Name of Work: Providing operational assistance in coal feeding and coal yard management of CHP, BTPS, Anpara
Sl. No.
Item Description
1
Providing Assistance for round the clock operation of Paddle Feeder at Track Hopper.
2
Providing Assistance for round the clock operation of Travelling Tripper at Bunker Floor.
3
Providing Assistance for round the clock operation of Stacker/re claimer machine.
4
Providing Assistance for round the clock operation works at TP-25.
5
Providing Assistance for round the clock operation works at TP-22/Primary Crusher House.
6
Providing Assistance for round the clock operation works at TP-28.
7
Providing Assistance for round the clock operation works at TP-29.
8
Round the clock operation, routine minor maintenance and general up keeping (Cleaning & Sweeping of the floor area in front of 03 nos. door at different level (zero meter to54 mtr. etc & Machine room) of KONE make elevator at TP-25 of CHP-2X500MW, BTPS (08 Hrs. shift basis).
9
Round the clock operation, routine minor maintenance and general up keeping (Cleaning & Sweeping of the floor area in front of 04nos. door at different level (zero meter to 35 mtr. etc & Machine room) of KONE make elevator at SCH Building of CHP-2X500MW, BTPS (08 Hrs. shift basis).
10
Painting & Polishing, as and when required for Kone make elevator.
11
Wetting of coal stacked in secondary coal yard of Coal Handling Plant–2x500MW for dust suppression and for quenching of fire.
12
Cleaning of drainage system provided in and around of Secondary Coal Yard and Dust Extraction Settlement Tank near Secondary Crusher house up to the main channel passing near the road between Secondary and Primary Crusher house.
13
Removal of grating choking from track hopper of ‘B’TPS during dozering of coal from primary coal yard through track hopper coal feeding gate of ‘B’TPS track hopper as and when required including other allied works as per scope of work.
14
Site Store handling / Up keeping
15
Water Sprinkling for dust suppression over loaded coal wagons while entering at the tail end of the track hopper & during unloading of coal at track hopper and fire quenching in primary yard in CHP, 2X500MW, BTPS, Anpara
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.