Water Resources and Irrigation Government Departments Closing in 0 days TDR #31373515

Construction Of Vr Bridge At Rd 82150 Loharu Canal Construction Of Vr Bridge At Rd 82150 Loharu Canal

Issued by Government Departments · loharu, Haryana
Tender Value
1.09 Crore
Estimated cost
Bid Submission
15 Mar 2022
0 days left
EMD
2.18 Lakhs
Bank guarantee accepted
Document Fee
15000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
loharu → Haryana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Vr Bridge At Rd 82150 Loharu Canal Construction Of Vr Bridge At Rd 82150 Loharu Canal

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 15-Mar-2022 Tender should be considered Qtl instead of KG Financial Bid 15-Mar-2022

BOQ

Name of Work: Estimate for Construction of VR bridge at RD 821580 Loharu Canal
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil as directed, within a lead of 50 m. completed as per item 4.14.1
2Dressing bed and preparation of sub grade for lining/concrete by mechanical/manual means HSR No.14.1
3Brick work in 1:3 (cement 3 course and, mortar with common burnt clay non-modular bricks with common burnt clay non-modular bricks of class designatiion 7.5 in foundation and plinth compleate as per HSR 15.61
4Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth.1.5 m in width as well as 10 sqm on plan) including getting out and desposal
5Providing and laying in position ready mixed plain Cum cement concrete M-15, with cement content as per approved design mix and manufactured in fully automattic batching plant and transported to site of work in transit mixer for all leads, having continuousatitated mixer, manufactured as per mix design of specifiedgrade for plain cement concrete work, including pumping of R.M.C from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate\ retard setting of concrete, improve work ability without impairing strength ans improve as per direction ofthe Engineer- in- charge( note:- less cement used asper design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix for sleepers). M-15 grade plain cement content as per HSR No. 6.22.1.2
6Providing and laying in position ready mixed M-25 grade concretefor reinforced cement concrete work, using cement content as per approved design mix, manutactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous atitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the c ost of centering, shuttering finishing and reinforcement, including cost of admictures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairinig strength and durability as per direction of the Engineer-in-charge. All works above plinth level up to floor IV level as per HSR No. 6.25.1
7Pr0viding and laying in position ready mixed M-20 grade concretefor reinforced cement concrete work, using cement content as per approved design mix, manutactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous atitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the c ost of centering, shuttering finishing and reinforcement, including cost of admictures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairinig strength and durability as per direction of the Engineer-in-charge. All works above plinth level up to floor IV level as per HSR No. 6.22.1
8Steel reinforcement of thermo mechanically threaded bars of graded Fee - 500D for RCC w ork, where not included in the complete rate of RCC i/c straightening, cutting bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wires etc. complete in all respect above plinth level as per HSR No. 6.33.6
9Centering and shuttering I/c strutting, proping and Sqm removal of form work for foundation, footing and bases of colomns etc. complete as per HSR No. 6.29.1
10Centering and shuttering including strutting, propping etc. And removal of form work for Retaining walls, return walls, I/c atached pilasters, buttresses, plinth and string courses, fillet kerbs and steps etc. as per HSR No. 6.29.2
11Centering ans Shuttering i/c proping ans removal of form work for roof, landing etc. complete as per HSR No. 6.30.3
12Filling Construction joints, with special impervious hot pour, 12.5 mm wide as HSR No. 14.18
13Providing and laying 80 mm thick factory made cement concrete inter locking paver block of M- 35 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over ( BIS 15658:2006) and including 60 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in charge HSR No. 10.77
14Dismantling of brick masonry laid in cement sand mortar manually/by machanical means i/c stacking serviceable materials and disposal of unserviceable material with in 50 mtr lead or as per direction of enginner incharge complete as per HSR No. 5.7.4
15Demolishing R.C.C work manually/by machanical means i/c stacking serviceable materials and disposal of unserviceable material with in 50 mtr lead or as per direction of enginner incharge complete as per HSR No. 5.25
16Demolishing Cement concrete 1:2:4 or leaner (i/c equalent design mix) manually/by mechanical means including disposal of material within50 mtr lead or as per direction of enginner incharge complete as per HSR No. 5.23.2
17Finishing walls with textured exterior paint of required shade. New work ( Two or more coats applied HSR No. 11.94
18Brickwork in 1:4 ( 1 cement 4 course sand) mortar with common burnt clay non- modular bricks of class designation 7.5 in foundation and plinth complete as per HSR 7.21.1
19Brickwork in 1:4 ( 1 cement 4 course sand) mortar with common burnt clay non- modular bricks of class designation 7.5 in foundation and plinth complete as per HSR 7.21.1
20Providing and laying dry brick on edge flooring in required pattern wiith bricks of class desigantion 7.5 on bed of 12 mm ud mortar, including fillinf joints with Jamuna sand, with common burnt clay non modular bricks compleate as per HSR No. 10.34
21Providing lovering, laying,cutting (cut surface to be uniformly finished) joiting with rubber rings marked with IS: 5382 and testing of SPIGOT AND SOCKETTED RDD, NP2 MARKED WITH IS: 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling,re handling etc. complete is all respects to the satisfaction to the Engineer-in-charge complete as per HSR 20.62.13 for 1200 mm dia
22Excavating, supplying and filling of local earth (including royalty by mechanical transport up to a lead of 1 km also including ramming and watering fo the earth in layers not exceedibng 20 cm in trenches, plinth, sides of foundation etc. complete as per HSR 4.33
23Filling available excavated earth(excluding rock) in trenches, plinth, sides of fouyndations etc in layers not excedding 20 cm in depth, consoluidating each deposited layer by raming and watering, lead upto 50 m and lift upto 105 mtr
24Removing hume pipes NP 2/NP 3/NP 4 including excavation and taiking out the pieps mnanually by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge above 600 mm dia as per HSR item 5.5.2
25demolshing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 mtr lead complete as per HSR 5.6
26Credit for Dismantelled brick masonry
27Credit for old 1200 mm dia RCC pipe NP 2
28Credit for old steel bars
29credit of earth

AI Tender Summary

OUR REF NO 31373515
AUTHORITY Government Departments
TENDER VALUE 1.09 Crore
LAST DATE 15-03-2022
Authority
Authority Name Irrigation Department
Work Description Construction Of Vr Bridge At Rd 82150 Loharu Canal Construction Of Vr Bridge At Rd 82150 Loharu Canal
Basic Detail
Tender No 2510/16A/A1-A20
Bidding Type Tender
Location
City loharu
State Haryana
Key Dates
Publish Date 08 Mar 2022
Submission Date 15 Mar 2022
Open Date 16 Mar 2022
Finance
Tender Value 1.09 Crore
Tender Fee 15000
EMD 2.18 Lakhs
Exemption Not Available
Document List
b8f07a7a-e24e-4d63-9d8f-4ae57468ce08.html
bid7.pdf
BOQ_277245.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 08, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 15, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 16, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b8f07a7a-e24e-4d63-9d8f-4ae57468ce08.html

pdf

bid7.pdf

xls

BOQ_277245.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders