Madhya Pradesh Power Generating Company Limited-MPPGCL has published Work Contract For Capital Overhaul Of Pressure Parts ( Coh ) At 210 Mw Atps Mppgcl Chachai.-2 Cleaning Of Boiler 3 Complete External Cleaning Of Boiler From Top To Bottom 4 Internal Cleaning Of Boiler In Second Pass 5 Cleaning Of Ash Fr. Submission Date for this Tender is 21-03-2022. Boiler Supply Tenders in chachai Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | SECTION-A |
2 | CLEANING OF BOILER |
3 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM |
4 | INTERNAL CLEANING OF BOILER IN SECOND PASS |
5 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS |
6 | CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER |
7 | CLEANING OF PENT HOUSE ROOF |
8 | PREPARATION OF SCAFFOLDING |
9 | PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER) |
10 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER. |
11 | PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) |
12 | PREPARATION OF SCAFFOLDING IN WIND BOX |
13 | PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER |
14 | INSPECTION |
15 | INSPECTION OF COMPLETE BOILER PRESSURE PARTS (IST & IIND PASS) |
16 | INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER |
17 | INTERNAL INSPECTION & CLEANING OF BOILER DRUM |
18 | CLEANING AND REPAIR OF WIND BOX |
19 | WITH STEEL |
20 | WITHOUT STEEL |
21 | DYE PENETRATION TEST (DP TEST) WITH KIT |
22 | TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS ( INCLUDING LOADING/UNLOADING) |
23 | HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS |
24 | PLATEN SUPERHEATER COILS. |
25 | RE-HEATER COILS. |
26 | WATER WALL ( FRONT, REAR, LEFT & RIGHT) |
27 | SECTION-B |
28 | ASSISTANCE IN RADIOGRAPHY |
29 | RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING)IN VARIOUS AREAS OF BOILER TUBES. |
30 | RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLESIN VARIOUS AREAS OF BOILER TUBES. |
31 | PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING |
32 | WELDING OF HP JOINTS OF BOILER TUBES |
33 | WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC. |
34 | PLATEN SUPERHEATER TUBES |
35 | LTSH TUBES AND ASSOCIATED STEAM COOLED WALL |
36 | FINAL SUPERHEATER TUBES |
37 | ROOF TUBES |
38 | REHEATER |
39 | ECONOMISERTUBES |
40 | INSTRUMENT PIPINGS |
41 | WELDING OF FINS |
42 | RE-ENFORCEMENT OF WELDED JOINTS (a) ECONOMISER (b) SLING( c) REHEATER (D) DRUMVENT ( E) LTSH |
43 | WELDING & REPLACEMENT OF DRAIN JOINTS |
44 | WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE |
45 | PAD WELDING OF ERODED TUBES OF VARIOUS SIZE |
46 | PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM) |
47 | ALIGNMENT OF COILS/ TUBES / BLOWERS |
48 | ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS |
49 | ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER |
50 | ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP |
51 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C) |
52 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A) 1.REAR ARCH2. SOOT BOLWER AREA 3. OTHER LOCATIONS 4. BURNER MOUTH |
53 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C) (1). PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC (2)DEAD CHAMBER & SCREEN VALVE (3) FLUE GAS EROSION PLATE OF LTSH & ECO BEND (4) COOLING PIPE OF SEAL PLATE (5) OTHER AREAS (LIKE HOPPER HEADER ETC.) |
54 | SECTION-C |
55 | COMPLETE SERVICING/OVERHAULING OF HP VALVES |
56 | GLAND PACKING OF HP VALVES |
57 | UPTO 25 MM |
58 | 25 MM TO 50 MM |
59 | 50MM TO 100 MM |
60 | 100 MM TO 200 MM |
61 | ABOVE 200 MM |
62 | COMPLETESERVICING OF VALVES (EXCLUDING ACTUATOR): |
63 | UPTO 25 MM |
64 | 25 MM TO 50 MM |
65 | 50 MM TO 100 MM |
66 | ABOVE 200 MM |
67 | REPLACEMENT OF VALVES (WELDED TYPE) |
68 | UPTO 25 MM |
69 | 25 MM TO 50 MM |
70 | 50 MM TO 100 MM |
71 | 100 MM TO 200 MM |
72 | SERVICING OF BOILER FILL PUMP |
73 | SECTION-D |
74 | COMPLETE SERVICINGOFSPRING LOADED SAFETY VALVES (SV) |
75 | BOILER DRUM SV |
76 | MAIN STEAM LINES SV |
77 | CRH LINES SV |
78 | HRHLINES SV |
79 | SERVICING OF SOOT BLOWER SAFETY VALVE |
80 | SECTION-E |
81 | PREPARATION / FABRICATION OF HP TUBE BENDS |
82 | REPAIR OF PENT HOUSE OF BOILER |
83 | REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL) |
84 | DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL) |
85 | REPAIRING OF DEAD CHAMBER |
86 | REPAIR OF DEAD CHAMBERBY PATCHING |
87 | DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES |
88 | REPAIR & SERVICING |
89 | BUCKSTAYS |
90 | REPALCEMENT/ REPAIRING OF ECONOMISER MODULE (CONSIST OF 2 COILS BOTH LOWER & UPPER BANK) |
91 | PAINTING OF TAKEN OUT ECONOMISER COILS |
92 | REPAIRING OF CAT HOUSE |
93 | WITH STEEL |
94 | WITHOUT STEEL |
95 | SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS |
96 | SERVICING & REPAIRING OF HANGERS & SUPPORTS |
97 | SECTION-F |
98 | FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES |
99 | PAINTING OF BOILER BASE STRUCTURE |
100 | DISPOSAL OF RUBBISH THERMAL INSULATION |
101 | REPAIRING OF HEADER STUBS HAND HOLE PLUGS |
102 | Insulation Work |
103 | REMOVAL / APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE |
104 | REMOVAL / APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING |
105 | REMOVAL /APPLICATION OF THERMAL INSULATION IN ESP |
106 | REMOVAL / APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER |
107 | FLUE GAS & HOT AIR DUCT |
108 | SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail