Work Contract For Rural Rasipuram Subdivision Work Contract For Rural Rasipuram Subdivision
Tender Value
10 Lakhs
Estimated cost
Bid Submission
14 Mar 2022
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
rasipuram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Work Contract For Rural Rasipuram Subdivision Work Contract For Rural Rasipuram Subdivision
BOQ
| Sl. No. | Item Description |
| 1 | Extension works: |
| 2 | Excavation of Pole pit upto 27\"(8.0M) Poles |
| 3 | Excavation and Erection of Stay pit 4.5\" to 5\" depth |
| 4 | Excavation of Pole pit upto 30\"(9.14M) Poles |
| 5 | Excavation of Pole pit above30\"(9.14M) Poles |
| 6 | Hardrockwithoutblasting(Wherehousesare located) |
| 7 | Mediumrockanddensemediumrockrequires blasting |
| 8 | Erection of RCC /PSC Poles/Metal poles upto 8.0M (27\") |
| 9 | Erection of RCC /PSC Poles/Metal poles upto 9.14M (30\") |
| 10 | Erection of RSJ,Rail,Fabricated poles above 30\"-0 (9.14M)\" |
| 11 | Erection of RSJ,Rail,Fabricated poles above 36\"-0\" |
| 12 | Fixing of 4 1/2\" HT \"V\" X arms/Channel X arms/Guarding X arms |
| 13 | Fixing of LT 3 ? X arm |
| 14 | Fixing of LT 1 ? X arms |
| 15 | Fixing of HT/LT TI Fittings |
| 16 | Fixing of 22KV Pin Insulator with Pin |
| 17 | Fixing of HT 11 KV Strain disc with metal parts |
| 18 | Fixing of LT Pin insulators |
| 19 | Fixing of LT Shackle with strapset |
| 20 | Fixing ofAluminium knob |
| 21 | Earthing of pole includinglooping, binding,coiling and burying |
| 22 | Earthing of Addl. X arms |
| 23 | Paving of Conductor of ACSR 7/3.35 & AAAC 7/3.15 mm |
| 24 | Paving of Conductor of ACSR 7/2.59 mm /AAAC 7/2.50 mm & ACSR 7/2.11mm |
| 25 | Painting of Metal poles including cross arms (Single coating) |
| 26 | Colouring of poles |
| 27 | Massconcreting (Concreting of poles with size 2\"x2\"x6\" including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along Sleeve concreting and plastering of concrete with ratio 1:2 ) |
| 28 | b. Sleeveconcreting including materials (Cement 1/2 bag + sand and Blue metals and watering) |
| 29 | Base Concreting (1.5\" X 1.5\" x 1/4\" including cost of jelly, Sand and Cement (With supply) ) |
| 30 | Stay Concreting (Concreting of stay with size 1.5\"x1.5\"x 3\" including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2 ) |
| 31 | Flat Guarding(with 2 M interval of lays) |
| 32 | HT Guarding |
| 33 | Transport of poles/Materials/Conductors Below 8 Kms |
| 34 | Transport of poles/Materials/Conductors Above 8 Kms for Addl.Kms |
| 35 | Loading of PSC pole 24\" & 27\" |
| 36 | Loading of RCC pole up to 8 mtr(27\") and metal poles of all sizes |
| 37 | Loading of PSC pole 9.0 mtr pole (300Kg) |
| 38 | Loading of PSC pole 9.0 mtr pole (400Kg) |
| 39 | Loading of RCC 9.14 mtr pole |
| 40 | Un Loading of PSC pole 24\" & 27\" |
| 41 | Un Loading of RCC pole up to 8 mtr(27\") and metal poles of all sizes |
| 42 | Un Loading of PSC pole 9.0 mtr pole (300Kg) |
| 43 | Loading of PSC pole 9.0 mtr pole (400Kg) |
| 44 | Un Loading of RCC above 9 mtr pole |
| 45 | Loading of Cement bag of 50 Kg |
| 46 | Unloading of Cement bag of 50 Kg |
| 47 | Loading of Transformer oil drum with Oil 200 Lit. capacity |
| 48 | Unloading of Transformer oil drum with Oil 200 Lit. capacity |
| 49 | Transporting of poles from road side to pole pit including loading and unloading of poles upto 27\"-0\" |
| 50 | Transporting of poles from road side to pole pit including loading and unloading of poles 30\" and above including R.S.Joists poles |
| 51 | Erection of Transformer Loading and Unloading of Transformer upto 200 KVA for each |
| 52 | Erection of New Transformer upto 200 KVA |
| 53 | Replacement of failed Transformers upto 200 KVA Dismantling & erection |
| 54 | Loading & Erection of HT Metering set |
| 55 | Resagging of conductor (LT) |
| 56 | Resagging (HT) conductor ACSR 7/2.59mm |
| 57 | Resagging (HT) conductorof ACSR 7/3.35 mm |
| 58 | Erection of Street light including fixture fitting |
| 59 | Erection of Street light service |
| 60 | Fixing of new LED lamp fittings |
| 61 | Releasing of grills from RCC poles |
| 62 | Releasing of Single phase service wire and refixing |
| 63 | Releasing of three phase service wire (up to 50 KW) and refixing |
| 64 | Releasing of three phase service (above 50 KW) and refixing |
| 65 | Labour charges fixing of special Type clamps for rail poles, RS Joists,Tubulator pole special clamps for Distribution Transformer Structure |
| 66 | Colour washing/Painting RCC pole |
| 67 | Alteration of Back clamp |
| 68 | Alteration of Stay clamp |
| 69 | Erection of new earth pipe by replacing the corroded earth pipe |
| 70 | Bruning of Coconut tree branches |
| 71 | Drilling of hole in channel only 3/4\" & 1\" per hole |
| 72 | Cutting of plate |
| 73 | Cutting of chennel |
| 74 | Cutting of Angle |
| 75 | Cutting of pipe |
| 76 | Excavation of structure pole Pits 3\"X3\"x6\" Nos |
| 77 | Transporting of pole to pit location 2 nos. |
| 78 | Erection of poles 2 Nos |
| 79 | Excavation and Erection of stay pit 2 Nos |
| 80 | Mass concreting2 Nos. |
| 81 | Base concreting 2 Nos |
| 82 | Stay concreting 2 Nos |
| 83 | Top channel 1 set |
| 84 | Bed channel 1 set |
| 85 | Cross with stud for bed channel |
| 86 | Belting angle and H.G.Fuse Angle |
| 87 | Erection of A.B.Switch |
| 88 | Erection of H.G.Fuse set complete |
| 89 | Structure earthing complete the pits and earth- tubes and 3 pipes completed |
| 90 | Bus bar arrangements per structure |
| 91 | Feeding arrangementswith open type fuse unit for two feeders |
| 92 | HT/LT LAS fixing and jumpering complete |
| 93 | Fixing of support insulator angle and erection of 3 Nos. Pin insulators |
| 94 | H.T Jumpering complete |
| 95 | Excavation of Structure pole pits - 2 Nos |
| 96 | Erection of poles |
| 97 | Transporting of poles from road side to pit |
| 98 | Erection and erection of stay pits 2 Nos |
| 99 | Erection of Structure materials |
| 100 | Erection of AB switch |
| 101 | Structure earthing in complete |
| 102 | Erection of HT Jumpers |
| 103 | Structure concreting and plastering earth pits |
| 104 | Dismantling of Bus bar arrangements |
AI Tender Summary
Tender Timeline
Mar 07, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedMar 14, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 15, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender