Kottuvally Grama Panchayath - Construction Of Op Building For Fhc Koonammavu The Scope Of The Proposed Work Includes Construction Of A Single Storied Building With Rcc Footing For Foundation, Framed Structure With Reinforced Cement Concrete Works, Plaster
Tender Overview
Project Description
Kottuvally Grama Panchayath - Construction Of Op Building For Fhc Koonammavu The Scope Of The Proposed Work Includes Construction Of A Single Storied Building With Rcc Footing For Foundation, Framed Structure With Reinforced Cement Concrete Works, Plastering Works, Ceramic Wall Tiles Etc
BOQ
| Sl. No. | Item Description |
| 1 | Soil testing for foundation by boring |
| 2 | Cleaning and clearing works |
| 3 | Ground floor |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggreagate 20mm nominal size |
| 7 | Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams,girders bressumers and cantilevers |
| 8 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers,Abutments, Posts and Struts |
| 11 | Filling with contractor\"s own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to50 m and lift up to 1.5 m as per direction of site Engineer-in-charge |
| 12 | Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) |
| 13 | Reinforced cement concrete work in chimneys, shafts, up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand(Zone III) : 3 graded stone aggregate 20 mm nominal size) |
| 14 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggreagate 20mm nominal size) |
| 15 | Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishingand reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) |
| 16 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement :1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). |
| 17 | Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 18 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 19 | Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available sizeconfirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM1:6 ( 1 cement : 6 coarse sand) etc complete |
| 20 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 21 | 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete |
| 22 | Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to bespecified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green,black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mmthick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kgper sqm, including pointing in white cement mixed with pigment of matching shade complete |
| 23 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by themanufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory,Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), includingpointing the joints with white cement and matching pigment etc., complete |
| 24 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 25 | Plumbing and sanitary works including septic tank and soak pit |
| 26 | Electrical works |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.