Work Contract For Capital Overhaul Of Pressure Parts ( Coh ) At 210 Mw Atps Mppgcl Chachai.-2 Cleaning Of Boiler 3 Complete External Cleaning Of Boiler From Top To Bottom 4 Internal Cleaning Of Boiler In Second Pass 5 Cleaning Of Ash Fr, chachai-Madhya Pradesh

Madhya Pradesh Power Generating Company Limited-MPPGCL has published Work Contract For Capital Overhaul Of Pressure Parts ( Coh ) At 210 Mw Atps Mppgcl Chachai.-2 Cleaning Of Boiler 3 Complete External Cleaning Of Boiler From Top To Bottom 4 Internal Cleaning Of Boiler In Second Pass 5 Cleaning Of Ash Fr. Submission Date for this Tender is 21-03-2022. Boiler Supply Tenders in chachai Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

31257451
Work Contract For Capital Overhaul Of Pressure Parts ( Coh ) At 210 Mw Atps Mppgcl Chachai.-2 Cleaning Of Boiler 3 Complete External Cleaning Of Boiler From Top To Bottom 4 Internal Cleaning Of Boiler In Second Pass 5 Cleaning Of Ash Fr
Open Tender
Indian
Madhya Pradesh
chachai
21-03-2022

Tender Details

Work Contract For Capital Overhaul Of Pressure Parts ( Coh ) At 210 Mw Atps Mppgcl Chachai.-2 Cleaning Of Boiler 3 Complete External Cleaning Of Boiler From Top To Bottom 4 Internal Cleaning Of Boiler In Second Pass 5 Cleaning Of Ash From Economiser Hopper With Connecting Ducts 6 Cleaning Of Pent House, Cat House, Dead Chamber 7 Cleaning Of Pent House Roof 8 Preparation Of Scaffolding 9 Preparation Of Scaffolding In Boiler Horizontal Pass ( Screen Tubes, Reheater, Final Super Heater ) 10 Preparation Of Scaffolding Above Economiser Hopper For Inspection Of Economiser Lower Bank Coils & C-Header. 11 Preparation Of Quick Erect Scaffolding System ( Cup-Lock System ) In Boiler Furnace ( From Top To Bottom ) 12 Preparation Of Scaffolding In Wind Box 13 Preparation Of Scaffolding In Bottom Ash Hopper 14 Inspection 15 Inspection Of Complete Boiler Pressure Parts ( Ist & Iind Pass ) 16 Inspection & Repair Of All Doors , Windows And Peep Holes In Boiler 17 Internal Inspection & Cleaning Of Boiler Drum 18 Cleaning And Repair Of Wind Box 19 With Steel 20 Without Steel 21 Dye Penetration Test ( Dp Test ) With Kit 22 Transportation Of Ash, Scraps, Debries And Other Waste Materials ( Including Loading / Unloading ) 23 Hydro Jet Cleaning Of Complete Boiler Pressure Parts 24 Platen Superheater Coils. 25 Re-Heater Coils. 26 Water Wall ( Front, Rear, Left & Right ) 27 Section-B 28 Assistance In Radiography 29 Rectification, Replacement And Refixing Of Protection Sleeve ( Shielding ) In Various Areas Of Boiler Tubes. 30 Rectification, Replacement And Refixing Of Cassette Bafflesin Various Areas Of Boiler Tubes. 31 Preparation Of Boiler Tube Surface For Tube Thickness Survey / Oxide Scale Measurement / Stress Relieving 32 Welding Of Hp Joints Of Boiler Tubes 33 Water Wall Tubes-Screen Tubes, Hanger Tubes, Rear Arch Tubes Etc. 34 Platen Superheater Tubes 35 Ltsh Tubes And Associated Steam Cooled Wall 36 Final Superheater Tubes 37 Roof Tubes 38 Reheater 39 Economisertubes 40 Instrument Pipings 41 Welding Of Fins 42 Re-Enforcement Of Welded Joints ( A ) Economiser ( B ) Sling ( C ) Reheater ( D ) Drumvent ( E ) Ltsh 43 Welding & Replacement Of Drain Joints 44 Welding & Replacement Of Tracing Line / Sampling Line 45 Pad Welding Of Eroded Tubes Of Various Size 46 Pad Welding Of Boiler Tubes At Various Locations ( Size 50Mm X 50Mm ) 47 Alignment Of Coils / Tubes / Blowers 48 Alignment Of Wallblowers / Servicing Of Wall Blowers 49 Alignment / Servicing Of Long Retractable Soot Blower 50 Assistance In Hydraulic Test Of Boiler Pressure Part & Preparation For Boiler Light Up 51 Application Of Refractory At Various Locations Of Boiler ( Gr.A+Gr.C ) 52 Application Of Refractory At Various Locations Of Boiler ( Grade A ) 1.Rear Arch2. Soot Bolwer Area 3. Other Locations 4. Burner Mouth 53 Application Of Refractory At Various Locations Of Boiler ( Grade C ) ( 1 ) . Pent House, Door, Window Manhole & Peephole, Etc ( 2 ) Dead Chamber & Screen Valve ( 3 ) Flue Gas Erosion Plate Of Ltsh & Eco Bend ( 4 ) Cooling Pipe Of Seal Plate ( 5 ) Other Areas ( Like Hopper Header Etc. ) 54 Section-C 55 Complete Servicing / Overhauling Of Hp Valves 56 Gland Packing Of Hp Valves 57 Upto 25 Mm 58 25 Mm To 50 Mm 59 50Mm To 100 Mm 60 100 Mm To 200 Mm 61 Above 200 Mm 62 Completeservicing Of Valves ( Excluding Actuator ) : 63 Upto 25 Mm 64 25 Mm To 50 Mm 65 50 Mm To 100 Mm 66 Above 200 Mm 67 Replacement Of Valves ( Welded Type ) 68 Upto 25 Mm 69 25 Mm To 50 Mm 70 50 Mm To 100 Mm 71 100 Mm To 200 Mm 72 Servicing Of Boiler Fill Pump 73 Section-D 74 Complete Servicingofspring Loaded Safety Valves ( Sv ) 75 Boiler Drum Sv 76 Main Steam Lines Sv 77 Crh Lines Sv 78 Hrhlines Sv 79 Servicing Of Soot Blower Safety Valve 80 Section-E 81 Preparation / Fabrication Of Hp Tube Bends 82 Repair Of Pent House Of Boiler 83 Repair Of Pent House By Patching ( Without Steel ) 84 Dismanteling Of Steel Structures / Installation Of New Steel Structures ( With Steel ) 85 Repairing Of Dead Chamber 86 Repair Of Dead Chamberby Patching 87 Dismanteling Of Steel Structures / Installation Of New Steel Structures 88 Repair & Servicing 89 Buckstays 90 Repalcement / Repairing Of Economiser Module ( Consist Of 2 Coils Both Lower & Upper Bank ) 91 Painting Of Taken Out Economiser Coils 92 Repairing Of Cat House 93 With Steel 94 Without Steel 95 Servicing, Cleaning & Repairing Of Sampling Line Coolers 96 Servicing & Repairing Of Hangers & Supports 97 Section-F 98 Fixing Of Corrugated Gi Sheet At Boiler Roof & Other Places 99 Painting Of Boiler Base Structure 100 Disposal Of Rubbish Thermal Insulation 101 Repairing Of Header Stubs Hand Hole Plugs 102 Insulation Work 103 Removal / Application Of Thermal Insulation In Complete Boiler From Bottom Ash Hopper To Pent House 104 Removal / Application Of Thermal Insulation In Steam And Water Piping 105 Removal / Application Of Thermal Insulation In Esp 106 Removal / Application Of Thermal Insulation Inair Heater & Hopper 107 Flue Gas & Hot Air Duct 108 Sheeting Work Over Insulation ( Where Insulation Is In Good Condition )

Key Value

Document Fees
INR 5000 /-
EMD
INR 250000.0 /-
Tender Value
INR 1.43 Crore /-

BOQ Items

Name of Work: Work contract for AOH of Pressure Parts of 1X210 MW Unit ATPS, Chachai.
Sl. No. Item Description
1SECTION-A
2CLEANING OF BOILER
3COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM
4INTERNAL CLEANING OF BOILER IN SECOND PASS
5CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
6CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
7CLEANING OF PENT HOUSE ROOF
8PREPARATION OF SCAFFOLDING
9PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER)
10PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
11PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM)
12PREPARATION OF SCAFFOLDING IN WIND BOX
13PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER
14INSPECTION
15INSPECTION OF COMPLETE BOILER PRESSURE PARTS (IST & IIND PASS)
16INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
17INTERNAL INSPECTION & CLEANING OF BOILER DRUM
18CLEANING AND REPAIR OF WIND BOX
19WITH STEEL
20WITHOUT STEEL
21DYE PENETRATION TEST (DP TEST) WITH KIT
22TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS ( INCLUDING LOADING/UNLOADING)
23HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
24PLATEN SUPERHEATER COILS.
25RE-HEATER COILS.
26WATER WALL ( FRONT, REAR, LEFT & RIGHT)
27SECTION-B
28ASSISTANCE IN RADIOGRAPHY
29RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING)IN VARIOUS AREAS OF BOILER TUBES.
30RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLESIN VARIOUS AREAS OF BOILER TUBES.
31PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING
32WELDING OF HP JOINTS OF BOILER TUBES
33WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
34PLATEN SUPERHEATER TUBES
35LTSH TUBES AND ASSOCIATED STEAM COOLED WALL
36FINAL SUPERHEATER TUBES
37ROOF TUBES
38REHEATER
39ECONOMISERTUBES
40INSTRUMENT PIPINGS
41WELDING OF FINS
42RE-ENFORCEMENT OF WELDED JOINTS (a) ECONOMISER (b) SLING( c) REHEATER (D) DRUMVENT ( E) LTSH
43WELDING & REPLACEMENT OF DRAIN JOINTS
44WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
45PAD WELDING OF ERODED TUBES OF VARIOUS SIZE
46PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM)
47ALIGNMENT OF COILS/ TUBES / BLOWERS
48ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS
49ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER
50ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
51APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)
52APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A) 1.REAR ARCH2. SOOT BOLWER AREA 3. OTHER LOCATIONS 4. BURNER MOUTH
53APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C) (1). PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC (2)DEAD CHAMBER & SCREEN VALVE (3) FLUE GAS EROSION PLATE OF LTSH & ECO BEND (4) COOLING PIPE OF SEAL PLATE (5) OTHER AREAS (LIKE HOPPER HEADER ETC.)
54SECTION-C
55COMPLETE SERVICING/OVERHAULING OF HP VALVES
56GLAND PACKING OF HP VALVES
57UPTO 25 MM
5825 MM TO 50 MM
5950MM TO 100 MM
60100 MM TO 200 MM
61ABOVE 200 MM
62COMPLETESERVICING OF VALVES (EXCLUDING ACTUATOR):
63UPTO 25 MM
6425 MM TO 50 MM
6550 MM TO 100 MM
66ABOVE 200 MM
67REPLACEMENT OF VALVES (WELDED TYPE)
68UPTO 25 MM
6925 MM TO 50 MM
7050 MM TO 100 MM
71100 MM TO 200 MM
72SERVICING OF BOILER FILL PUMP
73SECTION-D
74COMPLETE SERVICINGOFSPRING LOADED SAFETY VALVES (SV)
75BOILER DRUM SV
76MAIN STEAM LINES SV
77CRH LINES SV
78HRHLINES SV
79SERVICING OF SOOT BLOWER SAFETY VALVE
80SECTION-E
81PREPARATION / FABRICATION OF HP TUBE BENDS
82REPAIR OF PENT HOUSE OF BOILER
83REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
84DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
85REPAIRING OF DEAD CHAMBER
86REPAIR OF DEAD CHAMBERBY PATCHING
87DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES
88REPAIR & SERVICING
89BUCKSTAYS
90REPALCEMENT/ REPAIRING OF ECONOMISER MODULE (CONSIST OF 2 COILS BOTH LOWER & UPPER BANK)
91PAINTING OF TAKEN OUT ECONOMISER COILS
92REPAIRING OF CAT HOUSE
93WITH STEEL
94WITHOUT STEEL
95SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
96SERVICING & REPAIRING OF HANGERS & SUPPORTS
97SECTION-F
98FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
99PAINTING OF BOILER BASE STRUCTURE
100DISPOSAL OF RUBBISH THERMAL INSULATION
101REPAIRING OF HEADER STUBS HAND HOLE PLUGS
102Insulation Work
103REMOVAL / APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
104REMOVAL / APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
105REMOVAL /APPLICATION OF THERMAL INSULATION IN ESP
106REMOVAL / APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER
107FLUE GAS & HOT AIR DUCT
108SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail