Civil And Structural Works For Providing Approach Path To Tank Farms From Peripheral Roads And To Provide Jump Over At Tank Farms In Bongaigaon Refinery, Iocl, dhaligaon-Assam

Indian Oil Corporation Limited-IOCL has published Civil And Structural Works For Providing Approach Path To Tank Farms From Peripheral Roads And To Provide Jump Over At Tank Farms In Bongaigaon Refinery, Iocl. Submission Date for this Tender is 21-03-2022. Road Work Tenders in dhaligaon Assam. Bidders can get complete Tender details and download the document.




Tender Notice

31362742
Civil And Structural Works For Providing Approach Path To Tank Farms From Peripheral Roads And To Provide Jump Over At Tank Farms In Bongaigaon Refinery, Iocl
Open Tender
Indian
Assam
dhaligaon
21-03-2022

Tender Details

Civil And Structural Works For Providing Approach Path To Tank Farms From Peripheral Roads And To Provide Jump Over At Tank Farms In Bongaigaon Refinery, Iocl

Key Value

Document Fees
Refer document
EMD
INR 34250.0 /-
Tender Value
INR 34.21 Lakhs /-

BOQ Items

Name of Work: Civil and Structural works for providing approach path to tank farms from peripheral roads and to provide jump over at tank farms in Bongaigaon Refinery, IOCL
Sl. No. Item Description
1Civil Jobs for approach path, Full GST
2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
3In cement mortar.
4Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
5Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge:
6Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
7Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
8Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.
9Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed : All kinds of soil.
10Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed :All kinds of soil.
11Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.
12Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered):
13Depth not exceeding 1.5 m.
14Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered) :
15Depth not exceeding 1.5 m.
16Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
17Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
18Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m: All kinds of soil.
19Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
20Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material:
21Beyond 30 cm girth up to and including 60 cm girth.
22Beyond 60 cm girth up to and including 120 cm girth.
23Beyond 120 cm girth up to and including 240 cm girth.
24Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.
25Supply of tractor with trailer on hire charges for 08 hours per day including rendering the services of 4 labourers, driver, fuel and other consumables, tools, tackles etc. for transportation of rubbish/ waste materials completeas per directions of Engineer-in-Charge.(8 hoursworking period of one tractor is considered as onetractor day). Unit "EACH" (EA) stands for One tractor day.
26Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - Cement shall be free issue material. All work up to plinth level :
271:3:6 (1 Cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).
28Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (Cement shall be free issue material).
291:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
30Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :
311:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
32Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level:
33Thermo-Mechanically Treated bars.
34Centering and shuttering including strutting, propping etc. and removal of form for :
35Foundations, footings, bases of columns, etc. for mass concrete.
36Lintels, beams, plinth beams, girders, bressumers and cantilevers.
37Columns, Pillars, Piers, Abutments, Posts and Struts.
38Brick work withcommon burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (cement shall be free issue material).
39Cement mortar 1:6 (1 cement : 6 coarse sand).
40Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : (cement shall be free issue material).
41Cement mortar 1:6 (1 cement : 6 coarse sand).
42Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in: (cement shall be free issue material).
43Cement mortar 1:4 (1 cement : 4 coarse sand).
44Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level: (cement shall be free issue material).
45Cement mortar 1:4 (1 cement :4 coarse sand).
46Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar including filling the joints with same mortarwith common burnt clay F.P.S. (non modular) bricks: (Cement shall be free issue material):
471:4 (1 cement : 4 coarse sand).
4812 mm cement plaster of mix : (cement shall be free issue material).
491:4 (1 cement: 4 fine sand).
5015 mm cement plaster on the rough side of single or half brick wall of mix(Cement shall be free issue material):
511:6 (1 cement: 6 fine sand).
52Neat cement punning. Cement shall be free issue material.
53Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead (Cement shall be free issue material):
54With cement mortar 1:4 (1 cement : 4 fine sand).
55Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
56Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
57Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required:
58In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
59In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
60Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer:
61M.S. tube.
62Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:
63Hot finished welded type tubes.
64Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
65Providing and fixing bolts including nuts and washers complete.
66Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface - Water thinnable cement primer.
67Finishing walls with water proofing cement paint of required shade-New work (Two or more coats applied @ 3.84 kg/10 sqm).
68Finishing walls with water proofing cement paint of required shade :
69Old work (one or more coats @ 2.20 kg/10 sqm) complete.
70Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade- New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).
71Applying priming coat :
72With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.
73Painting with synthetic enamel paint of approved brand and manufacture to give an even shade-Two or more coats on new work.
74Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
