Expansion Of Sub Market Yard At Takarla, Distt. Una H.P. ( Sh Proposed Shed In Front Of 10 Nos Godowns. )
Tender Value
55.25 Lakhs
Estimated cost
Bid Submission
19 Mar 2022
0 days left
EMD
88000
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Una → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Expansion Of Sub Market Yard At Takarla, Distt. Una H.P. ( Sh Proposed Shed In Front Of 10 Nos Godowns. )
BOQ
| Sl. No. | Item Description |
| 1 | Excavationin foundation trenches etc. in earth work in all heights anddepth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chisellingand wedging out of rock (where blasting is prohibited) andtheir intermediate classificationof soilsincluding, dewatering wherever required, settingout to required lines,levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour ,machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required ). |
| 2 | Providing and laying mechanically mixed vibrated cement concrete 1:4:8 (1 cement:4 sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth:as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 3 | Stone fillingunder floor dry hand packed with hard stone of approved quality consolidated properly with hand or mechanical hammer to required level as perHP.PWD specification 1990 Volume-1 including carriage of materials, labour tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 4 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters) thick,welded with angle iron in frame30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete workin foundation, footing, basis of column etcetra . and massconcrete complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 5 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Columns, pillars post and struts (square rectangular or polygonal in plain in any heights / thickness/depths etcetera upto all foor level as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 6 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Beams, cantilevers, girders and lintels, sides of soffits of beams, beams haunchings, girders, cantilevers, bressumers and lintels uptoanydepth /heights upto all floor levelas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-charge including carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 7 | Providing and laying cement concrete M25 design mix mechanically mixed and vibrated, curing completeexcluding cost of form work and reinforcement for reinforced concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plantthrough all modes of transportion within all leads and liftsand as per direction of Engineer-in- Charge in Foundation footing bases if columns and the like and mass concrete, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor all level. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 8 | Providing and laying cement concrete M25 design mix mechanically mixed and vibrated, curing completeexcluding cost of form work and reinforcement for reinforced concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plantthrough all modes of transportion within all leads and liftsand as per direction of Engineer-in- Charge in suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor all level. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 9 | Providing and laying cement concrete M25 mechanically mixed and vibrated, curing completeexcluding cost of form work and reinforcement for reinforced concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plantthrough all modes of transportion within all leads and liftsand as per direction of Engineer-in- Charge in columns, pillars, posts and struts. Square, rectangular or polygonal in plan,in all floor level in all heights.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 10 | Providing Tor steel reinforcement of TATA Tiscon/SAIL/Rashtria Ispat incluiding cost of binding wire for R.C.C. work including cutting, bending, binding and placing in position complete in all floor levels inall heights including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 11 | Providing steel work of TATA, SAIL or RASHTRIYA ISPAT welded in built up sections/hollow section intrusses and framed work, including cutting,hoisting , fixing in positionand applying a priming coat of red lead paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. a) In trusses and trussed purlings in buildings |
| 12 | Providing and fixing 0.60mm thick prepainted steel sheet of TATA Durashine in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 13 | Providing 15 mm cement plaster in single coat on fair side of brick/concrete walls for internal /external plastering in all floor level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80 mm in girth and finished even and smooth. Cement mortar 1:6 (One cement : Six sand) including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 14 | Providing 15 mm thick cement plaster in single coat on the rough side of brick/concrete walls for internal /external plastering in all floor level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80 mm in girth and finished even and smoothcement mortar 1:6 (1 cement : 6 sand) including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 15 | Providing and fixing valley 60 cm overall 0.60mm thick prepainted steel sheet in roofing with hot dipped metalic zinc coated sheet with top coat of regular modified polyster organic coating of back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks bolts and nuts 6mm dia with prepainted G.I. limpt and bitumen washers complete with all accessories as required as per the direction of Engineer- in Charge,including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 16 | Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 17 | Applying priming coat on new concrete/masonry/asbestos cement/plastered surfaces after and including preparing the surface by thoroughly cleaning oil grease dirt ad other foreignmatter and sand papering as required with Readymixed primer,I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 18 | Distempering two coatswithIstquality oil bound washable distemper of Asian paints or equivalent of approved shadeand manufacture and of required shade on undecorated wall surfaces to give an even shade over and including a priming coat with distemper primer of approved brand and manufacture after thoroughly brushing the surface free from mortar droppings and other foreign matter and also including preparing the surface even and sand papered smooth priming coat with distemper primerfor all floorsincluding entire carriage of materials through all modes of transportation with in all leads and lifts as per PWD specifications and as per direction of Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 19 | Finishing wallwith weather proof exterior gradeemulsion of approved design (Apexultima) of Asian paints/Nerolac paints or its equarlied brand and manufacture ofapproved shadeon undecorated concrete / stone / plastered wall surfaces with two coats to give an even shade andfinal finish afterthoroughly cleaning / brushing the surfaces free from alldirt, dustmortar dropping and other foreign matter and sand papered smooth including applyingof puttyas required for making the surfaces upto all floor levelcompleteas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the govt. |
| 20 | Providing and fixing 150mm(one hundred fifty milimeter) dia pipes on wall face PVC (D-Plast) rain water pipes of working pressure not less than 4.5 kg/sqm(four point five kilogramme per square mete. including filling the joints with approved adhesive complete.as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 21 | Providing and fixing M.S. sheet holder bat clamps of approved design to 150mm dia PVC pipes embeded in and including cement concrete blocks 10x10x10 cm of 1:2:4:mix (1 cement 2 sand 4 stone graded stone aggregate 20 mm nominal size) and cost of cutting holes and making good the wall etc. complete as per HP.PWD., specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 22 | Providing and fixing on wall face PVC accessories for rain water pipe including filling the jointswith approved adhesive complete 150mm (One hundredfifty milimetre) nominal size including carriage of materials through all modes of transportion with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. a) PVCPlain bend 150mm(One hundred fifty milimetre) dia. |
| 23 | Applying cement slurry on R.C.C.slab or cement concrete work using2.75 kg. of cement per sq.metre offloor area before laying cement concrete flooring including roughening, cleaning of theconcrete surfaces completeincludng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 24 | P/L reinforced in grading of roofing with cement concrete1:2:4( one cement : two sand : fourgraded crushed hard stone aggregate 20 mm (twenty milimeter) nominal size) ,mechanically mixed vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete work as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. inFoundations,footings bases of columns and the like and mass concrete. |
| 25 | Demolition below G.L. upto 1.50 Metres depth and disposal of unserviceable materials within all leads & lifts lead Un-reinforecd cement concrete more than 15 cm thickness, within all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge |
AI Tender Summary
Tender Timeline
Mar 04, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedMar 19, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 22, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender