| 1 | Appendix-A:Working Charges |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 3 | Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 4 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR) |
| 5 | Engaging Coolie |
| 6 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009) |
| 7 | Supply of uPVC Pipe, IS 4985:2000 , 6kg/cm2, 63mm Dia.. |
| 8 | Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials).63 mm nominal outer dia pipes. |
| 9 | Interconnecting the newly laid 63mm PVC Pipe line to the existing 200mm CI Pipeline by using 200x50mm MS saddle clamp and 63mm PVC threaded adapter, etc. supplied by the contractor and placing in position,jointingand testing to the required test pressure,including cost of saddle clamp,adapter,labour charges and hire for tools,etc..complete. |
| 10 | Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 11 | Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 13 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) |
| 14 | Providing 20mm (3/4 inch) house connection with 20mm(3/4 inch)water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule,GM full way wheel valve, Elbow,MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter,lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. |
| 15 | Preparation of water supply service connection procedure including preparation of location sketches as per KWA regulation and preparation of agreement in stamp paper worth 200/- with necessary documents (statutory) etc including cost of ISI marked 20 mm B Class water meter and Ferro cement meter box standard size as directed by Dept. officers (including cost of application from KWA but excluding connection fee |