Ash Dyke Pollution Control Measures Wetting The Road Top Surfaces Of The Existing Primary Pond_Ii And Secondary Pond For Dust Suppression By Sprinkling Water For A Period Of Ninety Days From The Date Of Commencement Of Work Ash Dyke Pollution Control Meas
Tender Overview
Project Description
Ash Dyke Pollution Control Measures Wetting The Road Top Surfaces Of The Existing Primary Pond_Ii And Secondary Pond For Dust Suppression By Sprinkling Water For A Period Of Ninety Days From The Date Of Commencement Of Work Ash Dyke Pollution Control Measures Wetting The Road Top Surfaces Of The Existing Primary Pond_Ii And Secondary Pond For Dust Suppression By Sprinkling Water For A Period Of Ninety Days From The Date Of Commencement Of Work
BOQ
| Sl. No. | Item Description |
| 1 | Wetting the road top surface of the existing Primary Pond–II and Secondary Pond for dust suppression by sprinkling water including levelling the road undulations for a period of ninety daysfrom the date of commencement of work rate including cost of all labour, hire charges for tractor and pump, driver batta cost of diesel and engine oil with all lead, lift and for other safety precaution etc., complete. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender