|
| 1 | Remuneration for Local Staff (inclusive of per diem allowance) |
| 2 | Team Leader cum Senior HighwayEngineer |
| 3 | Senior Survey Engineer |
| 4 | EnvironmentalSpecialist |
| 5 | Quantity Surveyor/ Documentation Expert |
| 6 | Land acquisition Expert |
| 7 | Utility Expert |
| 8 | Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) |
| 9 | Position |
| 10 | Position |
| 11 | Position |
| 12 | Position |
| 13 | Position |
| 14 | Position |
| 15 | Position |
| 16 | Support Staff (inclusive of per diem allowance)Note: To be assessed by consultant as per requirement of assignment |
| 17 | Office Manager |
| 18 | Typist |
| 19 | Office Boy |
| 20 | Night Watchman |
| 21 | Transportation (Fixed Costs) |
| 22 | The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. |
| 23 | Duty Travel to Site (Fixed Costs) |
| 24 | Trips |
| 25 | Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc. |
| 26 | Office Rent |
| 27 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 28 | Office Supplies Drafting |
| 29 | Supplies Computer |
| 30 | Running Costs |
| 31 | Domestic and International Communication |
| 32 | Office Furniture and Equipment (Rental) |
| 33 | Office Furniture and Equipment |
| 34 | Reports and Document Printing |
| 35 | Monthly Report (3 copies per month) |
| 36 | Updated Environment and Social Impact |
| 37 | Strip Plan with L.A. Reports |
| 38 | Draft LA and Clearances I Report |
| 39 | Final LA and Clearances I Report |
| 40 | Draft Environmental Assessment report& RAP |
| 41 | Final Environmental Assessment report& RAP |
| 42 | Updated bill of quantities, Updated cost estimates |
| 43 | Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition(3 copies each) |
| 44 | LA & Clearances II Report |
| 45 | Investigation (Fixed cost)(lumpsum) |
| 46 | Land Acquisition Studies |
| 47 | Any other investigations/surveys |
| 48 | Fixing Boundary pillars |
| 49 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fixboundarypillarsalongtheproposedalignmentontheextreme boundary on either side of the project Highway at 50 m interval |
| 50 | Land Acquisition Team including support staff and logistics/transportation |
| 51 | Ex-Land Revenue Inspector/Officer or equivalent |
| 52 | Ex-Kanoogo/Girdwar or equivalent |
| 53 | Ex-Patwari or equivalent |
| 54 | Typist (2 nos.x6Months) |
| 55 | Peon |
| 56 | Logistics for Land acquisition Team |
| 57 | Computer including necessaryperipherals (2 nos.x6 Months) |
| 58 | Printers (2 nos.x 6 Months) |
| 59 | Vehicles (Bolero or equivalent)with monthly running limit of 4000 km |
| 60 | Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder) |
| 61 | Position |
| 62 | Position |
| 63 | Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns) |
| 64 | Moblization and Demoblization-Inland Travel in Home country (Fixed Costs) |
| 65 | Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) |