75BUNDING WITH SAND FILLED BAGS: Bunding with sand filled empty cement bags (50Kg capacity) for maintaining and diverting the flow of water, for arresting breaches or making bunds, protection walls etc.whereverrequired as per the direction of Engineer-in-Charge including filling sand and stitching the bags, carting tothe site of work to any distance, keeping in position as directed, plugging holes, pading etc with all labour, materials, tools, plants etc. allcomplete. (Minimum 80% volume of bag to be filled with sand). Sand and empty cement bags to be supplied by the contractor.
76Chipping of unsound/ weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-in-charge:
7750 mm average thickness.
7825 mm average thickness.
79DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. Removal of existing platforms / pipe supports / davits / stairways etc. along with adjacent fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the ground, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
80DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC.
81Civil Jobs for approach path, Prop. GST
82Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
83In cement mortar.
84Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
85Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge:
86Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
87Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
88Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.
89Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed : All kinds of soil.
90Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed :All kinds of soil.
91Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.
92Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered):
93Depth not exceeding 1.5 m.
94Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered) :
95Depth not exceeding 1.5 m.
96Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
97Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
98Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m: All kinds of soil.
99Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
100Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material:
101Beyond 30 cm girth up to and including 60 cm girth.
102Beyond 60 cm girth up to and including 120 cm girth.
103Beyond 120 cm girth up to and including 240 cm girth.
104Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.
105Supply of tractor with trailer on hire charges for 08 hours per day including rendering the services of 4 labourers, driver, fuel and other consumables, tools, tackles etc. for transportation of rubbish/ waste materials completeas per directions of Engineer-in-Charge.(8 hoursworking period of one tractor is considered as onetractor day). Unit "EACH" (EA) stands for One tractor day.
106Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - Cement shall be free issue material. All work up to plinth level :
1071:3:6 (1 Cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).
108Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (Cement shall be free issue material).
1091:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
110Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :
1111:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
112Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level:
113Thermo-Mechanically Treated bars.
114Centering and shuttering including strutting, propping etc. and removal of form for :
115Foundations, footings, bases of columns, etc. for mass concrete.
116Lintels, beams, plinth beams, girders, bressumers and cantilevers.
117Columns, Pillars, Piers, Abutments, Posts and Struts.
118Brick work withcommon burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (cement shall be free issue material).
119Cement mortar 1:6 (1 cement : 6 coarse sand).
120Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : (cement shall be free issue material).
121Cement mortar 1:6 (1 cement : 6 coarse sand).
122Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in: (cement shall be free issue material).
123Cement mortar 1:4 (1 cement : 4 coarse sand).
124Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level: (cement shall be free issue material).
125Cement mortar 1:4 (1 cement :4 coarse sand).
126Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar including filling the joints with same mortarwith common burnt clay F.P.S. (non modular) bricks: (Cement shall be free issue material):
1271:4 (1 cement : 4 coarse sand).
12812 mm cement plaster of mix : (cement shall be free issue material).
1291:4 (1 cement: 4 fine sand).
13015 mm cement plaster on the rough side of single or half brick wall of mix(Cement shall be free issue material):
1311:6 (1 cement: 6 fine sand).
132Neat cement punning. Cement shall be free issue material.
133Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead (Cement shall be free issue material):
134With cement mortar 1:4 (1 cement : 4 fine sand).
135Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
136Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
137Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required:
138In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
139In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
140Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer:
141M.S. tube.
142Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:
143Hot finished welded type tubes.
144Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
145Providing and fixing bolts including nuts and washers complete.
146Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface - Water thinnable cement primer.
147Finishing walls with water proofing cement paint of required shade-New work (Two or more coats applied @ 3.84 kg/10 sqm).
148Finishing walls with water proofing cement paint of required shade :
149Old work (one or more coats @ 2.20 kg/10 sqm) complete.
150Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade- New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).
151Applying priming coat :
152With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.
153Painting with synthetic enamel paint of approved brand and manufacture to give an even shade-Two or more coats on new work.
154Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
155BUNDING WITH SAND FILLED BAGS: Bunding with sand filled empty cement bags (50Kg capacity) for maintaining and diverting the flow of water, for arresting breaches or making bunds, protection walls etc.whereverrequired as per the direction of Engineer-in-Charge including filling sand and stitching the bags, carting tothe site of work to any distance, keeping in position as directed, plugging holes, pading etc with all labour, materials, tools, plants etc. allcomplete. (Minimum 80% volume of bag to be filled with sand). Sand and empty cement bags to be supplied by the contractor.
156Chipping of unsound/ weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-in-charge:
15750 mm average thickness.
15825 mm average thickness.
159DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. Removal of existing platforms / pipe supports / davits / stairways etc. along with adjacent fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the ground, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
160DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC.
161Civil Jobs for approach path, Non-GST
162Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
163In cement mortar.
164Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
165Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge:
166Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
167Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
168Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.
169Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed : All kinds of soil.
170Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed :All kinds of soil.
171Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.
172Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered):
173Depth not exceeding 1.5 m.
174Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered) :
175Depth not exceeding 1.5 m.
176Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
177Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
178Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m: All kinds of soil.
179Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
180Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material:
181Beyond 30 cm girth up to and including 60 cm girth.
182Beyond 60 cm girth up to and including 120 cm girth.
183Beyond 120 cm girth up to and including 240 cm girth.
184Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.
185Supply of tractor with trailer on hire charges for 08 hours per day including rendering the services of 4 labourers, driver, fuel and other consumables, tools, tackles etc. for transportation of rubbish/ waste materials completeas per directions of Engineer-in-Charge.(8 hoursworking period of one tractor is considered as onetractor day). Unit "EACH" (EA) stands for One tractor day.
186Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - Cement shall be free issue material. All work up to plinth level :
1871:3:6 (1 Cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).
188Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (Cement shall be free issue material).
1891:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
190Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :
1911:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
192Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level:
193Thermo-Mechanically Treated bars.
194Centering and shuttering including strutting, propping etc. and removal of form for :
195Foundations, footings, bases of columns, etc. for mass concrete.
196Lintels, beams, plinth beams, girders, bressumers and cantilevers.
197Columns, Pillars, Piers, Abutments, Posts and Struts.
198Brick work withcommon burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (cement shall be free issue material).
199Cement mortar 1:6 (1 cement : 6 coarse sand).
200Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : (cement shall be free issue material).
201Cement mortar 1:6 (1 cement : 6 coarse sand).
202Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in: (cement shall be free issue material).
203Cement mortar 1:4 (1 cement : 4 coarse sand).
204Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level: (cement shall be free issue material).
205Cement mortar 1:4 (1 cement :4 coarse sand).
206Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar including filling the joints with same mortarwith common burnt clay F.P.S. (non modular) bricks: (Cement shall be free issue material):
2071:4 (1 cement : 4 coarse sand).
20812 mm cement plaster of mix : (cement shall be free issue material).
2091:4 (1 cement: 4 fine sand).
21015 mm cement plaster on the rough side of single or half brick wall of mix(Cement shall be free issue material):
2111:6 (1 cement: 6 fine sand).
212Neat cement punning. Cement shall be free issue material.
213Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead (Cement shall be free issue material):
214With cement mortar 1:4 (1 cement : 4 fine sand).
215Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
216Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
217Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required:
218In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
219In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
220Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer:
221M.S. tube.
222Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:
223Hot finished welded type tubes.
224Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
225Providing and fixing bolts including nuts and washers complete.
226Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface - Water thinnable cement primer.
227Finishing walls with water proofing cement paint of required shade-New work (Two or more coats applied @ 3.84 kg/10 sqm).
228Finishing walls with water proofing cement paint of required shade :
229Old work (one or more coats @ 2.20 kg/10 sqm) complete.
230Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade- New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).
231Applying priming coat :
232With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.
233Painting with synthetic enamel paint of approved brand and manufacture to give an even shade-Two or more coats on new work.
234Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
235BUNDING WITH SAND FILLED BAGS: Bunding with sand filled empty cement bags (50Kg capacity) for maintaining and diverting the flow of water, for arresting breaches or making bunds, protection walls etc.whereverrequired as per the direction of Engineer-in-Charge including filling sand and stitching the bags, carting tothe site of work to any distance, keeping in position as directed, plugging holes, pading etc with all labour, materials, tools, plants etc. allcomplete. (Minimum 80% volume of bag to be filled with sand). Sand and empty cement bags to be supplied by the contractor.
236Chipping of unsound/ weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-in-charge:
23750 mm average thickness.
23825 mm average thickness.
239DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. Removal of existing platforms / pipe supports / davits / stairways etc. along with adjacent fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the ground, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.
240DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail