 2 | Drilling of Borewell including transportation charges in all soils by taking pilot Bore of 150mm an then enlarged to the required dia by direct hand pump clay drill clrculation method in Sivagangai District of Tamil Nadu at place shown by the Department Officers as directed.Drilling of 150mm dia pilot Bore uptoM depth ground belwo |
| 3 | Drilling ofpilot bore 150mm dia0M up to60 m depth |
| 4 | Drilling ofpilot bore 150mm dia60M up to90m depth |
| 5 | Reaming 140/150mm diapilot Boreto 300dia boreas directed by the TWAD Board officer |
| 6 | 0m to 60m |
| 7 | 60m to 90m |
| 8 | Labour charges for inserting the casing pipes assembly with or without sloe hole including welding the joijts for M.S. casing pipes and PVC coupler joint for PVC casing pipes etc., complete and supplying and packing the annualar space with pebbles Etc. Complete., |
| 9 | 150mm Dia Pipe |
| 10 | Charges for development of borewell with aircompressor of 600CFM required capacity (minimum 8 hours) including transportation labour and fuel charges for compressor and conducted Yield test by \"V\" Notch Method |
| 11 | Supply of 150MMNominal dia PVC plain pipe (ISI Blue pipe ) CM |
| 12 | Supply of 150MMNominal dia PVC slottedpipe (ISI Blue pipe ) CM |
| 13 | Construction ofPedestal -kisok |
| 14 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20 B |
| 15 | filling with good river sandincluding all cost & conveyance of all materials to site & all labour charges etc complete |
| 16 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete |
| 17 | Brick work in cm 1: 5 using c.Bricksincluding all cost & conveyance of all materials to site & all labour charges etc complete |
| 18 | Centering Shuttering and soffits of concrete items including all charges etc completed |
| 19 | Supplying fabrication and placing in position of steel rod for reinforcement including cost of steel binding wire etccompleted |
| 20 | RCC 1:1,5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete |
| 21 | Plastering in cm 1: 5;12mm thickincluding all cost & conveyance of all materials to site & all labour charges etc complete |
| 22 | Paintig Two Coats with approved Quality of Exterior Emulsion Paint over wall surface including cleaning, scrapping and preparing the surface,curing Etc. Complete |
| 23 | Erection of Power pump -Borewell -2Nos |
| 24 | Supply &delivery ofvertical typesubmersible 5.00 HP pumpset of discharge 50 lpm against a total head of 175 m suitable for borewellconformingto IS 8034/2002 and as amendedfromtime to time with ISI markwith all asccessoriesand suitable panel Boards |
| 25 | Dust proof powder coated MV panel board of 18 SWG MS sheet and MS angle iron frame work with hinged front doors and fixed sides with locking arrangements ,provision for cable entry and twin earthing complete as per IE Rules (3 Phase DOL panel board |
| 26 | Supply and delivery of the following size of GI and PVC specials as per IS specification |
| 27 | 50mmUPVC -BorewellPipe |
| 28 | 50mm GIUnion with washer |
| 29 | 50mm GIcoupling |
| 30 | 50mmGI Elbow |
| 31 | 50mm GM Non return valve |
| 32 | 50mm GM Gate valve |
| 33 | 50mmHex Nipple |
| 34 | Supply and delivery of 4sqrm PVC copper flat submersible cable |
| 35 | Labour charges for erection of 5.00 HP submersible pumpset in Borewell including fixing and jointing of submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps pressure guage upto the exterior wall of the pumproom and erection of the Board consisting of TPICN switch starter volt meter ammeter, 3 pilot (indicating) capacitor, single phasing preventor water level guard and laying and jointing the cable and twin earthing as per IE rules etc. complete and testing the pumpset on trail run for 3 days including signing the completion reports as required by EB authorities. (P.No:243)S.I.N0. 17 |
| 36 | Erection of Power pump - Sump |
| 37 | Supply &delivery ofvertical typesubmersible 5.00 HP pumpset of discharge 350 lpm against a total head of 50 m suitable for borewellconformingto IS 8034/2002 and as amendedfromtime to time with ISI markwith all asccessoriesand suitable panel Boards |
| 38 | Dust proof powder coated MV panel board of 18 SWG MS sheet and MS angle iron frame work with hinged front doors and fixed sides with locking arrangements ,provision for cable entry and twin earthing complete as per IE Rules (3 Phase DOL panel board |
| 39 | Supply and delivery of the following size of GI and PVC specials as per IS specification |
| 40 | 50mmUPVC -BorewellPipe |
| 41 | 50mm GIUnion with washer |
| 42 | 50mm GIcoupling |
| 43 | 50mmGI Elbow |
| 44 | 50mm GM Non return valve |
| 45 | 50mm GM Gate valve |
| 46 | 50mmHex Nipple |
| 47 | Supply and delivery of 4sqrm PVC copper flat submersible cable |
| 48 | Labour charges for erection of 5.00 HP submersible pumpset in Borewell including fixing and jointing of submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps pressure guage upto the exterior wall of the pumproom and erection of the Board consisting of TPICN switch starter volt meter ammeter, 3 pilot (indicating) capacitor, single phasing preventor water level guard and laying and jointing the cable and twin earthing as per IE rules etc. complete and testing the pumpset on trail run for 3 days including signing the completion reports as required by EB authorities. (P.No:243)S.I.N0. 17 |
| 49 | Extension of Pipe Line |
| 50 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for Pipe line |
| 51 | Supply and Delivery 63mm dia HDPE pipe PN 6 |
| 52 | Lowering of 63mm HDPE pipe and specials to trench and laying proper grade and Alignment and as directed by the TWAD officers |
| 53 | Refilling With Excavated earth including all labour charges and etc…….complete |
| 54 | Construction of 30000ltr OHT |
| 55 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20 B |
| 56 | filling with good river sandincluding all cost & conveyance of all materials to site & all labour charges etc complete |
| 57 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete |
| 58 | RCC 1:1,5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete |
| 59 | Centering Shuttering and soffits of concrete items including all charges etc completed |
| 60 | Paintig Two Coats with approved Quality of Exterior Emulsion Paint over wall surface including cleaning, scrapping and preparing the surface,curing Etc. Complete |
| 61 | Supplying fabrication and placing in position of steel rod for reinforcement including cost of steel binding wire etccompleted |
| 62 | Provision for pipe connection arrangements |
| 63 | 50mm G.I. Pipe (Two delivery) |
| 64 | 50mm G.I. Union |
| 65 | 50mm GI Elbow |
| 66 | 50mm G.I. Gate valve |
| 67 | 50mm G.I.Non Return valve |
| 68 | Refilling foundation with excavated earth including labour charges etc |
| 69 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender